37-131-20160

Well Details

Well ID: 37-131-20160
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Nicholson Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 149079
Farm/Lease Name: POLOVITCH UNIT
License Status: Plugged and Abandoned
Spud Date: 2011-05-07
Permit Date: 2011-05-03
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.640767
Longitude: -75.810972

For data sources see[1][2][3]

Well History

Date Event
2011-05-03 New Permit Application
2011-05-06 Performed Spud Operation
2011-06-12 Drilling Completion
2011-08-05 Perforation
2011-08-05 Performed Stimulation
2011-10-06 DEVIATED
2015-06-17 Begin Plugging
2018-11-08 Finished Plugging
2018-12-13 Fully Plugged

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-08-23 2011-08-23 7,685 4,863,516

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FRW-18 BJ Services Company Friction Reducer
Distillates, petroleum, hydrotreated light 64742-47-8 10.05
Water Base Fluid Water 100.00 74.93
Scaletrol 720 BJ Services Company Scale Inhibitor Diethylene glycol 111-46-6
Ethylene glycol 107-21-1 0.04
Techni-Hib 604 BJ Services Company Oxygen Scavenger Water 7732-18-5 5.00
Ammonium bisulfite 10192-30-0 75.00 0.01
Alpha 1427 BJ Services Company Biocide
Didecyl dimethyl ammonium chloride 7173-51-5
Water 7732-18-5
Ethanol 64-17-5
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1
Glutaraldehyde 111-30-8 0.02
Sand (Proppant) BJ Services Company Propping Agent
Quartz 14808-60-7 99.90 24.89

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-08-05 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHIEF OIL & GAS LLC 82,789.00 63 0.00 0 0.00 0
2012 CHIEF OIL & GAS LLC 273,749.77 362 0.00 0 0.00 0
2013 CHIEF OIL & GAS LLC 224,305.00 343 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 113,302.00 248 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 0.32 7 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHIEF OIL & GAS LLC Fracing Fluid Waste 12,620.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHIEF OIL & GAS LLC Drilling Fluid Waste 615.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011 CHIEF OIL & GAS LLC Drill Cuttings 336.77 Tons LANDFILL 301626
2011 CHIEF OIL & GAS LLC Fracing Fluid Waste 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2012 CHIEF OIL & GAS LLC Produced Fluid 6,805.80 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHIEF OIL & GAS LLC Produced Fluid 4,286.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Produced Fluid 1,979.50 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste 389.52 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste 515.77 Bbl LANDFILL 301358
2016 CHIEF OIL & GAS LLC Fracturing Fluid Waste 40.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Produced Fluid 0.01 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CHIEF OIL & GAS LLC Spent Lubricant Waste 12.81 Bbl LANDFILL 301358

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1971802 Primary Facility 2011-05-09 Drilling/Alteration No Violations Noted UDI Rig 58 Jim Quisenberry - co. man
1973080 Primary Facility 2011-04-16 Drilling/Alteration No Violations Noted drillers log checked, hit water @ 79', 1" stream @ 83'
1976430 Primary Facility 2011-05-26 Drilling/Alteration No Violations Noted UDI Rig 58 comp. man -Jim Quisenberry, tool/pusher- Bob
1977709 Primary Facility 2011-06-03 Drilling/Alteration No Violations Noted 9 5/8" @ 2991' w/ 630 sx , 15.6ppg 70 bbls returns to surf done 5/20/2011
1979331 Primary Facility 2011-06-07 Drilling/Alteration No Violations Noted Fishing, dropped a jt. down hole
1979364 Primary Facility 2011-06-03 Routine/Complete Inspection Violation(s) Noted NERO EC&B technical review concurs with report conclusions that the impacted area was remediated to background concentrations for all parameters tested for without an MSC (strontium, chloride and calcium) and residential Statewide Health standard for barium, VOCs, and SVOCs. Act 2 release of liability cannot be granted for this incident since the report was submitted under the “alternative remediation” process, as described in the draft policy “Addressing Spills and Releases at Oil & Gas Well Site.”
1980901 Primary Facility 2011-06-16 Follow-up Inspection Outstanding Violations - No Viols Req'd
1990417 Primary Facility 2011-07-25 Routine/Complete Inspection No Violations Noted 2 vent pipes ( 5 1/2" X 8 5/8" annulus, & 8 5/8" X 13 7/8" annulus) running to frac tank.
1998221 Primary Facility 2011-08-24 Drilling/Alteration No Violations Noted Fracing, Comp. Man - Bill Burton
1999478 Primary Facility 2011-08-30 Drilling/Alteration No Violations Noted Fracing. Comp. Man - Bill Burton
2005964 Primary Facility 2011-09-27 Routine/Complete Inspection No Violations Noted
2026243 Primary Facility 2011-12-09 Complaint Inspection No Violations Noted In production, digital pressure guage = 1074 psi.
2029346 Primary Facility 2011-12-15 Complaint Inspection Pending On site w/ Eric Rooney to gather isotopic samples from annuli Chief Reps. on site are Rich Adams, Ralph Larson, and Jon Hafer. 2 annulus vents - cellar filled in w/ gravel. Will be dug up to identify annuli.
2029351 Primary Facility 2011-12-19 Follow-up Inspection Violation(s) Noted On site w/ Kewvin Costello. Met Chief Reps. Rich Adams, Jon Hafer. Cellar has been dug up to confirm which annuli the vents go to.
2029352 Primary Facility 2011-12-22 Follow-up Inspection Outstanding Violations - No Viols Req'd Met Ralph Larsen and Jon Hafer, Chief representatives. On site to take flow readings w/ oriface meter. Used the 1/4" plate. There are 2 vents on this well. Did not check the 9 5/8 X 5 1/2" annulus. The other vent goes to the 20 X 13 3/8 " and 13 3/8 X 9 5/8" both. Meter reading was 0" of water which = 0 cf/day gas. Also tried the 1/8" plate and got 0" of water, but could feel very small flow.
2042690 Primary Facility 2011-06-29 Administrative/File Review No Violations Noted Response to NOV and sampling data received.
2051393 Primary Facility 2012-03-15 Routine/Complete Inspection Outstanding Violations - No Viols Req'd 1200 psi on prod.
2062417 Primary Facility 2012-04-12 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing well,1155 psi.
2062428 Primary Facility 2012-03-27 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing. Cellar dug out, no water and 2 vents.
2064978 Primary Facility 2012-04-27 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Prod - 1129 psi
2067539 Primary Facility 2012-05-14 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Cellar partially dug out - no water. 2 annular vents - open.
2077000 Primary Facility 2012-06-18 Follow-up Inspection Outstanding Violations - No Viols Req'd Concrete barriers have been placed around well heads.
2086701 Primary Facility 2012-07-24 Follow-up Inspection Outstanding Violations - No Viols Req'd No change since last insp. about 3" water in cellar, no bubbles. 1150 psi on prod. 2 annular vents. Both open, vented.
2087764 Primary Facility 2012-07-30 Follow-up Inspection Outstanding Violations - No Viols Req'd This is a prod. well/ Has 2 annular vents, open. Clean water in cellar, no bubbles.
2097239 Primary Facility 2012-08-30 Follow-up Inspection Outstanding Violations - No Viols Req'd On site w/ Kevin Costello(DEP), Ralph Larson, (Chief) & Jon Hafer(Chief consult.) to witness flow tests and pressures on annuli. Shut in both annuli for 20 min. - 13 3/8 x 9 5/8" = 10 psi (Note: This vent may also contain the 20 x 13 3/8" annulus), and 9 5/8 x 5 1/2" has = 0 psi. Connected the orifice meter to the 13 3/8 x 9 5/8" annulus - readinf of 0 to 0.01 inches of water with 1/8" orifice plate which is equivalent to 5 cuft/day( barely detectable).
2103131 Primary Facility 2012-09-14 Follow-up Inspection Outstanding Violations - No Viols Req'd Producing well. Very little water in cellar. Cellar is dug out. 2 annular vents go to tank, both open and no pressure guages. 1150 psi on prod. Workers on site putting in larger pipeline and line to W. Polovitch.
2155758 Primary Facility 2013-04-08 Follow-up Inspection Outstanding Violations - No Viols Req'd Water in cellar. There are 2 annular vents on this well. Both are shut, in prep. for N/T logging on the 1 H. There is bubbling in the cellar. Bubbles appear to be coming from a connection on the vent of the 9 5/8 x 13 3/8" annulus. No presure guages are present on annular vents.
2175542 Primary Facility 2013-06-11 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing well - 788 psi. 2 annular vents are open.
2199493 Primary Facility 2013-08-14 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing well.
2213510 Primary Facility 2013-10-01 Follow-up Inspection Outstanding Violations - No Viols Req'd On site w/ Eric Rooney, DEP and Jon Hafer, Chief to collect isotopic samples from various annuli. Annuli were shut in yesterday at 4:30 PM so 17+ hours.
2240212 Primary Facility 2014-01-24 Routine/Complete Inspection Outstanding Violations - No Viols Req'd No activity on site.
2321184 Primary Facility 2014-11-04 Follow-up Inspection Violation(s) Noted
2670027 Primary Facility 2017-12-11 Routine/Complete Inspection No Violations Noted There was no activity occurring at the site at the time of the inspection. I was accompanied by Jon Sassi (EPS) and consulted with Ken Kennedy (OGI). No violations were noted pertaining to this well. If you have any questions, please contact me.
2703210 Primary Facility 2018-02-22 Compliance Evaluation In Compliance with Schedule Arrived onsite at 15:15. Onsite to check on progress of re plumbing of all (4) wells annular vents to surface in preparation for long term venting phase as discussed and agreed to in the Depts. meeting with Chief O&G of 2/14/18. All (4) wells, the Polovitch 1H, 1V, 4H and 5H, have had their (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) annular vents plumbed to surface via 2" vents. Vents had been fitted with ball valves and Tees w/ needle valves to access vents for sampling and eventual PBUTs. The Dept. will be meeting Chief O&G Rep., Jon Hafer back at pad tomorrow morning at 09:30 to obtain gas samples off all annuli, where gas is present, for Isotopic analysis. Chief O&G has had all annular spaces and vents purged of fluid and were shut in earlier today in preparation for tomorrows sampling event. (See attached, "As Plugged" Well Bore Schematics for individual wells for plugging details as of 2/14/18).

All previous, deteriorated pad liner and debris have been removed from location. Location was fo

2703221 Primary Facility 2018-02-23 Compliance Evaluation In Compliance with Schedule Arrived onsite at 09:00. Upon arrival met up with Chief O&G Rep., Jonathan Hafer and D.E.P. Geologist, Eric Rooney. Onsite to initiate the 1st long term, approx. 90 day, venting period as agreed to in meeting of 2/14/18 with Chief O&G. All (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) were re-plumbed to surface and shut-in yesterday in preparation for todays sampling. Mr. Hafer explained that he would be taking gas samples off all the wells annular vents to send off for analysis. Following Mr. Hafers collection of annuli samples, I performed gas screenings at all (4) wells annuli using a ALTAIR 5X gas meter calibrated on 2/5/18. Gas was detected at the following wells annuli:

1H: (13 x 9) = 100% LEL, 100% CH4, 4H: (13 x 9) = 100 % LEL, 30 % CH4, 5H: (13 x 9) = 100 % LEL, 8 % CH4, Following sample collection and gas screenings, all (4) wells annuli were opened to vent to atmosphere. This long term venting period will extend for ~ 90 days. Operator will then be performing

2775961 Primary Facility 2018-08-31 Compliance Evaluation In Compliance with Schedule Arrived onsite at 11:00. Upon arrival met with Chief O&G Rep., Jonathan Hafer to conclude the 7 day PBUTs being performed on all (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB). This is the 2nd PBUT being performed after (2) full 90 day, long term venting periods. Pre-shut in test gas screenings were performed at all wells annular vents on 8/24/18 by Mr. Hafer using a Rae Systems Multi-Rae gas meter, calibrated that morning. The only annuli where gas was detected are listed below:

1H: (13x9) = 3.1% CH4, 51% LEL 1V: (9/WB) = 1.6% CH4, 36% LEL 4H: (13x9) = 1.9% CH4, 70% LEL 5H: (13x9) = 6.6% CH4, 100% LEL

Today, the ending 7 day PBUT results were: 1H: (20x13)= 0.40 psi, (13x9)= 12.95 psi, (9/WB)= 0.44 psi. 1V: (20x13)= -0.10 psi, (13x9)= -2.0 psi, (9/WB)= 0.45 psi. 4H: (20x13)= 0.10 psi, (13x9)= 11.10 psi, (9/WB)= 0.70 psi. 5H: (20x13)= 0.65 psi, (13x9)= 5.2 psi, (9/WB)= 0.75psi. - Mr. Hafer explained that he would be collecting samples off all the wells annular vents to sen

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1979364 613129 06/03/2011 2011-06-03 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Environmental Health & Safety Referred to ECP
1979364 613130 06/03/2011 2011-06-03 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. Administrative
1979364 614844 06/03/2011 2011-06-03 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative SWMA 6018.301, 210 - 252 gallons drilling mud spilled on ground surface, connection on a Kelly Hose failed.
2029351 627798 12/19/2011 2011-12-19 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative GMI COA executed 10/23/2017.
2321184 710148 11/04/2014 2014-11-04 78.73A - Operator shall prevent gas and other fluids from lower formations from entering fresh groundwater. Environmental Health & Safety Actually 78.73(b)
2321184 710149 11/04/2014 2014-11-04 78.81D1 - Failure to maintain control of anticipated gas storage reservoir pressures while drilling through reservoir or protective area Administrative Actually 78.81(a)(2)+(3)
2321184 710150 11/04/2014 2014-11-04 78.85 - Inadequate, insufficient, and/or improperly installed cement Environmental Health & Safety Actually 78.85(a)(5)
2321184 710151 11/04/2014 2014-11-04 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative
2321184 799776 11/04/2014 2014-11-04 CSL 401 - PROHIBITION AGAINST OTHER POLLUTIONS - Discharged substance of any kind or character resulting in pollution of Waters of the Commonwealth. Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
613129 272349 NOV - Notice of Violation Comply/Closed 2013-11-21
613130 272349 NOV - Notice of Violation Comply/Closed 2013-11-21
614844 272349 NOV - Notice of Violation Comply/Closed 2013-11-21
627798 279011 NOV - Notice of Violation
710148 317500 NOV - Notice of Violation
710148 358810 COA - Consent Order and Agreement 2017-10-23 $178,622.00 $178,622.00
710149 317500 NOV - Notice of Violation
710149 358810 COA - Consent Order and Agreement 2017-10-23 $178,622.00 $178,622.00
710150 317500 NOV - Notice of Violation
710151 317500 NOV - Notice of Violation
710151 358810 COA - Consent Order and Agreement 2017-10-23 $178,622.00 $178,622.00
799776 317500 NOV - Notice of Violation Administrative Close Out 2017-10-23
799776 358810 COA - Consent Order and Agreement 2017-10-23 $178,622.00 $178,622.00

For data sources see[9]

References