X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20306

Well Details

Well ID: 37-131-20306
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Nicholson Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 145556
Farm/Lease Name: LOCH UNIT 1H
License Status:
Spud Date: 2014-01-03
Permit Date: 2013-05-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.640769
Longitude: -75.832756

For data sources see[1][2][3]

Well History

Date Event
2013-05-31 New Permit Application
2014-01-04 Performed Spud Operation
2014-04-29 Drilling Completion
2014-05-22 Perforation
2014-06-04 Performed Stimulation
2014-08-22 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-04 2014-06-08 7,681 8,263,250

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.91 0
Hydrochloric Acid 10-30% Halliburton Acid Hydrochloric Acid 7647-01-0 30 0.04 0
MCS-2510T MULTI-CHEM Scale Inhibitor ETHYLENE GLYCOL 107-21-1 60 0.005 0
FR-66 Halliburton Friction Reducer Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.02 0
MCB-8614 MULTI-CHEM BIOCIDE ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE 68424-85-1 5 0.003 0
GLUTARALDEHYDE 111-30-8 30 0.02 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-06-04 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHIEF OIL & GAS LLC 741,251.00 189 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 960,782.82 365 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 844,166.62 365 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 754,042.35 365 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 559,448.42 365 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 364,756.62 348 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste 479.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 615.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Drill Cuttings 688.88 Tons LANDFILL 100933
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 11,095.60 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste 385.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Produced Fluid 14,168.31 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Produced Fluid 2,892.60 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid 1,295.96 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 654.27 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid 103.42 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CHIEF OIL & GAS LLC Produced Fluid 451.95 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 176.55 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2197208 Primary Facility 2013-08-21 Routine/Partial Inspection No Violations Noted
2238397 Primary Facility 2014-01-22 Drilling/Alteration No Violations Noted NE 11, Comp Man - Cody Rogers, @ 5170'
2265310 Primary Facility 2014-04-24 Routine/Complete Inspection No Violations Noted
2518600 Primary Facility 2016-09-12 Routine/Complete Inspection No Violations Noted
2671317 Primary Facility 2017-12-14 Routine/Complete Inspection No Violations Noted There was no activity occurring at the site during the inspection. There were no violations noted. If you have any questions, please contact me.
2725626 Primary Facility 2018-04-23 Routine/Complete Inspection No Violations Noted I conducted the inspection accompanied by Casey Baldwin (WQS/ET). Prior to the inspection, we attended a pre-construction meeting for implementation of the PCSM plan. No violations were noted. If you have any questions, please contact me.
2826348 Primary Facility 2019-01-09 Routine/Complete Inspection No Violations Noted I arrived onsite at 1406 to conduct a routine complete inspection.

This inspection was conducted in response to a well site restoration extension request received from the Operator on 11OCT2018. The purpose of the inspection was to ensure that an existing sediment basin had been converted into an infiltration basin and that the work had been performed to plan specifications.

During the inspection, I reviewed the infiltration basin and determined that it was implemented correctly in regards to the receipt of the well site restoration extension request submission. I also ensured all the berms and slopes onsite had attained adequate vegetative stabilization and ensured all temporary E&S BMPs had been removed.

No violations were noted. Please contact me if you have any questions.

For data sources see[9]

References