If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28360 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.309981,"lon":-79.179744,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Fairfield Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148930 | |
Farm/Lease Name: MUIR | |
License Status: | |
Spud Date: 2010-08-20 | |
Permit Date: 2010-06-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.309981 | |
Longitude: -79.179744 |
Date | Event |
---|---|
2010-06-01 | New Permit Application |
2010-06-10 | Performed Spud Operation |
2010-09-18 | Drilling Completion |
2011-01-18 | Perforation |
2013-08-12 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-06-14 | 2011-06-14 | 8,531 | 4,466,070 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 7.5 HCl Acid | Pumpco Services | Cleaning | |||||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.02 | |||||
Water | 7732-18-5 | 92.50 | 0.32 | |||||
Ammonium Persulfate Break | Pumpco Services | Gel Breaker | ||||||
Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 99.00 | 0.00920000 | |||||
Other | 1.00 | 0.00010000 | ||||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.17 | |||
Plexslick 921 | Pumpco Services | Friction Reducer | Other | 70.00 | 0.06 | |||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |||||
Claymax | Pumpco Services | Clay Stabilizer | 100.00 | 0.13 | ||||
Plexcide 24L | Pumpco Services | Biocide | Sodium hydroxide | 1310-73-2 | 4.00 | 0.00120000 | ||
Other | 72.00 | 0.02 | ||||||
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00730000 | |||||
Scale Inhibitor - Greenhib 677 | Pumpco Services | Scale Inhibitor | Other | 75.00 | 0.01 | |||
Salt of phosphonomethylated diamine | 25.00 | 0.00620000 | ||||||
Plexbreak 145 | Pumpco Services | Acid Non-Emulsifier | ||||||
Methanol | 67-56-1 | 15.00 | 0.00010000 | |||||
Other | 85.00 | 0.00045000 | ||||||
Feriplex 40 - Acid - Additives | Pumpco Services | Iron Control | Other | 57.00 | 0.00110000 | |||
Sodium sulfate | 7757-82-6 | 2.00 | 0.00004000 | |||||
Nitrilotriacetic acid trisodium monohydrate | 18662-53-8 | 40.00 | 0.00080000 | |||||
Sodium hydroxide | 1310-73-2 | 1.00 | 0.00002000 | |||||
Water | Water | 7732-18-5 | 100.00 | 87.18 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 20,598.00 | 19 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 620,852.00 | 315 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 372,815.00 | 357 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 231,982.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 203,100.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 165,873.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 134,406.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 120,687.66 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 109,140.61 | 359 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XTO ENERGY INC | Produced Fluid | 108.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Produced Fluid | 119.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-151-21920 |
2011 | XTO ENERGY INC | Produced Fluid | 480.00 Bbl | INJECTION DISPOSAL WELL | 34-151-22783 |
2011 | XTO ENERGY INC | Produced Fluid | 510.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid | 193.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 12,304.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 204.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Produced Fluid | 1,328.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 1,023.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 89.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 98.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 1,328.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2014 | XTO ENERGY INC | Produced Fluid | 1,361.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 282.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 282.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 196.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 1,817.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 704.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 757.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 216.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 840.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 946.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 314.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 499.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1893096 | Primary Facility | 2010-06-11 | Routine/Complete Inspection | No Violations Noted | The Department conducted a routine spud inspection. |
1894776 | Primary Facility | 2010-06-21 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
1916473 | Primary Facility | 2010-08-30 | Drilling/Alteration | No Violations Noted | WHEN CEMENTING 95/8 CASING THEY WERE 75' SHY OF RETURN, DID A TOP DROP GROUT 55SKS, GOOD E&S |
1916675 | Primary Facility | 2010-06-30 | Drilling/Alteration | No Violations Noted | spud - awaiting rig/E&S ok/ID&pit ok |
2056205 | Primary Facility | 2012-04-03 | Routine/Complete Inspection | No Violations Noted | This well was fracked on 6/21/2011 through 6/29/11. No violations were noted. |
2093226 | Primary Facility | 2012-08-21 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2109442 | Primary Facility | 2012-10-22 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2161975 | Primary Facility | 2013-04-29 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2208869 | Primary Facility | 2013-10-01 | Routine/Complete Inspection | No Violations Noted | This was a routine inspection. |
2362983 | Primary Facility | 2015-04-17 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. It was noted that the impoundment located closest to the well pad had been regraded, seeded & mulched. The second impoundment was still located onsite and it contained fluids. There was more than two feet of lined freeboard in the impoundment. There was no observed accelerated erosion or sedimenation in relation to the site or access road. |
2363040 | Primary Facility | 2015-04-21 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. It was noted that the impoundment located closest to the well pad had been regraded, seeded & mulched. The second impoundment was still located onsite and it contained fluids. There was more than two feet of lined freeboard in the impoundment. XTO was in the process of transferring the fluids contained within the impoundment via truck to the Frantz Well Pad in South Buffalo Township, Armstrong County. There was no observed accelerated erosion or sedimenation in relation to the site or access road. |
2422739 | Primary Facility | 2015-10-28 | Routine/Complete Inspection | No Violations Noted | Department records indicate that the Restoration Report was received on 05/31/2013. At the time of inspection well appears drilled and equipped for production. Well tag present and permanently affixed to wellhead. Site permanently stabilized. Brine tank located within secondary containment and appears structurally sound. No signs of E&S issues in relation to access road and/or site. |
2535559 | Primary Facility | 2016-11-09 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2680943 | Primary Facility | 2018-01-10 | Routine/Partial Inspection | No Violations Noted | Routine partial inspection due to snow cover. Well appears to be in production. Well head surrounded by cement barriers and security fence. |
For data sources see[8]