X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28494

Well Details

Well ID: 37-129-28494
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Lower Burrell City
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: HARTGE UNIT 5H
License Status:
Spud Date:
Permit Date: 2010-12-23
Well Type: OIL
Unconventional Well: N
Configuration: Deviated Well
Conservation: No
Latitude: 40.562583
Longitude: -79.700917

For data sources see[1][2][3]

Well History

Date Event
2010-12-23 New Permit Application
2011-03-01 Performed Spud Operation
2011-03-07 Drilling Completion
2012-08-15 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2011 PENNECO OIL CO INC 32,942.00 245 16854.64 245 0.00 0
2012 PENNECO OIL CO INC 12,410.00 243 8593.06 243 0.00 0
2013 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2014 PENNECO OIL CO INC 10,666.00 365 3062.48 365 0.00 0
2015 PENNECO OIL CO INC 8,189.70 365 2530.06 304 0.00 0
2016 PENNECO OIL CO INC 7,066.77 366 1501.88 275 0.00 0
2017 PENNECO OIL CO INC 3,898.00 365 906.95 365 0.00 0
2018 PENNECO OIL CO INC 2,791.27 365 1,162.72 244 0.00 0
2019 PENNECO OIL CO INC 2,741.65 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PENNECO OIL CO INC Fracing Fluid Waste 1,000.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PENNECO OIL CO INC Produced Fluid 120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PENNECO OIL CO INC Drilling Fluid Waste 2,850.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2013 PENNECO OIL CO INC Produced Fluid 424 Bbl CENT WASTE TRT FAC NPDES PA0095443
2013 PENNECO OIL CO INC Produced Fluid 424.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Fracing Fluid Waste 253.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Produced Fluid 1,014.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Fracing Fluid Waste 253 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 1,014.00 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 695 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 695.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2017 PENNECO OIL CO INC Produced Fluid 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 PENNECO OIL CO INC Produced Fluid 96.67 Bbl INJECTION DISPOSAL WELL 34-007-2-3177

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1948428 Primary Facility 2011-02-08 Drilling/Alteration No Violations Noted Drilling 11" hole at 1320' at time of inspection. Information per drillers log and cement tickets: Cemented 509' of 11 3/4" casing in 15" hole with 260 sacks of "A" containing 3% CACL2 & 1/4# flake & .2% foam chek (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 01:00 02-06-11.
1948439 Primary Facility 2011-02-04 Drilling/Alteration No Violations Noted At time of inspection, Union Drilling rig 55 waiting on Universal Well Services to cement 212' of 16" casing in 20" hole. 32' of 24" conductor previously set and sanded in.
1948451 Primary Facility 2011-02-04 Drilling/Alteration No Violations Noted Universal Well Services cemented 212' of 16" casing in 20" hole with 170 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface not realized with plug landing at 15:30 02-04-11. Estimated that cement 10'-15' from surface. Will grout backside when cementing 11 3/4" casing.
1949124 Primary Facility 2011-02-10 Drilling/Alteration No Violations Noted Rig broke down - Swivel O-Rings - at 1955' at time of inspection.
1949910 Primary Facility 2011-02-04 Routine/Complete Inspection No Violations Noted Rig is on-site. Drilling in progress. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation.
1949926 Primary Facility 2011-02-11 Routine/Complete Inspection No Violations Noted Rig is on-site. Drilling in progress, currently at ~2050 feet. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation.
1953014 Primary Facility 2011-02-16 Drilling/Alteration No Violations Noted Waiting on kick-off cement plug at time of inspection.
1953029 Primary Facility 2011-02-17 Drilling/Alteration No Violations Noted Waiting on kick-off cement plug at time of inspection.
1953032 Primary Facility 2011-02-25 Drilling/Alteration No Violations Noted Waiting on new bit at time of inspection. Building curve at 2544' MD with kickoff point at 2461' vertical depth.
1953550 Primary Facility 2011-03-02 Drilling/Alteration No Violations Noted Drilling 7 7/8" lateral at 3498' MD with 9.3 lb/gal mud at time of inspection. Proposed total measured depth = 4450' MD.
1958609 Primary Facility 2011-03-11 Drilling/Alteration No Violations Noted Location grading being done at time of inspection.
1998540 Primary Facility 2011-08-25 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for and in production. Oil and brine tanks located onsite and they appeared to be in sound condition. There was no accelerated erosion or sedimentation observed in relation to the site or access road. The site had been properly restored and the vegetation had begun to grow. Upon achieving 70% uniform vegetative cover the operator should remove the temporary silt fencing erosion controls.

For data sources see[7]

References