X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28670

Well Details

Well ID: 37-129-28670
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Derry Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 145142
Farm/Lease Name: DURALIA 1-2H
License Status:
Spud Date:
Permit Date: 2011-09-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.376594
Longitude: -79.280450

For data sources see[1][2][3]

Well History

Date Event
2011-09-12 New Permit Application
2011-09-27 Performed Spud Operation
2011-10-30 Drilling Completion
2012-09-19 Perforation
2013-08-23 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-09-21 2012-09-21 8,382 4,239,989

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00410000
BE-9M Halliburton Energy Services Biocide Methanol 67-56-1 30.00 0.01
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00490000
Water Municipal Authority of Derry Borough Carrier/Base Fluid Water 100.00 88.66
Sand- Silica Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 11.17
SP Breaker Halliburton Energy Services Breaker Sodium persulfate 7775-27-1 100.00 0.00084000
Hydrochloric Acid Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 0.10
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
WG-36 Gelling Agent Halliburton Energy Services Gel
Guar gum 9000-30-0 100.00 0.00140000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 XPR RESOURCES LLC 192,729.66 58 0.00 0 0.00 0
2013 XPR RESOURCES LLC 627,983.62 304 0.00 0 0.00 0
2014 XPR RESOURCES LLC 392,901.03 365 0.00 0 0.00 0
2015 XPR RESOURCES LLC 261,923.09 365 0.00 0 0.00 0
2016 XPR RESOURCES LLC 191,819.61 366 0.00 0 0.00 0
2017 XPR RESOURCES LLC 162,927.12 365 0.00 0 0.00 0
2018 XPR RESOURCES LLC 122,032.00 365 0.00 0 0.00 0
2019 XPR RESOURCES LLC 83,686.00 353 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 XPR RESOURCES LLC Drill Cuttings 1,221.35 Tons LANDFILL 100277
2012 XPR RESOURCES LLC Fracing Fluid Waste 107.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XPR RESOURCES LLC Produced Fluid 2,432.36 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XPR RESOURCES LLC Produced Fluid 2,121.16 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XPR RESOURCES LLC Drilling Fluid Waste 550.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2013 XPR RESOURCES LLC Produced Fluid 39,225.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XPR RESOURCES LLC Produced Fluid 3,970.71 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 660.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 755.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 XPR RESOURCES LLC Produced Fluid 721.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XPR RESOURCES LLC Produced Fluid 2,105.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2018 XPR RESOURCES LLC Produced Fluid 245.71 Bbl REUSE (AT WELL PAD)
2018 XPR RESOURCES LLC Produced Fluid 689.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XPR RESOURCES LLC Produced Fluid 15.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XPR RESOURCES LLC Produced Fluid 435.70 Bbl REUSE (AT WELL PAD)
2019 XPR RESOURCES LLC Produced Fluid 109.29 Bbl INJECTION DISPOSAL WELL 34-155-24079

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2013953 Primary Facility 2011-10-26 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2014007 Primary Facility 2011-10-21 Drilling/Alteration No Violations Noted H&P RIG 287 DRILLING ON WILLIAMS PAD, DEPTH OF 6450'.
2019629 Primary Facility 2011-11-16 Routine/Complete Inspection No Violations Noted Fred Webb and Jimmy Ballew were the company men on site. AP was tool pusher for HP.
2026839 Primary Facility 2011-12-14 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2102304 Primary Facility 2012-09-25 Routine/Complete Inspection No Violations Noted Routine inspection. Company just frac 1-2H. No issues noted.
2140623 Primary Facility 2013-02-19 Routine/Complete Inspection No Violations Noted no violations noted
2145802 Primary Facility 2013-02-28 Routine/Complete Inspection No Violations Noted Butches Rathole getting set up to spud 8H and 10H. 4 produced fluid tanks and seperators.
2149811 Primary Facility 2013-03-13 Routine/Complete Inspection No Violations Noted WGM getting ready to lay down containment.
2151666 Primary Facility 2013-03-27 Routine/Complete Inspection No Violations Noted 3/26/2013 Moving rig onto location.
2161057 Primary Facility 2013-04-24 Routine/Complete Inspection No Violations Noted At the time of inspection the Department notes that the well appears to be drilled but not equipped for production. The Erosion and Sedimentation Plan was onsite and appeared to be implemented as designed. No sign of accelerated erosion or sedimentation observed in relation to the well pad or access road during the inspection. The impoundment associated with the well also appears to be in sound condition and had the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2162321 Primary Facility 2013-04-02 Drilling/Alteration No Violations Noted 4/2/2013 drilling on the 1-8H.
2164827 Primary Facility 2013-04-16 Routine/Complete Inspection No Violations Noted 4/16/2013 drilling on the 8-H.
2167544 Primary Facility 2013-05-07 Routine/Complete Inspection No Violations Noted 5/7/2013 Orion rig drilling on 1-10H
2171344 Primary Facility 2013-06-03 Routine/Complete Inspection No Violations Noted At the time of inspection the Department notes that the well appears to be drilled but not equipped for production. The Erosion and Sedimentation Plan was onsite and appeared to be implemented as designed. No sign of accelerated erosion or sedimentation observed in relation to the well pad or access road during the inspection. The impoundment associated with the well also appears to be in sound condition and had the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2173695 Primary Facility 2013-05-30 Routine/Complete Inspection No Violations Noted 5/30/2013 Orion rig diling on the 1-8H. Inspected W/OGI P. Wyrwas.
2183149 Primary Facility 2013-07-11 Routine/Complete Inspection No Violations Noted At the time of inspection the Department notes that the well appears to be drilled but not equipped for production. The Erosion and Sedimentation Plan was onsite and appeared to be implemented as designed. No sign of accelerated erosion or sedimentation observed in relation to the well pad or access road during the inspection. The impoundment associated with the well also appears to be in sound condition and had the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2188046 Primary Facility 2013-07-25 Routine/Complete Inspection No Violations Noted 7/25/2013 Orion rig drilling on 1-8H.
2195638 Primary Facility 2013-08-12 Routine/Complete Inspection No Violations Noted See inspection #2195630 for observations made on 8/12/2013. Well appeared to be drilled however not equipped for production. The Operator was in the process to reconfiguring the well site to begin stimulation. No observation of accelerated erosion or sedimentation in relation to the well pad or access road at the time of inspection.
2208594 Primary Facility 2013-07-30 Drilling/Alteration No Violations Noted 7/30/2013 Orion rig drilling on 1-8H.
2259034 Primary Facility 2014-03-26 Routine/Complete Inspection No Violations Noted 3/26/2014 Produced fluids ttanks diked and GPU's
2274453 Primary Facility 2014-05-19 Routine/Complete Inspection No Violations Noted 5/19/2014 Produced fluids tanks, GPUs and in line.
2302577 Primary Facility 2014-08-27 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road at the time of inspection.
2377781 Primary Facility 2015-06-09 Routine/Complete Inspection No Violations Noted 6/9/2015 Produced fluids tanks, GPUs and in line.
2401502 Primary Facility 2015-08-20 Routine/Complete Inspection No Violations Noted 8/20/2015 Produced fluids tanks, GPUs and in line.
2444381 Primary Facility 2016-01-27 Routine/Complete Inspection No Violations Noted Access road gated and locked. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, ground snow covered, no signs of E& S issues in relation to site and/or access road.
2449989 Primary Facility 2016-01-27 Routine/Complete Inspection No Violations Noted 1/27/2016 Produced fluids tanks, GPUs and in line.
2476126 Primary Facility 2016-04-18 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production unit equipment-tank battery-dike look ok.
2554686 Primary Facility 2017-01-24 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2556708 Primary Facility 2017-01-26 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road.
2621630 Primary Facility 2017-08-02 Routine/Complete Inspection No Violations Noted Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok.
2690435 Primary Facility 2018-02-01 Routine/Complete Inspection Violation(s) Noted At the time of inspection well equipped for production. Four brine tanks within secondary containment and appear to be structurally sound. No E&S issues.

Site id sign updated to reflect current Operator information. POC plan and ERP appears to reflect outdated Operator information. Department request Operator update documents accordingly in accordance with regulation. Violations are being issued under 25 PA Code 78a.55(i)(5)(i) and 25 PA Code 78a.55(i)(5)(iii).

2741088 Primary Facility 2018-03-02 Compliance Evaluation No Violations Noted ERP and PPC plan updated.

Previously issued violations have been corrected.

2834653 Primary Facility 2019-01-28 Site Restoration No Violations Noted Inspection conducted in response to a Post-drilling Well Site Restoration Report received by Department.

The NOT for this site was approved on 6-15-18. At time of inspection well appears equipped for production. Well head protected by cement posts (photo #2). Four brine tanks on site. Site appears vegetated and returned to near original contours. The Post-drilling Well Site Restoration Report is approved.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2690435 807612 2018-02-01 2018-03-02 78a55(i)5i Environmental Health & Safety
2690435 807613 2018-02-01 2018-03-02 78a55(i)5iii Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
807612 361323 NOV - Notice of Violation 2019-01-23
807612 371697 CACP - Consent Assessment of Civil Penalty COMP - Completed 2019-01-23 2019-01-23 $11,000.00 $11,000.00
807613 361323 NOV - Notice of Violation 2019-01-23
807613 371697 CACP - Consent Assessment of Civil Penalty COMP - Completed 2019-01-23 2019-01-23 $11,000.00 $11,000.00

For data sources see[8]

References