X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20559

Well Details

Well ID: 37-131-20559
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Meshoppen Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 149321
Farm/Lease Name: SLUMBER VALLEY 23H
License Status:
Spud Date:
Permit Date: 2018-09-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.618031
Longitude: -76.012625

For data sources see[1][2][3]

Well History

Date Event
2018-09-06 New Permit Application
2019-01-04 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CHESAPEAKE APPALACHIA LLC 1,620,344.00 218 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 26.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 22.25 Tons LANDFILL 301358
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 182.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 CHESAPEAKE APPALACHIA LLC Drill Cuttings 256.79 Tons LANDFILL THR029
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 770.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 10.44 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Drill Cuttings 620.02 Tons LANDFILL 100933
2019 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 16.08 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,363.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Soil Contaminated by Oil 25.84 Tons LANDFILL 301358
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 82.50 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 262.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 25.84 Tons LANDFILL 301358
2019 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 1,678.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 352.25 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 275.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE006

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2828470 Primary Facility 2019-01-17 Drilling/Alteration No Violations Noted Arrived on location at 09:30. Weather: Clear, cold ~ 18 degs. Onsite to perform routine inspection of (3) recently spud wells on pad. Upon inspection, (3) new 20" conductors, 16" mouse-holes and precast cellar units have been installed for the SV 3H, 22H & 23H wells. One additional well the SV 1H, which was previously in production, has been temp. shut in and disconnected from production unit. All production piping has been removed.
  Liner, drill mats, mud tanks and containment have been installed on location in preparation for drilling of (3) new wells. 
  Overall, wells and location were found in good condition with no obvious concerns or violations noted. Left location at 10:30.
  (See attached pics for further info.)
2851558 Primary Facility 2019-02-08 Drilling/Alteration No Violations Noted I arrived at the site at 12:57. The weather conditions are partly cloudy skies and breezy, with temperatures in the mid to upper 40's. The site is quite muddy due to recent snowmelt and precipitation events. Patterson UTI Drilling Rig # 334 is at the location. CHK submitted a Drilling Resumption After Break of 30 or more notification to the Department on 1/25/19. The notice indicated that CHK would commence drilling of the Slumber Valley 3H well on 1/26/19 at 5 AM. I met with Will Doby, site company man, and consultant of CHK. Mr. Doby provided a description of site operations. He stated the following. "The 3H well is done. Cementing of the production casing was completed at 9AM today, 2/8/18. The cement head is rotated. A total of (130) barrels of cement have returned to the surface. The well was drilled to a total depth of (14,571) feet. We are cleaning out the mud pits now. The fluid in the mud pits will be sent to the CHK Sharer site. It is a 50/50 mix of oil and water based drilling mud in