If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20466 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.625408,"lon":-75.960486,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Washington Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 151132 | |
Farm/Lease Name: GARRISON WYO 4H | |
License Status: INACTIVE | |
Spud Date: | |
Permit Date: 2014-08-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.625408 | |
Longitude: -75.960486 |
Date | Event |
---|---|
2014-08-13 | New Permit Application |
2014-10-27 | Performed Spud Operation |
2015-01-23 | Drilling Completion |
2016-05-05 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-03 | 2018-03-15 | 7,748 | 14,226,600 | 573,940 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HCL 5.1 - 7.5 | BJ SERVICES | Acid | Hydrochloric Acid | 007647-01-0 | 0.08 | 0.0007 | 0 |
Water | 007732-18-5 | 0.93 | 0.00858 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.73476 | 0 | |
ResCare IC 300L | BJ SERVICES | Iron Control Agent | Citric Acid | 000077-92-9 | 0.5 | 0.00003000 | 0 | |
ThinFrac MP I | BJ SERVICES | Friction Reducer | Oxyalkylated alcohol | Trade Secret | 0.05 | 0.00004000 | 0 | |
Distillates (petroleum), Hydrotreated Light | 64742-47-8 | 0.3 | 0.00026 | 0 | ||||
Sodium Chloride | 7647-14-5 | 0.05 | 0.00004000 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.10392 | 0 | |
FracCare SI720 | BJ SERVICES | Scale Inhibitor | Ethylene Glycol | 000107-21-1 | 0.35 | 0.00008000 | 0 | |
Diethylene Glycol | 000111-46-6 | 0.05 | 0.00001000 | 0 | ||||
Northern White Sand | BJ SERVICES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 1 | 0.15085 | 0 | |
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 0.01 | 0 | 0 | |
CI-14 | BJ SERVICES | Corrosion Inhibitor | Methanol (Methyl Alcohol) | 000067-56-1 | 0.7 | 0.00001000 | 0 | |
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 0.05 | 0 | 0 | ||||
Proprietary Fatty Acids | Trade Secret | 0.1 | 0 | 0 | ||||
Proprietary Olefin | Trade Secret | 0.05 | 0 | 0 | ||||
Proprietary Polyoxyalkylenes | Trade Secret | 0.2 | 0 | 0 | ||||
ThinFrac Plus FRHV-49C | BJ SERVICES | Friction Reducer | Oxyalkylated alcohol | Trade Secret | 0.05 | 0 | 0 | |
Substituted alkylamine | Trade Secret | 0.01 | 0 | 0 | ||||
Proprietary Inorganic Salt | Trade Secret | 0.1 | 0 | 0 | ||||
Distillates (petroleum), Hydrotreated Light | 64742-47-8 | 0.3 | 0.00001000 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 1,041,469.00 | 269 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 933,051.00 | 359 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 426.14 Tons | LANDFILL | THR029 |
2015 | CHESAPEAKE APPALACHIA LLC | Drilling Fluid Waste | 2,917.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2015 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 261.67 Tons | LANDFILL | 8-4630-00010/00 |
2015 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 573.67 Tons | LANDFILL | 8-0728-0004/013 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 274.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 128.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 101.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 250.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 536.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 755.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 0.64 Tons | LANDFILL | 8-0728-0004/013 |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2017 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 24.60 Tons | LANDFILL | 301626 |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 27.50 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 26.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 27.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 25.04 Tons | LANDFILL | 301626 |
2018 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 4.80 Tons | LANDFILL | 8-0728-0004/013 |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 10.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 5.50 Tons | CENT WASTE TRT FAC NPDES DISCHARGE | PAG034815 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 891.70 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 234.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 814.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 284.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 3.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 5.50 Tons | CENT WASTE TRT FAC NPDES | PAG034815 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 487.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 6.59 Tons | LANDFILL | 301626 |
2019 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 60.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 291.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 53.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 0.40 Tons | LANDFILL | 301358 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 27.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2310961 | Primary Facility | 2014-10-08 | Preoperation Inspection | No Violations Noted | |
2328477 | Primary Facility | 2014-12-12 | Drilling/Alteration | No Violations Noted | |
2337625 | Primary Facility | 2015-01-15 | Drilling/Alteration | No Violations Noted | |
2343433 | Primary Facility | 2015-02-12 | Routine/Partial Inspection | No Violations Noted | |
2680566 | Primary Facility | 2018-01-09 | Routine/Complete Inspection | No Violations Noted | There was no activity at the site during the inspection. The entrance gate was unsecured and open at time of inspection. There were no violations noted. If you have any questions, please contact me. |
2715859 | Primary Facility | 2018-03-22 | Drilling/Alteration | No Violations Noted | Matt Shope, DEP O&G WQS and I arrived at the site 12:41 to conduct an inspection. The weather conditions are partly cloudy skies, quite windy and chilly with temps around 40 degrees Fahrenheit. CHK was in the process of drilling out hydraulic fracturing (stimulation) plugs. We met with Cody Blanton, site company man, completions consultant of CHK. Mr. Blanton provided us the following information in reference to site activities. "We are working on the Garrison Wyo 3H Well. We just started in the hole and are (20) joints in. There are (28) plugs to to drill out. The 4H well is done. There were (28) plugs drilled out on that well. We will drill plugs out on the the 2H well and run production tubing on the 1H well. The 1H well was in production, but it is currently shut in. We started drilling out plugs last Tuesday, 3/20/18. Gel and Friction Reducer are the main chemicals used to drill out the plugs. The name of the rig is Big Joe. The rig is a stand alone snubbing unit. This is the first time we have used thi |
For data sources see[8]