If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-129-28695 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.336331,"lon":-79.155311,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Westmoreland | |
| Municipality: Fairfield Township | |
| Operator Name: XTO ENERGY INC | |
| Well Pad ID: 149194 | |
| Farm/Lease Name: RITENOUR 2H | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2011-10-25 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 40.336331 | |
| Longitude: -79.155311 |
| Date | Event |
|---|---|
| 2011-10-25 | New Permit Application |
| 2011-11-12 | Performed Spud Operation |
| 2012-04-21 | Drilling Completion |
| 2012-06-14 | Perforation |
| 2013-08-23 | DEVIATED |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2012-06-14 | 2012-06-14 | 8,273 | 3,958,142 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Acid - 15 HCl Acid | PPG Industries | Acid | |||||
| Other -(non hazardous) | 85.00 | 1.09 | ||||||
| Hydrochloric acid | 7647-01-0 | 15.00 | 0.19 | |||||
| Clay Stabilizer - ClaChek G | Shrieve | Clay Stabilizer | Water | 7732-18-5 | 30.00 | 0.01 | ||
| Not hazardous | 70.00 | 0.03 | ||||||
| Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | Other -(non hazardous) | 50.00 | 0.00103000 | |||
| Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00103000 | |||||
| 100.00 | ||||||||
| Water | Water | 7732-18-5 | 100.00 | 87.39 | ||||
| Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 10.87 | |||
| Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | ||||||
| Other -(non hazardous) | 100.00 | 0.01 | ||||||
| Biocide - MC 8650 | Multi-Chem Group | Biocide | ||||||
| Glutaraldehyde | 111-30-8 | 60.00 | 0.00310000 | |||||
| Other -(non hazardous) | 40.00 | 0.00210000 | ||||||
| Biocide - MC 8520 | Multi-Chem Group | Biocide | 3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00053000 | ||
| 4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | |||||
| 2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00006000 | |||||
| Acid - 7.5 HCl Acid | PPG Industries | Acid | ||||||
| Hydrochloric acid | 7647-01-0 | 7.50 | 0.02 | |||||
| Other -(non hazardous) | 92.50 | 0.25 | ||||||
| Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | ||||||
| Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |||||
| Other -(non hazardous) | 70.00 | 0.06 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2012 | XTO ENERGY INC | 297,192.00 | 171 | 0.00 | 0 | 0.00 | 0 |
| 2013 | XTO ENERGY INC | 353,965.00 | 356 | 0.00 | 0 | 0.00 | 0 |
| 2014 | XTO ENERGY INC | 213,910.00 | 331 | 0.00 | 0 | 0.00 | 0 |
| 2015 | XTO ENERGY INC | 188,767.00 | 355 | 0.00 | 0 | 0.00 | 0 |
| 2016 | XTO ENERGY INC | 128,314.00 | 276 | 0.00 | 0 | 0.00 | 0 |
| 2017 | XTO ENERGY INC | 125,008.00 | 298 | 0.00 | 0 | 0.00 | 0 |
| 2018 | XTO ENERGY INC | 110,415.47 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2019 | XTO ENERGY INC | 100,432.64 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2012 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
| 2012 | XTO ENERGY INC | Produced Fluid | 99.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2012 | XTO ENERGY INC | Drill Cuttings | 42.22 Tons | LANDFILL | 100419 |
| 2012 | XTO ENERGY INC | Fracing Fluid Waste | 4,045.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2012 | XTO ENERGY INC | Produced Fluid | 109.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
| 2012 | XTO ENERGY INC | Produced Fluid | 195.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
| 2012 | XTO ENERGY INC | Produced Fluid | 4,914.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2012 | XTO ENERGY INC | Drill Cuttings | 190.82 Tons | LANDFILL | 101397 |
| 2012 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
| 2013 | XTO ENERGY INC | Produced Fluid | 89.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
| 2013 | XTO ENERGY INC | Produced Fluid | 95.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
| 2013 | XTO ENERGY INC | Produced Fluid | 1,420.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2013 | XTO ENERGY INC | Produced Fluid | 213.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
| 2013 | XTO ENERGY INC | Produced Fluid | 1,521.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
| 2013 | XTO ENERGY INC | Produced Fluid | 1,521.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
| 2014 | XTO ENERGY INC | Produced Fluid | 283.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
| 2014 | XTO ENERGY INC | Produced Fluid | 1,363.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
| 2014 | XTO ENERGY INC | Produced Fluid | 518.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
| 2014 | XTO ENERGY INC | Produced Fluid | 518.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
| 2015 | XTO ENERGY INC | Produced Fluid | 302.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
| 2015 | XTO ENERGY INC | Produced Fluid | 1,766.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
| 2016 | XTO ENERGY INC | Produced Fluid | 420.71 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
| 2016 | XTO ENERGY INC | Produced Fluid | 741.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
| 2017 | XTO ENERGY INC | Produced Fluid | 140.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2017 | XTO ENERGY INC | Waste Water Treatment Sludge | 3.60 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2014-04 |
| 2017 | XTO ENERGY INC | Produced Fluid | 736.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
| 2018 | XTO ENERGY INC | Produced Fluid | 84.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018 | XTO ENERGY INC | Produced Fluid | 376.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
| 2019 | XTO ENERGY INC | Produced Fluid | 436.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
| 2019 | XTO ENERGY INC | Produced Fluid | 550.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2020739 | Primary Facility | 2011-11-17 | Drilling/Alteration | No Violations Noted | Well drilled to 418' TD; Ran 398' 13 3/8"; Cmt to surface; Rig moving off location |
| 2020798 | Primary Facility | 2011-11-08 | Drilling/Alteration | No Violations Noted | PC RIG 1 DRILLING ON THE RITENOUR PAD FOR XTO. |
| 2024229 | Primary Facility | 2011-12-02 | Routine/Complete Inspection | No Violations Noted | Visit to site was part of routine inspection. |
| 2033471 | Primary Facility | 2011-01-05 | Drilling/Alteration | No Violations Noted | WAITING ON RIG TO DRILL DEEPER |
| 2037050 | Primary Facility | 2012-01-24 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
| 2049119 | Primary Facility | 2012-03-01 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
| 2052170 | Primary Facility | 2012-03-12 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
| 2061721 | Primary Facility | 2012-04-10 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
| 2066087 | Primary Facility | 2012-04-26 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
| 2070094 | Primary Facility | 2012-05-23 | Drilling/Alteration | No Violations Noted | 5/23/2012 well waiting for frac. |
| 2121193 | Primary Facility | 2012-12-06 | Routine/Complete Inspection | No Violations Noted | Containment area around tank battery and sep/heater in good shape; e&s good; access road in good shape; |
| 2164491 | Primary Facility | 2013-05-08 | Routine/Complete Inspection | No Violations Noted | Routine inspections no issues noted. |
| 2487725 | Primary Facility | 2016-05-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
| 2503339 | Primary Facility | 2016-07-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
| 2680949 | Primary Facility | 2018-01-10 | Routine/Partial Inspection | No Violations Noted | Routine partial inspection due to snow cover. Multi well Marsellus site. Well appears to be in production. Well head surrounded by cement barriers and security fence. |
For data sources see[8]