X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28360

Well Details

Well ID: 37-129-28360
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Fairfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148930
Farm/Lease Name: MUIR
License Status:
Spud Date: 2010-08-20
Permit Date: 2010-06-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.309981
Longitude: -79.179744

For data sources see[1][2][3]

Well History

Date Event
2010-06-01 New Permit Application
2010-06-10 Performed Spud Operation
2010-09-18 Drilling Completion
2011-01-18 Perforation
2013-08-12 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-06-14 2011-06-14 8,531 4,466,070

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 7.5 HCl Acid Pumpco Services Cleaning
Hydrochloric acid 7647-01-0 7.50 0.02
Water 7732-18-5 92.50 0.32
Ammonium Persulfate Break Pumpco Services Gel Breaker
Peroxydisulfuric acid, diammonium salt 7727-54-0 99.00 0.00920000
Other 1.00 0.00010000
Sand Proppant Quartz 14808-60-7 100.00 12.17
Plexslick 921 Pumpco Services Friction Reducer Other 70.00 0.06
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Claymax Pumpco Services Clay Stabilizer 100.00 0.13
Plexcide 24L Pumpco Services Biocide Sodium hydroxide 1310-73-2 4.00 0.00120000
Other 72.00 0.02
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione 533-74-4 24.00 0.00730000
Scale Inhibitor - Greenhib 677 Pumpco Services Scale Inhibitor Other 75.00 0.01
Salt of phosphonomethylated diamine 25.00 0.00620000
Plexbreak 145 Pumpco Services Acid Non-Emulsifier
Methanol 67-56-1 15.00 0.00010000
Other 85.00 0.00045000
Feriplex 40 - Acid - Additives Pumpco Services Iron Control Other 57.00 0.00110000
Sodium sulfate 7757-82-6 2.00 0.00004000
Nitrilotriacetic acid trisodium monohydrate 18662-53-8 40.00 0.00080000
Sodium hydroxide 1310-73-2 1.00 0.00002000
Water Water 7732-18-5 100.00 87.18

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2011 XTO ENERGY INC 20,598.00 19 0.00 0 0.00 0
2012 XTO ENERGY INC 620,852.00 315 0.00 0 0.00 0
2013 XTO ENERGY INC 372,815.00 357 0.00 0 0.00 0
2014 XTO ENERGY INC 231,982.00 335 0.00 0 0.00 0
2015 XTO ENERGY INC 203,100.00 356 0.00 0 0.00 0
2016 XTO ENERGY INC 165,873.00 364 0.00 0 0.00 0
2017 XTO ENERGY INC 134,406.00 360 0.00 0 0.00 0
2018 XTO ENERGY INC 120,687.66 365 0.00 0 0.00 0
2019 XTO ENERGY INC 109,140.61 359 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 XTO ENERGY INC Produced Fluid 108.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2011 XTO ENERGY INC Produced Fluid 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-151-21920
2011 XTO ENERGY INC Produced Fluid 480.00 Bbl INJECTION DISPOSAL WELL 34-151-22783
2011 XTO ENERGY INC Produced Fluid 510.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2012 XTO ENERGY INC Produced Fluid 193.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012 XTO ENERGY INC Produced Fluid 12,304.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 204.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 XTO ENERGY INC Produced Fluid 1,328.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid 1,023.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 89.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 98.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2013 XTO ENERGY INC Produced Fluid 1,328.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 XTO ENERGY INC Produced Fluid 1,361.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 282.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 282.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 196.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 1,817.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 704.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 757.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 216.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 840.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 946.93 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 314.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 499.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1893096 Primary Facility 2010-06-11 Routine/Complete Inspection No Violations Noted The Department conducted a routine spud inspection.
1894776 Primary Facility 2010-06-21 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
1916473 Primary Facility 2010-08-30 Drilling/Alteration No Violations Noted WHEN CEMENTING 95/8 CASING THEY WERE 75' SHY OF RETURN, DID A TOP DROP GROUT 55SKS, GOOD E&S
1916675 Primary Facility 2010-06-30 Drilling/Alteration No Violations Noted spud - awaiting rig/E&S ok/ID&pit ok
2056205 Primary Facility 2012-04-03 Routine/Complete Inspection No Violations Noted This well was fracked on 6/21/2011 through 6/29/11. No violations were noted.
2093226 Primary Facility 2012-08-21 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2109442 Primary Facility 2012-10-22 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2161975 Primary Facility 2013-04-29 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2208869 Primary Facility 2013-10-01 Routine/Complete Inspection No Violations Noted This was a routine inspection.
2362983 Primary Facility 2015-04-17 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. It was noted that the impoundment located closest to the well pad had been regraded, seeded & mulched. The second impoundment was still located onsite and it contained fluids. There was more than two feet of lined freeboard in the impoundment. There was no observed accelerated erosion or sedimenation in relation to the site or access road.
2363040 Primary Facility 2015-04-21 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. It was noted that the impoundment located closest to the well pad had been regraded, seeded & mulched. The second impoundment was still located onsite and it contained fluids. There was more than two feet of lined freeboard in the impoundment. XTO was in the process of transferring the fluids contained within the impoundment via truck to the Frantz Well Pad in South Buffalo Township, Armstrong County. There was no observed accelerated erosion or sedimenation in relation to the site or access road.
2422739 Primary Facility 2015-10-28 Routine/Complete Inspection No Violations Noted Department records indicate that the Restoration Report was received on 05/31/2013. At the time of inspection well appears drilled and equipped for production. Well tag present and permanently affixed to wellhead. Site permanently stabilized. Brine tank located within secondary containment and appears structurally sound. No signs of E&S issues in relation to access road and/or site.
2535559 Primary Facility 2016-11-09 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road.
2680943 Primary Facility 2018-01-10 Routine/Partial Inspection No Violations Noted Routine partial inspection due to snow cover. Well appears to be in production. Well head surrounded by cement barriers and security fence.

For data sources see[8]

References