If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28396 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.341392,"lon":-79.145644,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Fairfield Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148271 | |
Farm/Lease Name: ECKELS 8590H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-06-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.341392 | |
Longitude: -79.145644 |
Date | Event |
---|---|
2010-06-24 | New Permit Application |
2010-09-15 | Performed Spud Operation |
2010-11-13 | Drilling Completion |
2011-01-03 | Perforation |
2013-10-30 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-01-03 | 2011-01-03 | 8,274 | 4,656,792 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Feriplex 40 - Acid - Additives | Chemplex | Iron Control | Nitrilotriacetic acid trisodium monohydrate | 18662-53-8 | 40.00 | 0.00040000 | |
Sodium hydroxide | 1310-73-2 | 1.00 | 0.00001000 | |||||
Sodium sulfate | 7757-82-6 | 2.00 | 0.00002000 | |||||
Other | 57.00 | 0.00056000 | ||||||
Plexbreak 145 | Chemplex | Acid Non-Emulsifier | ||||||
Other | 85.00 | 0.00020000 | ||||||
Methanol | 67-56-1 | 15.00 | 0.00003000 | |||||
Plexcide 24L | Chemplex | Biocide | Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00700000 | ||
Sodium hydroxide | 1310-73-2 | 4.00 | 0.00120000 | |||||
Other | 72.00 | 0.02 | ||||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 10.96 | |||
Plexhib 256 | Chemplex | Corrosion Inhibitor | Methanol | 67-56-1 | 40.00 | 0.00012000 | ||
Propargyl alcohol | 107-19-7 | 8.00 | 0.00002000 | |||||
Other | 52.00 | 0.00015000 | ||||||
7.5 HCl Acid | Skylkine Chemical Corp. | Cleaning | Hydrochloric acid | 7647-01-0 | 7.50 | 0.02 | ||
Water | 7732-18-5 | 92.50 | 0.24 | |||||
Ammonium Persulfate Break | Chemplex | Gel Breaker | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 99.00 | 0.00 | ||
Other | 1.00 | 0.00 | ||||||
Water | Water | 7732-18-5 | 100.00 | 88.64 | ||||
Claymax | Chemplex | Clay Stabilizer | 100.00 | 0.00290000 | ||||
Scale Inhibitor - Greenhib 677 | Chemplex | Scale Inhibitor | Salt of phosphonomethylated diamine | 25.00 | 0.00650000 | |||
Other | 75.00 | 0.01 | ||||||
Plexslick 921 | Chemplex | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | ||
Other | 70.00 | 0.04 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 370,856.00 | 302 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 220,560.00 | 263 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 219,147.00 | 325 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 149,413.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 137,894.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 140,036.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 115,981.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 98,255.14 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 88,132.49 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | XTO ENERGY INC | Drilling Fluid Waste | 582.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Drilling Fluid Waste | 60.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | XTO ENERGY INC | Produced Fluid | 225.00 Bbl | INJECTION DISPOSAL WELL | 34-151-22783 |
2011 | XTO ENERGY INC | Fracing Fluid Waste | 6,594.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XTO ENERGY INC | Produced Fluid | 4,986.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Produced Fluid | 1,129.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2011 | XTO ENERGY INC | Produced Fluid | 312.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-24189 |
2011 | XTO ENERGY INC | Produced Fluid | 187.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | XTO ENERGY INC | Produced Fluid | 844.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XTO ENERGY INC | Produced Fluid | 1,494.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid | 414.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 935.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 104.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 104.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 104.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 4,401.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 323.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 369.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 1,315.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 1,315.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 1,333.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 379.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 379.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 1,531.91 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 101.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 774.20 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 884.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 220.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 121.13 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 125.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 846.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 25.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 1,135.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 456.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 478.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1915330 | Primary Facility | 2010-09-23 | Routine/Complete Inspection | No Violations Noted | Crew is on-site. They are laying down matting / liner in preparation to roll the heavy equipment on-site. No signs of erosion or sedimentation on the well site. The pit appears to be in sound condition. |
1923926 | Primary Facility | 2010-10-01 | Drilling/Alteration | No Violations Noted | MARCELLUS - drilling @ 588ft/E&S ok/ID&pit ok |
1923932 | Primary Facility | 2010-10-13 | Drilling/Alteration | No Violations Noted | MARCELLUS - drilling @ 6315ft/E&S ok/ID&pit ok |
1926294 | Primary Facility | 2010-11-02 | Drilling/Alteration | No Violations Noted | MARCELLUS/TD @ 11891ft - drill pipe stuck in hole - pluggged @ deviated - drilling @ 7292ft/E&S ok/ID&pit ok |
1930247 | Primary Facility | 2010-11-12 | Drilling/Alteration | No Violations Noted | NEIBORS RIG M16 JUST FINISHED RUNNING 51/2 CSG. TO 11750'. WAITING ON CEMENT TRUCKS. E&S, HOUSE KEEPING GOOD |
1930262 | Primary Facility | 2010-11-04 | Drilling/Alteration | No Violations Noted | NEIGHBORS RIG M16 DRILLING AT 8100' MUD WEIGHT AT 14LB. E&S AND HOUSE KEEPING GOOD. |
1948754 | Primary Facility | 2011-02-09 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
2013992 | Primary Facility | 2011-10-24 | Routine/Complete Inspection | No Violations Noted | XTO PAD, WELL HAS 2 PRODUCED FLUID TANKS AND HEATER UNITS. |
2020784 | Primary Facility | 2011-11-08 | Routine/Complete Inspection | No Violations Noted | XTO PAD, WELL HAS 2 PRODUCED FLUID TANKS AND HEATER UNITS. |
2077456 | Primary Facility | 2012-05-31 | Routine/Complete Inspection | No Violations Noted | XTO PAD, WELL HAS 2 PRODUCED FLUID TANKS AND HEATER UNITS. |
2086755 | Primary Facility | 2012-07-27 | Routine/Complete Inspection | No Violations Noted | Routine inspection. No issues noted. |
2121186 | Primary Facility | 2012-12-05 | Routine/Complete Inspection | No Violations Noted | Location in good shape; containment in good shape around tank battery and seperator/heater; no e&s issues; |
2362989 | Primary Facility | 2015-04-17 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. The impoundment located onsite had been effectively emptied of fluids. There was no observed accelerated erosion or sedimenation in relation to the site or access road. |
2363033 | Primary Facility | 2015-04-21 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. The impoundment located onsite had been effectively emptied of fluids. Perimeter E&S controls had been implemented below the fill slope for the impundment area, likely in anticipation of imminent earthmoving activities related to site restoration. There was no observed accelerated erosion or sedimenation in relation to the site or access road. |
2487716 | Primary Facility | 2016-05-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2579390 | Primary Facility | 2017-03-24 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2681003 | Primary Facility | 2018-01-10 | Routine/Partial Inspection | No Violations Noted | Routine partial inspection due to snow cover. Well head surrounded by cement barriers and security fence. Well appears to be in production. |
For data sources see[8]