If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28762 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.452078,"lon":-79.420517,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Loyalhanna Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148228 | |
Farm/Lease Name: DEVINNEY UNIT 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-02-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.452078 | |
Longitude: -79.420517 |
Date | Event |
---|---|
2012-02-10 | New Permit Application |
2012-03-20 | Performed Spud Operation |
2012-05-16 | Drilling Completion |
2012-09-18 | Perforation |
2013-06-04 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-10-26 | 2012-10-26 | 7,820 | 4,935,084 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00018000 | |
Other -(non hazardous) | 50.00 | 0.00018000 | ||||||
100.00 | ||||||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.65 | |||
Biocide - MC 8650 | Multi-Chem Group | Biocide | Glutaraldehyde | 111-30-8 | 60.00 | 0.00400000 | ||
Other -(non hazardous) | 40.00 | 0.00260000 | ||||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | Other -(non hazardous) | 100.00 | 0.01 | |||
Acid - 7.5 HCl Acid | PPG Industries | Acid | Hydrochloric acid | 7647-01-0 | 7.50 | 0.03 | ||
Other -(non hazardous) | 92.50 | 0.42 | ||||||
Biocide - MC 8520 | Multi-Chem Group | Biocide | 4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | ||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00007000 | |||||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00062000 | |||||
Clay Stabilizer - ClaChek G | Shrieve | Clay Stabilizer | Not hazardous | 70.00 | 0.00170000 | |||
Water | 7732-18-5 | 30.00 | 0.00070000 | |||||
Water | Water | 7732-18-5 | 100.00 | 86.79 | ||||
Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | |||||
Other -(non hazardous) | 70.00 | 0.03 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 669,079.00 | 270 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 637,530.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 415,492.00 | 320 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 313,009.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 280,017.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 268,749.26 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 233,745.60 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Produced Fluid | 98.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 115.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2013 | XTO ENERGY INC | Produced Fluid | 6,656.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 6,656.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 1,214.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 5,443.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 1,176.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 180.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | XTO ENERGY INC | Produced Fluid | 1,214.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 230.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2015 | XTO ENERGY INC | Produced Fluid | 2,608.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 503.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 584.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 11.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 1,059.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 450.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 1,091.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 203.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 1,778.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 620.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 787.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2055470 | Primary Facility | 2012-03-29 | Routine/Complete Inspection | No Violations Noted | Met onsite with Operator Dan Rice to discuss a sediment trap located on the opposite side of the well pad entrance. The Department suggests the Operator add rock to an outflow area of the sediment trap to ensure accelerated erosion and sediment transport is minimized. The Operator representative agreed with the Department and work will be done in the near future. |
2056032 | Primary Facility | 2012-03-30 | Routine/Complete Inspection | No Violations Noted | Well topholed; location being prepped for horizontal rig; E&S good; On pad with 129-28697; In process of moving in rig within the day; |
2066491 | Primary Facility | 2012-05-03 | Drilling/Alteration | No Violations Noted | NOMAC Rig#310 drilling on air at 1902’ at time of inspection. Closed loop system being utilized. |
2076879 | Primary Facility | 2012-06-15 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was in the process of removing the drill rig located onsite. The site appeared to be in sound condition with no sign of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggest the Operator continue to monitor the sight weekly and after significant precipitation event to ensure the stability of the well pad and access road are retained. |
2109558 | Primary Facility | 2012-10-19 | Incident- Response to Accident or Event | No Violations Noted | Inspection in response to a spill reported by the Operator on 10/18/2012. The Operator reported a 20 gallon hydraulic oil spilled to the ground from a delivery truck. At the time of inspection the Operator had excavated a small 4 foot by 4 foot section area and placed the contaminated soil on containment. Waste Management was onsite taking samples. The Department suggested that the Operator take a sample of the soil to verify what was spilled and the excavated portion of the pad to ensure that the site had been cleaned. The Department suggests the Operator forward the sample results for verification of cleanup. |
2129629 | Primary Facility | 2013-01-10 | Routine/Complete Inspection | No Violations Noted | Inspection as a result of a restoration extension request from the Operator. At the time of inspection the well appears to drilled and equipped for production. The well apparatus, brine tank, and heater appear to be in sound condition. The well pad and access road appear to be in sound condition, no accelerated erosion or sedimentation observed. As described by the Operator the site is vegetated and appears to be stable. The pits located on site appear to be in sound condition with the required 2' of free board. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site remains stable. |
2245017 | Primary Facility | 2014-02-13 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to drilled and equipped for production. The well apparatus, brine tank, and heater appear to be in sound condition. The pits located on site appear to be in sound condition with the required 2' of free board. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site remains stable. |
2287661 | Primary Facility | 2014-06-27 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2304336 | Primary Facility | 2014-09-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to drilled and equipped for production. The well apparatus, brine tank, and heater appear to be in sound condition. The pits located have been removed, backfilled, seeded, mulched and appear to have good growth. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site remains stable. |
2343681 | Primary Facility | 2015-02-09 | Routine/Complete Inspection | No Violations Noted | See inspection # 2343680 for observations made on 2/9/2015. |
2366770 | Primary Facility | 2015-04-27 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2395118 | Primary Facility | 2015-08-03 | Site Restoration | No Violations Noted | Inspection in response to the Operators submission of a "Well Site Restoration Report" on 1/15/2015. At the time of inspection earth disturbance activities at the site authorized by the Well Permit are complete, the site has been stabilized and the Post Construction Stormwater Management BMP's have been installed. |
2439577 | Primary Facility | 2016-01-07 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production unit-tank battery-dike-equipment all ok. |
2494398 | Primary Facility | 2016-06-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2576217 | Primary Facility | 2017-03-27 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment look ok. |
2834871 | Primary Facility | 2019-02-04 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dikes and tank battery looks ok. |
For data sources see[8]