X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28671

Well Details

Well ID: 37-129-28671
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Derry Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 145142
Farm/Lease Name: DURALIA 1-4H
License Status:
Spud Date:
Permit Date: 2011-09-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.376622
Longitude: -79.280408

For data sources see[1][2][3]

Well History

Date Event
2011-09-12 New Permit Application
2011-09-27 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-24 2013-08-27 8,353 3,850,360 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 87.3967 32,073,400.0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Methanol 67-56-1 60 0.000363447 134
Propargyl alcohol 107-19-7 10 0.00006057 23
WG-36 GELLING AGENT Halliburton Gelling Agent Guar gum 9000-30-0 100 0.00147145 540
SP BREAKER Halliburton Breaker Sodium persulfate 7775-27-1 100 0.00003815 14
HYDROCHLORIC ACID 5-10% Halliburton Solvent Hydrochloric acid 7647-01-0 10 0.0662257 24304
FR-66 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 30 0.0298403 10951
100 MESH Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 2.29763 843200
HYDROCHLORIC ACID 10-30% Halliburton Solvent Hydrochloric acid 7647-01-0 30 0.0146327 5370
40/70 Sand Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 9.40534 3,451,630.0
BE-9 Halliburton Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00421061 1546
LP-65 Halliburton Scale Inhibitor Ammonium chloride 12125-02-9 10 0.00455821 1673
Other Ingredient(s) Water 7732-18-5 0 0.840169 308331
Alcohols, C14-C15, ethoxylated 68951-67-7 0 0.000181723 67
Alcohols, C12-16, ethoxylated 68551-12-2 0 0.00497338 1826
Organic phosphonate Confidential 0 0.0273493 10037
Reaction product of acetophenone,
formaldehyde, thiourea
and oleic acid in dimethyl formamide
68527-49-1 0 0.000181723 67
Ammonium chloride 12125-02-9 0 0.00497338 1826
Formaldehyde 50-00-0 0 0.000455821 168
Crystalline Silica, Quartz 14808-60-7 0 0.00000147 1
Fatty acid tall oil amide Confidential 0 0.00497338 1826
Silica gel 112926-00-8 0 0.00001471 6
Sodium sulfate 7757-82-6 0 0.00000004 1
Fatty acids, tall oil Confidential 0 0.000181723 67
Sodium chloride 7647-14-5 0 0.00497338 1826
Sorbitan, mono-9-octadecenoate, (Z) 1338-43-8 0 0.000994676 366
Bentonite, benzyl(hydrogenated
tallow alkyl) dimethylammonium stearate complex
121888-68-4 0 0.00007357 27
Olefins Confidential 0 0.00003029 12
Olefins Confidential 0 0.00000606 3
Surfactant mixture Confidential 0 0.00001471 6
Polyacrylamide copolymer Confidential 0 0.0298403 10951
Sorbitan monooleate polyoxyethylene derivative 9005-65-6 0 0.000994676 366

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2013 XPR RESOURCES LLC 244,627.78 92 0.00 0 0.00 0
2014 XPR RESOURCES LLC 565,216.08 365 0.00 0 0.00 0
2015 XPR RESOURCES LLC 298,095.02 365 0.00 0 0.00 0
2016 XPR RESOURCES LLC 208,788.07 366 0.00 0 0.00 0
2017 XPR RESOURCES LLC 150,326.25 365 0.00 0 0.00 0
2018 XPR RESOURCES LLC 138,488.00 365 0.00 0 0.00 0
2019 XPR RESOURCES LLC 115,608.00 363 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 XPR RESOURCES LLC Fracing Fluid Waste 130.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 XPR RESOURCES LLC Drilling Fluid Waste 450.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XPR RESOURCES LLC Fracing Fluid Waste 5,548.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2013 XPR RESOURCES LLC Produced Fluid 6,537.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XPR RESOURCES LLC Produced Fluid 3,970.71 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XPR RESOURCES LLC Produced Fluid 1,128.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 660.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 755.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 XPR RESOURCES LLC Produced Fluid 721.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XPR RESOURCES LLC Produced Fluid 125.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2018 XPR RESOURCES LLC Produced Fluid 245.71 Bbl REUSE (AT WELL PAD)
2018 XPR RESOURCES LLC Produced Fluid 689.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XPR RESOURCES LLC Produced Fluid 381.41 Bbl REUSE (AT WELL PAD)
2019 XPR RESOURCES LLC Produced Fluid 109.29 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 XPR RESOURCES LLC Produced Fluid 15.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2013958 Primary Facility 2011-10-26 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2013989 Primary Facility 2011-10-21 Drilling/Alteration No Violations Noted H&P RIG 287 DRILLING ON WILLIAMS PAD, DEPTH OF 80'.
2019637 Primary Facility 2011-11-16 Routine/Complete Inspection No Violations Noted Fred Webb and Jimmy Ballew were the company men on site. AP was tool pusher for HP.
2026852 Primary Facility 2011-12-14 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2140624 Primary Facility 2013-02-19 Routine/Complete Inspection No Violations Noted no violations noted
2145812 Primary Facility 2013-02-28 Routine/Complete Inspection No Violations Noted Butches Rathole getting set up to spud 8H and 10H. 4 produced fluid tanks and seperators.
2149815 Primary Facility 2013-03-13 Routine/Complete Inspection No Violations Noted WGM getting ready to lay down containment.
2151667 Primary Facility 2013-03-27 Routine/Complete Inspection No Violations Noted 3/26/2013 Moving rig onto location.
2161059 Primary Facility 2013-04-24 Routine/Complete Inspection No Violations Noted At the time of inspection the Department notes that the well appears to be drilled and equipped for production. The well apparatus, brine tank and gas production unit appear to be in sound condition. The Erosion and Sedimentation Plan was onsite and appeared to be implemented as designed. No sign of accelerated erosion or sedimentation observed in relation to the well pad or access road during the inspection. The impoundment associated with the well also appears to be in sound condition and had the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2162323 Primary Facility 2013-04-16 Drilling/Alteration No Violations Noted 4/2/2013 drilling on the 1-8H.
2162324 Primary Facility 2013-04-02 Drilling/Alteration No Violations Noted 4/2/2013 drilling on the 1-8H.
2167547 Primary Facility 2013-05-07 Routine/Complete Inspection No Violations Noted 5/7/2013 Orion rig drilling on 1-10H
2171352 Primary Facility 2013-06-03 Routine/Complete Inspection No Violations Noted At the time of inspection the Department notes that the well appears to be drilled and equipped for production. The well apparatus, brine tank and gas production unit appear to be in sound condition. The Erosion and Sedimentation Plan was onsite and appeared to be implemented as designed. No sign of accelerated erosion or sedimentation observed in relation to the well pad or access road during the inspection. The impoundment associated with the well also appears to be in sound condition and had the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2173757 Primary Facility 2013-05-30 Routine/Complete Inspection No Violations Noted 5/30/2013 Orion rig diling on the 1-8H. Inspected W/OGI P. Wyrwas.
2183152 Primary Facility 2013-07-11 Routine/Complete Inspection No Violations Noted At the time of inspection the Department notes that the well appears to be drilled and equipped for production. The well apparatus, brine tank and gas production unit appear to be in sound condition. The Erosion and Sedimentation Plan was onsite and appeared to be implemented as designed. No sign of accelerated erosion or sedimentation observed in relation to the well pad or access road during the inspection. The impoundment associated with the well also appears to be in sound condition and had the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2188047 Primary Facility 2013-07-25 Routine/Complete Inspection No Violations Noted 7/25/2013 Orion rig drilling on 1-10H.
2195639 Primary Facility 2013-08-12 Routine/Complete Inspection No Violations Noted See inspection #2195630 for observations made on 8/12/2013. Well appeared to be drilled however not equipped for production. The Operator was in the process to reconfiguring the well site to begin stimulation. No observation of accelerated erosion or sedimentation in relation to the well pad or access road at the time of inspection.
2208597 Primary Facility 2013-07-30 Drilling/Alteration No Violations Noted 7/30/2013 Orion rig drilling on 1-8H.
2259039 Primary Facility 2014-03-26 Routine/Complete Inspection No Violations Noted 3/26/2014 Produced fluids ttanks diked and GPU's
2274454 Primary Facility 2014-05-19 Routine/Complete Inspection No Violations Noted 5/19/2014 Produced fluids tanks, GPUs and in line.
2302580 Primary Facility 2014-08-27 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road at the time of inspection.
2377782 Primary Facility 2015-06-09 Routine/Complete Inspection No Violations Noted 6/9/2015 Produced fluids tanks, GPUs and in line.
2401503 Primary Facility 2015-08-20 Routine/Complete Inspection No Violations Noted 8/20/2015 Produced fluids tanks, GPUs and in line.
2444384 Primary Facility 2016-01-27 Routine/Complete Inspection No Violations Noted Access road gated and locked. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, ground snow covered, no signs of E& S issues in relation to site and/or access road.
2449991 Primary Facility 2016-01-27 Routine/Complete Inspection No Violations Noted 1/27/2016 Produced fluids tanks, GPUs and in line.
2476125 Primary Facility 2016-04-18 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production unit equipment-tank battery-dike look ok.
2554685 Primary Facility 2017-01-24 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2556704 Primary Facility 2017-01-26 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road.
2621633 Primary Facility 2017-08-02 Routine/Complete Inspection No Violations Noted Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok.
2690440 Primary Facility 2018-02-01 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Four brine tanks within secondary containment and appear to be structurally sound. No E&S issues.

Site id sign updated to reflect current Operator information. POC plan and ERP appears to reflect outdated Operator information. Department request Operator update documents accordingly in accordance with regulation. Violation issued (see inspection id 2690435).

2834651 Primary Facility 2019-01-28 Site Restoration No Violations Noted Inspection conducted in response to a Post-drilling Well Site Restoration Report received by Department.

The NOT for this site was approved on 6-15-18. At time of inspection well appears equipped for production. Well head protected by cement posts (photo #2). Four brine tanks on site. Site appears vegetated and vegetation appears to have reached >70% uniform growth. Site and access road appear returned to near original contours. The Post-drilling Well Site Restoration Report is approved.

For data sources see[8]

References