37-129-28398

Well Details

Well ID: 37-129-28398
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Derry Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 149487
Farm/Lease Name: USCHAK 1 2H
License Status:
Spud Date:
Permit Date: 2010-07-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.340317
Longitude: -79.363436

For data sources see[1][2][3]

Well History

Date Event
2010-07-23 New Permit Application
2010-10-29 Performed Spud Operation
2011-02-09 Drilling Completion
2011-06-29 Perforation
2013-04-29 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-07-01 2011-07-01 8,183 2,600,373

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Municipal Authority of Derry Borough Carrier/Base Fluid Water 100.00 87.47
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Sand- Silica Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 12.38
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00391400
BE-9M Halliburton Energy Services Biocide
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00199600
Methanol 67-56-1 30.00 0.00598700
Hydrochloric Acid Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 0.10
WG-36 Gelling Agent Halliburton Energy Services Gel Guar gum 9000-30-0 100.00 0.00152200
GBW-30 Breaker Halliburton Energy Services Breaker
Carbohydrates 95.00 0.00001700
Hemicellulase enzyme 9012-54-8 15.00 0.00000300
SP Breaker Halliburton Energy Services Breaker Sodium persulfate 7775-27-1 100.00 0.00001800

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 XPR RESOURCES LLC 287,909.00 162 0.00 0 0.00 0
2012 XPR RESOURCES LLC 291,259.93 363 0.00 0 0.00 0
2013 XPR RESOURCES LLC 212,088.51 365 0.00 0 0.00 0
2014 XPR RESOURCES LLC 113,585.73 363 0.00 0 0.00 0
2015 XPR RESOURCES LLC 97,410.85 365 0.00 0 0.00 0
2016 XPR RESOURCES LLC 86,319.64 362 0.00 0 0.00 0
2017 XPR RESOURCES LLC 64,021.74 360 0.00 0 0.00 0
2018 XPR RESOURCES LLC 59,612.00 329 0.00 0 0.00 0
2019 XPR RESOURCES LLC 55,607.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 XPR RESOURCES LLC Drill Cuttings 711.00 Tons LANDFILL 100434
2012 XPR RESOURCES LLC Fracing Fluid Waste 200.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XPR RESOURCES LLC Produced Fluid 939.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XPR RESOURCES LLC Drilling Fluid Waste 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XPR RESOURCES LLC Produced Fluid 441.83 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XPR RESOURCES LLC Produced Fluid 506.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XPR RESOURCES LLC Produced Fluid 623.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XPR RESOURCES LLC Produced Fluid 192.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 165.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 XPR RESOURCES LLC Waste comment only 0.00
2017 XPR RESOURCES LLC Produced Fluid 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XPR RESOURCES LLC Produced Fluid 123.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XPR RESOURCES LLC Produced Fluid 80.00 Bbl REUSE (AT WELL PAD)
2019 XPR RESOURCES LLC Produced Fluid 137.50 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1949561 Primary Facility 2011-02-02 Routine/Complete Inspection No Violations Noted Inspection was conducted during routine site visit.
1950383 Primary Facility 2011-01-31 Drilling/Alteration No Violations Noted HORIZONAL MARCELLUS
1956038 Primary Facility 2011-03-07 Routine/Complete Inspection No Violations Noted Site being perpared for Frac Job
1956071 Primary Facility 2011-02-08 Drilling/Alteration No Violations Noted HORIZONAL MARCELLUS
1961947 Primary Facility 2011-02-08 Drilling/Alteration No Violations Noted HORIZONAL MARCELLUS
2020717 Primary Facility 2011-11-18 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS
2048839 Primary Facility 2012-02-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2052705 Primary Facility 2012-03-13 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS
2058734 Primary Facility 2012-04-03 Routine/Complete Inspection No Violations Noted NOT RECLAIMED. HAS 4 PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD.
2120198 Primary Facility 2012-12-04 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. No observation of accelerated erosion and sedimentation in relation to the well pad and access road.
2131211 Primary Facility 2013-01-11 Routine/Complete Inspection No Violations Noted HORIZONAL MARCELLUS
2179705 Primary Facility 2013-06-25 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. The Department notes the Operator has started the seep remediation located on the fill side of the well site.
2182026 Primary Facility 2013-07-09 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. The Department notes the Operator has finished the installation of the infiltration ditch located on the fill side of the well site, additional the Operator has started to install additional infiltration ditches in the fill side area of the pad directly in front of the well heads. At the time of inspection he area located on the cut side of the well pad has not been regraded.
2274471 Primary Facility 2014-05-21 Routine/Complete Inspection No Violations Noted 5/21/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD.
2326010 Primary Facility 2014-12-03 Routine/Complete Inspection No Violations Noted 12/3/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD.
2374569 Primary Facility 2015-05-27 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus, brine tanks and gas production units appeared to be functioning properly.
2377810 Primary Facility 2015-06-09 Routine/Complete Inspection No Violations Noted 6/9/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND GPU'S ON PAD.
2444214 Primary Facility 2016-01-25 Routine/Complete Inspection No Violations Noted Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, ground snow covered, no signs of E& S issues in relation to site and/or access road.
2474224 Primary Facility 2016-04-12 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set-tank battery and dike look ok.
2556094 Primary Facility 2017-01-27 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2556716 Primary Facility 2017-01-27 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road.
2621775 Primary Facility 2017-08-02 Routine/Complete Inspection No Violations Noted Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok.
2681099 Primary Facility 2018-01-10 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound.

Ongoing pyritic seeps concerns are being addressed under ESCGP ESX10-129-0015, Site ID 735951, Inspection ID 2681073.

For data sources see[8]