37-129-28723

Well Details

Well ID: 37-129-28723
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Bell Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 145326
Farm/Lease Name: KUHNS 3E
License Status:
Spud Date:
Permit Date: 2012-02-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.507967
Longitude: -79.546011

For data sources see[1][2][3]

Well History

Date Event
2012-02-02 New Permit Application
2012-04-13 Performed Spud Operation
2012-08-24 Drilling Completion
2013-03-23 Drilling Completion
2013-04-27 Perforation
2014-05-12 DEVIATED
2014-08-22 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-06-05 2013-06-15 7,452 6,428,730 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water, Customer & CWS Base Fluid & Mix Water, Water 7732-18-5 100 87.9249 53,645,500.0
and (Proppant), DAP-903, DWP-111,
DWP-614, DWP-901, BioClear
2000, DWP-NE1, Spearhead Acid, Acetic A
CWS Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Breaker, Biocide, Non-Emulsifier, Clean Perforations, Acid, Poly(oxyethylene)nonylphenol ether 9016-45-9 5 0.0036 2170.42
Polyethylene Glycol Mixture 25322-68-3 70 0.0053 3244.39
Dimethylcocoamine, bis(chloroethyl)
ether, diquaternary ammonium salt
68607-28-3 40 0.007 4293.43
Alcohols, C14-15, ethoxylated 68951-67-7 0.1 0.0007 425.08
Diallyldimethylammonium chloride 7398-69-8 5 0.0009 536.68
Calcite 471-34-1 1 0.022 13403.5
Modified thiourea polymer 68527-49-1 0.1 0.0007 425.08
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether 37251-67-5 1.5 0.0004 224.68
Illite 12173-60-3 1 0.0035 2144.99
Methanol 67-56-1 15 0.004 2460.19
Propargyl Alcohol 107-19-7 0.1 0.0002 141.69
Guar gum 9000-30-0 60 0.0147 8987.26
Ammonium Persulfate 7727-54-0 100 0.0017 1042.5
Crystalline silica (Quartz) 14808-60-7 100 11.7263 7,154,550.0
Apatite 64476-38-6 0.1 0.0023 1432.7
2-Propenoic acid, polymer with sodium phosphonate 71050-62-9 60 0.0067 4086.93
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 40 0.0285 17363.4
Goethite 1310-14-1 0.1 0.0044 2709.23
Ilmenite 98072-94-7 0.1 0.0013 794.44
Distillates (petroleum), hydrotreated middle 64742-46-7 60 0.0361 22009.8
Fatty acids, tall-oil 61790-12-3 0.1 0.0007 425.08
Quaternary ammonium compounds,
bis(hydrogenated tallow alkyl)dimethyl,
salts with bentonite
68953-58-2 5 0.0012 748.94
Formaldehyde 50-00-0 0.1 0 28.34
Biotite 1302-27-8 0.1 0.0023 1432.7
Hydrochloric acid 7647-01-0 35 0.1626 99184.6
Sodium chloride 7647-14-5 0.1 0 14.17
Isopropanol 67-63-0 40 0.007 4293.43
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 40 0.0053 3244.39
Acetic acid 64-19-7 100 0.0212 12925.3
Alkenes, C>10 a- 64743-02-8 0.1 0.0007 425.08

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2012 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2013 CNX GAS CO LLC 737,792.43 186 0.00 0 0.00 0
2014 CNX GAS CO LLC 773,295.69 365 0.00 0 0.00 0
2015 CNX GAS CO LLC 536,579.14 365 0.00 0 0.00 0
2016 CNX GAS CO LLC 415,602.32 366 0.00 0 0.00 0
2017 CNX GAS CO LLC 339,245.62 365 0.00 0 0.00 0
2018 CNX GAS CO LLC 299,861.14 365 0.00 0 0.00 0
2019 CNX GAS CO LLC 250,275.42 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CNX GAS CO LLC Drilling Fluid Waste 3,850.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CNX GAS CO LLC Drill Cuttings 804.10 Tons LANDFILL 100434
2012 CNX GAS CO LLC Drill Cuttings 190.85 Tons LANDFILL 100280
2013 CNX GAS CO LLC Produced Fluid 9,857.07 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CNX GAS CO LLC Produced Fluid 312.09 Bbl INJECTION DISPOSAL WELL 34-155-23732
2013 CNX GAS CO LLC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-155-23203
2013 CNX GAS CO LLC Drill Cuttings 243.89 Tons LANDFILL 100434
2013 CNX GAS CO LLC Drilling Fluid Waste 32.53 Bbl LANDFILL 100280
2013 CNX GAS CO LLC Drilling Fluid Waste 10.67 Bbl INJECTION DISPOSAL WELL 34-013-20609
2013 CNX GAS CO LLC Produced Fluid 682.08 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 CNX GAS CO LLC Produced Fluid 1,284.07 Bbl INJECTION DISPOSAL WELL 34-119-28776
2013 CNX GAS CO LLC Fracing Fluid Waste 110.28 Bbl RESIDUAL WASTE TRANSFER FACILITY 101674
2013 CNX GAS CO LLC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013 CNX GAS CO LLC Produced Fluid 264.27 Bbl INJECTION DISPOSAL WELL 34-013-20609
2013 CNX GAS CO LLC Drill Cuttings 304.79 Tons LANDFILL 301071
2013 CNX GAS CO LLC Fracing Fluid Waste 9,827.38 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CNX GAS CO LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2013 CNX GAS CO LLC Produced Fluid 104.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2013 CNX GAS CO LLC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-155-21894
2013 CNX GAS CO LLC Produced Fluid 475.95 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 CNX GAS CO LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2014 CNX GAS CO LLC Produced Fluid 120.51 Bbl INJECTION DISPOSAL WELL 34-155-23196
2014 CNX GAS CO LLC Produced Fluid 7,222.45 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CNX GAS CO LLC Produced Fluid 121.68 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 CNX GAS CO LLC Produced Fluid 1,001.52 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014 CNX GAS CO LLC Produced Fluid 232.83 Bbl INJECTION DISPOSAL WELL 34-155-23732
2015 CNX GAS CO LLC Produced Fluid 504.05 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015 CNX GAS CO LLC Produced Fluid 603.74 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 CNX GAS CO LLC Produced Fluid 4,760.24 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 3,557.73 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 329.17 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017 CNX GAS CO LLC Produced Fluid 218.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2017 CNX GAS CO LLC Produced Fluid 580.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017 CNX GAS CO LLC Produced Fluid 117.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2017 CNX GAS CO LLC Produced Fluid 119.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017 CNX GAS CO LLC Produced Fluid 222.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-16
2017 CNX GAS CO LLC Produced Fluid 310.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017 CNX GAS CO LLC Produced Fluid 1,063.28 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC Produced Fluid 222.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2018 CNX GAS CO LLC Other Oil & Gas Wastes 1.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018 CNX GAS CO LLC Produced Fluid 262.85 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Produced Fluid 258.43 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 CNX GAS CO LLC Other Oil & Gas Wastes 22.80 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Other Oil & Gas Wastes 2.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Other Oil & Gas Wastes 24.00 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid 47.26 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 1,387.14 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 421.78 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 303.93 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 100.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 785.21 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 91.17 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 138.26 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 191.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 332.40 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2059496 Primary Facility 2012-04-16 Routine/Complete Inspection No Violations Noted Inspection in response to a SPUD notice received of Thursday April 12 2012. At the time of inspection the site was being constructed. The E&S plan was on site and was properly implemented. The site was temporary stabilized as outlined in the E&S Plan. The Department notes an unlined pit onsite at the time of inspection. No accelerated erosion observed in relation to the access road or well pad area at the time of the inspection.
2068977 Primary Facility 2012-05-14 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling.
2080112 Primary Facility 2012-06-21 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Inspection conducted w/OGI D. Catalano.
2086654 Primary Facility 2012-07-23 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI Supervisor D. Stivanson.
2086662 Primary Facility 2012-07-26 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained.
2086923 Primary Facility 2012-07-23 Routine/Complete Inspection No Violations Noted At the time of inspection the well had not been drilled. The site appeared to be in sound condition. No accelerated or sedimentation observed in relation to the well pad or access road. The site has been temporarily stabilized and all BMP's appear to be properly installed and maintained. THE Department suggest the Operator continue to monitor the site on a weekly basis and after precipitation event to ensure E&S in not leaving the site.
2092777 Primary Facility 2012-08-06 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained.
2092860 Primary Facility 2012-08-20 Routine/Complete Inspection No Violations Noted At the time of inspection the well was actively being drilled. The well pad appeared to be in sound condition. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2097839 Primary Facility 2012-09-05 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained.
2127553 Primary Facility 2013-01-03 Routine/Complete Inspection No Violations Noted At the time of inspection the well was actively being drilled. The well pad appeared to be in sound condition. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2134672 Primary Facility 2013-01-25 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI D. Catalano.
2138180 Primary Facility 2013-02-11 Routine/Complete Inspection No Violations Noted no violations noted
2145977 Primary Facility 2013-02-28 Drilling/Alteration No Violations Noted Waiting on frac. Pit lined and freeboard maintained.
2147746 Primary Facility 2013-03-12 Routine/Complete Inspection No Violations Noted no violations
2147821 Primary Facility 2013-03-12 Drilling/Alteration No Violations Noted Waiting on frac. Pit lined and freeboard maintained.
2151217 Primary Facility 2013-03-26 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator indicated the well was drilled to total depth. The well pad appeared to be in sound condition with secondary containment underneath the drill rig. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2160374 Primary Facility 2013-04-22 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled however not stimulated or equipped for production. During the inspection the Department notes that the Operator has started to prepare the site for stimulation. The Operator was in the process of excavating an area adjacent to the pad to store the Rock Water above ground storage container. The erosions and sedimentation plan was onsite and all associated BMPs appear to installed and functioning as outline in the plan. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2166675 Primary Facility 2013-05-15 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and the Operator was in the final stages of the stimulation set up process. Stimulation notice received by the Department on 5/11/2013 set for 5/16/2013. The Department notes that a 1 million gallon above ground freshwater containment vessel was installed and being filled at the time of inspection. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2171431 Primary Facility 2013-06-03 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and the Operator was in the process of stimulation. No observation of accelerated erosion or sedimentation in relation the well pad or access road. The E&S plan was onsite and all associated BMPs appear to be installed and properly maintained. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained. Refer to inspection # 2171660 for violations issued on 6/3/2013 for release during completions operations.
2185903 Primary Facility 2013-07-24 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and stimulated and the Operator was in the process of equipping the well for production. The Department notes that the Operator has installed the previously approved Rock Water flow back tank. The Department notes that the flow back tank appears to be in sound condition and is placed within containment. No observation of accelerated erosion or sedimentation in relation the well pad or access road. The E&S plan was onsite and all associated BMPs appear to be installed and properly maintained. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2199852 Primary Facility 2013-08-29 Routine/Complete Inspection No Violations Noted See inspection #2199829 for observations of made during the 8.29.2013 inspection well pad.
2240337 Primary Facility 2014-01-28 Routine/Complete Inspection No Violations Noted At the time of inspection the well appear to be drilled and in production. The well apparatus and brine tanks appear to be in sound condition. The site is covered with snow no E&S inspection could be conducted during the inspection.
2281845 Primary Facility 2014-06-24 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2358472 Primary Facility 2015-04-07 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2476214 Primary Facility 2016-04-19 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production unit equipment-tank battery-dike look ok.
2521551 Primary Facility 2016-09-21 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road.
2576107 Primary Facility 2017-03-27 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2622364 Primary Facility 2017-08-04 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues.
2738505 Primary Facility 2018-06-07 Routine/Complete Inspection No Violations Noted 6-7-18 Well producing.
2843847 Primary Facility 2019-02-25 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.