X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20466

Well Details

Well ID: 37-131-20466
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 151132
Farm/Lease Name: GARRISON WYO 4H
License Status: INACTIVE
Spud Date:
Permit Date: 2014-08-13
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.625408
Longitude: -75.960486

For data sources see[1][2][3]

Well History

Date Event
2014-08-13 New Permit Application
2014-10-27 Performed Spud Operation
2015-01-23 Drilling Completion
2016-05-05 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-03 2018-03-15 7,748 14,226,600 573,940

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL 5.1 - 7.5 BJ SERVICES Acid Hydrochloric Acid 007647-01-0 0.08 0.0007 0
Water 007732-18-5 0.93 0.00858 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.73476 0
ResCare IC 300L BJ SERVICES Iron Control Agent Citric Acid 000077-92-9 0.5 0.00003000 0
ThinFrac MP I BJ SERVICES Friction Reducer Oxyalkylated alcohol Trade Secret 0.05 0.00004000 0
Distillates (petroleum), Hydrotreated Light 64742-47-8 0.3 0.00026 0
Sodium Chloride 7647-14-5 0.05 0.00004000 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.10392 0
FracCare SI720 BJ SERVICES Scale Inhibitor Ethylene Glycol 000107-21-1 0.35 0.00008000 0
Diethylene Glycol 000111-46-6 0.05 0.00001000 0
Northern White Sand BJ SERVICES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 1 0.15085 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 0.01 0 0
CI-14 BJ SERVICES Corrosion Inhibitor Methanol (Methyl Alcohol) 000067-56-1 0.7 0.00001000 0
Propargyl Alcohol (2-Propynol) 000107-19-7 0.05 0 0
Proprietary Fatty Acids Trade Secret 0.1 0 0
Proprietary Olefin Trade Secret 0.05 0 0
Proprietary Polyoxyalkylenes Trade Secret 0.2 0 0
ThinFrac Plus FRHV-49C BJ SERVICES Friction Reducer Oxyalkylated alcohol Trade Secret 0.05 0 0
Substituted alkylamine Trade Secret 0.01 0 0
Proprietary Inorganic Salt Trade Secret 0.1 0 0
Distillates (petroleum), Hydrotreated Light 64742-47-8 0.3 0.00001000 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 1,041,469.00 269 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 933,051.00 359 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CHESAPEAKE APPALACHIA LLC Drill Cuttings 426.14 Tons LANDFILL THR029
2015 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 2,917.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2015 CHESAPEAKE APPALACHIA LLC Drill Cuttings 261.67 Tons LANDFILL 8-4630-00010/00
2015 CHESAPEAKE APPALACHIA LLC Drill Cuttings 573.67 Tons LANDFILL 8-0728-0004/013
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 274.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 128.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 101.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 250.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 536.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 755.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 0.64 Tons LANDFILL 8-0728-0004/013
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2017 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 24.60 Tons LANDFILL 301626
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 27.50 Bbl REUSE (AT WELL PAD)
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 26.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 27.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 25.04 Tons LANDFILL 301626
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 4.80 Tons LANDFILL 8-0728-0004/013
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 10.00 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 5.50 Tons CENT WASTE TRT FAC NPDES DISCHARGE PAG034815
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 891.70 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 234.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 814.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 284.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 3.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 5.50 Tons CENT WASTE TRT FAC NPDES PAG034815
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 487.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 6.59 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 60.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 291.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 53.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 0.40 Tons LANDFILL 301358
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 27.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2310961 Primary Facility 2014-10-08 Preoperation Inspection No Violations Noted
2328477 Primary Facility 2014-12-12 Drilling/Alteration No Violations Noted
2337625 Primary Facility 2015-01-15 Drilling/Alteration No Violations Noted
2343433 Primary Facility 2015-02-12 Routine/Partial Inspection No Violations Noted
2680566 Primary Facility 2018-01-09 Routine/Complete Inspection No Violations Noted There was no activity at the site during the inspection. The entrance gate was unsecured and open at time of inspection. There were no violations noted. If you have any questions, please contact me.
2715859 Primary Facility 2018-03-22 Drilling/Alteration No Violations Noted Matt Shope, DEP O&G WQS and I arrived at the site 12:41 to conduct an inspection. The weather conditions are partly cloudy skies, quite windy and chilly with temps around 40 degrees Fahrenheit. CHK was in the process of drilling out hydraulic fracturing (stimulation) plugs. We met with Cody Blanton, site company man, completions consultant of CHK. Mr. Blanton provided us the following information in reference to site activities. "We are working on the Garrison Wyo 3H Well. We just started in the hole and are (20) joints in. There are (28) plugs to to drill out. The 4H well is done. There were (28) plugs drilled out on that well. We will drill plugs out on the the 2H well and run production tubing on the 1H well. The 1H well was in production, but it is currently shut in. We started drilling out plugs last Tuesday, 3/20/18. Gel and Friction Reducer are the main chemicals used to drill out the plugs. The name of the rig is Big Joe. The rig is a stand alone snubbing unit. This is the first time we have used thi

For data sources see[8]

References