X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28488

Well Details

Well ID: 37-129-28488
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Fairfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 147958
Farm/Lease Name: CHRISTIANSON 8436H
License Status:
Spud Date:
Permit Date: 2010-12-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.314711
Longitude: -79.166547

For data sources see[1][2][3]

Well History

Date Event
2010-12-09 New Permit Application
2011-12-23 Permit Renewal Application
2012-05-01 Performed Spud Operation
2012-06-16 Drilling Completion
2012-09-27 Perforation
2013-05-28 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-09-29 2012-09-29 8,507 3,331,977

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Friction Reducer - MC MX-14-5 Multi-Chem Group Friction Reducer
Other -(non hazardous) 70.00 0.03
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Acid - 7.5 HCl Acid PPG Industries Acid Other -(non hazardous) 92.50 0.43
Hydrochloric acid 7647-01-0 7.50 0.03
Water Water 7732-18-5 100.00 86.69
Biocide - MC 8650 Multi-Chem Group Biocide Glutaraldehyde 111-30-8 60.00 0.00390000
Other -(non hazardous) 40.00 0.00260000
Biocide - MC 8520 Multi-Chem Group Biocide
3,4,4-Trimethyloxazolidine 75673-43-7 4.50 0.00067000
4,4-Dimethyloxazolidine 51200-87-4 95.00 0.01
2-Amino-2-methylpropan-1-ol 124-68-5 0.50 0.00007000
Sand Proppant Quartz 14808-60-7 100.00 12.63
Acid Corrosion Inhibitor - EcoAcid CI Geosafe Chemicals Corrosion Inhibitor Other -(non hazardous) 50.00 0.00018000
100.00
Diethylene glycol monobutyl ether 112-34-5 50.00 0.00018000
Scale Inhibitor - MC-MX-588-2 Multi-Chem Group Scale Inhibitor Other -(non hazardous) 100.00 0.02
Clay Stabilizer - ClaChek G Shrieve Clay Stabilizer Water 7732-18-5 30.00 0.02
Not hazardous 70.00 0.06

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 273,673.00 103 0.00 0 0.00 0
2013 XTO ENERGY INC 674,590.00 357 0.00 0 0.00 0
2014 XTO ENERGY INC 347,672.00 331 0.00 0 0.00 0
2015 XTO ENERGY INC 281,927.00 356 0.00 0 0.00 0
2016 XTO ENERGY INC 195,260.00 361 0.00 0 0.00 0
2017 XTO ENERGY INC 187,336.00 358 0.00 0 0.00 0
2018 XTO ENERGY INC 128,898.92 304 0.00 0 0.00 0
2019 XTO ENERGY INC 142,291.76 360 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Produced Fluid 213.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 XTO ENERGY INC Fracing Fluid Waste 2,423.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 95.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 XTO ENERGY INC Fracing Fluid Waste 93.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 XTO ENERGY INC Drill Cuttings 1,810.38 Tons LANDFILL 100081
2012 XTO ENERGY INC Fracing Fluid Waste 92.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2012 XTO ENERGY INC Produced Fluid 638.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Drill Cuttings 50.12 Tons LANDFILL 101397
2012 XTO ENERGY INC Drill Cuttings 823.44 Tons LANDFILL 100434
2012 XTO ENERGY INC Produced Fluid 109.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 92.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 XTO ENERGY INC Produced Fluid 761.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 648.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 648.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 97.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Produced Fluid 487.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 184.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 184.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2015 XTO ENERGY INC Produced Fluid 618.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 270.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 235.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 262.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 336.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Basic Sediment 25.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2014-04
2018 XTO ENERGY INC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 318.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 215.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Other Oil & Gas Wastes 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2041261 Primary Facility 2012-02-01 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2054509 Primary Facility 2012-03-28 Routine/Complete Inspection No Violations Noted No issues noted.
2064291 Primary Facility 2012-05-02 Routine/Complete Inspection No Violations Noted This was a spud inspection. No issues were noted.
2068940 Primary Facility 2012-05-08 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2070099 Primary Facility 2012-05-23 Drilling/Alteration No Violations Noted UDI 61 moving onto pad to drill horizontal portion of well.
2072705 Primary Facility 2012-05-29 Routine/Complete Inspection No Violations Noted Union Drilling Rig 61 on site; 20"csg@ 43';13 3/8"@836'; 9 5/8"@ 1564'; pressure testing on 9 5/8" casing; preparing to trip in hole to drill on air to KOP; location being prepped with cover and tank battery placement; E&S controls in place;
2073274 Primary Facility 2012-06-05 Routine/Complete Inspection No Violations Noted UDI Rig 61 drilling at 7179 on water. Bit change; Location in good shape; E&S controls in place; Runoff being pumped out of open containment areas including fuel tank area.
2073299 Primary Facility 2012-06-05 Routine/Complete Inspection No Violations Noted UDI Rig 61 drilling at 7179 feet; Drilling on water; changed out bit; Containment areas including diesel fuel containment being pumped out of water; Location in good shape; E&S controls in place;
2077988 Primary Facility 2012-06-20 Incident- Response to Accident or Event Violation(s) Noted Material Released: Syn-Oil - 470 WO MSDS provided onsite- See Attached; biodegradable
2080424 Primary Facility 2012-07-02 Follow-up Inspection Outstanding Violations - No Viols Req'd Follow up on a spill. No issues noted.
2121204 Primary Facility 2012-12-05 Routine/Complete Inspection No Violations Noted 8 residual tanks still on location; containment area in good shape around tanks,seperator, heater; well producing;water in containment is fresh; no sheens; access road in good shape
2210285 Primary Facility 2013-10-04 Routine/Complete Inspection No Violations Noted On 10/04/2013 this single well pad inspection was conducted.
2211968 Primary Facility 2013-07-11 Compliance Evaluation No Violations Noted CEI inspection in response to violations which occurred on 6/20/2012 inspection #2077988 for a base oil spill. The affected area appears to be remediated. The Operator has provided the remediation results with samples results showing the base oil spill has been remediated. At the time of inspection the well appeared to be drilled and equipped for production. The associated brine tank and well apparatus appear to be in sound condition. The Erosion and Sedimentation plan was onsite and appears to be properly implemented and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad area. All perimeter BMPs appear to be installed and functioning properly. The Department suggest the Operator continue to monitor the site after significant weekly and significant precipitation events to ensure site stability is maintained.
2294252 Primary Facility 2014-08-06 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The associated brine tank and well apparatus appear to be in sound condition. The Erosion and Sedimentation plan was onsite and appears to be properly implemented and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad area. The Department suggests the Operator continue to monitor the site after weekly and significant precipitation events to ensure site stability is maintained.
2410698 Primary Facility 2015-08-07 Routine/Complete Inspection No Violations Noted 8/7/2015 produced fluids tank diked and separater.
2410705 Primary Facility 2015-09-01 Routine/Complete Inspection No Violations Noted 9/1/2015 produced fluids tank diked and separater.
2430504 Primary Facility 2015-12-03 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appeared to be in sound condition. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road. See inspection # 240500 for NOT inspection conducted on 12/3/2015.
2461108 Primary Facility 2016-03-03 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road.
2492988 Primary Facility 2016-06-10 Routine/Complete Inspection No Violations Noted system running. no issues
2680942 Primary Facility 2018-01-10 Routine/Partial Inspection No Violations Noted Routine partial inspection due to snow cover. Well appears to be in production. Well head surrounded by cement barriers and security fence.
2688610 Primary Facility 2018-01-31 Routine/Complete Inspection No Violations Noted System producing. Emergency contact present. Well tag present.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2077988 642433 06/20/2012 2012-06-20 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety
2077988 642434 06/20/2012 2012-06-20 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
642433 285266 NOV - Notice of Violation Comply/Closed 2013-07-11
642434 285266 NOV - Notice of Violation Comply/Closed 2013-07-11

For data sources see[8]

References