If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28076 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.342025,"lon":-79.088987,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Saint Clair Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148350 | |
Farm/Lease Name: FLICKINGER UNIT 8447H | |
License Status: | |
Spud Date: 2010-01-16 | |
Permit Date: 2009-09-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.342025 | |
Longitude: -79.088987 |
Date | Event |
---|---|
2009-09-22 | New Permit Application |
2010-01-16 | Performed Spud Operation |
2010-02-20 | Drilling Completion |
2010-04-11 | Perforation |
2011-01-13 | Deviated |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | XTO ENERGY INC | 158,415.00 | 122 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 184,204.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 144,020.00 | 255 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 144,412.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 92,629.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 84,641.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 89,220.00 | 346 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 78,233.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 68,866.71 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 63,098.21 | 345 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | XTO ENERGY INC | Produced Fluid | 7,021.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Drilling Fluid Waste | 4,264.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 2,140.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XTO ENERGY INC | Produced Fluid | 4,965.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Produced Fluid | 108.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-24189 |
2011 | XTO ENERGY INC | Produced Fluid | 420.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-167-29395 |
2011 | XTO ENERGY INC | Produced Fluid | 1,855.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2011 | XTO ENERGY INC | Produced Fluid | 453.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2011 | XTO ENERGY INC | Produced Fluid | 1,761.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 88.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | XTO ENERGY INC | Produced Fluid | 104.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 104.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 104.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 4,058.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 1,022.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 1,022.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 770.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 92.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | XTO ENERGY INC | Produced Fluid | 189.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 189.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 1,041.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 190.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 1,522.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Other Oil & Gas Wastes | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 779.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 902.10 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 900.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Other Oil & Gas Wastes | 215.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 352.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 57.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Other Oil & Gas Wastes | 67.78 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 1,212.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 65.84 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 190.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 133.20 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 7.78 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2014-04 |
2019 | XTO ENERGY INC | Produced Fluid | 19.80 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 30.58 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 420.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 686.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 279.20 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1828923 | Primary Facility | 2009-09-10 | Routine/Complete Inspection | No Violations Noted | Performed routine inspection for waiver request. Changes were made on the E&S plan describing what is to be done with the drill cuttings, due to the seasonal high groundwater table. The filter fabric fence backed with hay bales should be a sufficient BMP to protect Tubmill creek (TSF). The site has a very low slope. April Weiland was present for training purposes. |
1849964 | Primary Facility | 2009-12-01 | Routine/Complete Inspection | No Violations Noted | Performed a site inspection as the result of an inquiry from a concerned citizen. Drilling has been completed and the pit has been backfilled. BMP's are present and working properly. There is no evidence of accelerated erosion or sedimentation on the access road or well site. There has been no impact to the adjacent stream. |
1851073 | Primary Facility | 2009-12-16 | Complaint Inspection | No Violations Noted | The Department conducted and investigation in response to a concern about excessive flooding resulting in property damage to the residence next door. The Department met with XTO, PA conservancy, and Mr. Carl Whipkey. Mr. Whipkey believes that the construction of this site will cause excessive run off on to his property. All E&S controls and BMPs are in place and functioning properly. I concluded that there is no evidential proof that this well site will cause any excessive runoff on the complainant¿s property. All of these allegations are based on speculation. |
1870171 | Primary Facility | 2010-01-26 | Drilling/Alteration | No Violations Noted | MARCELLUS HORIZONTAL |
1870172 | Primary Facility | 2010-02-16 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
1870173 | Primary Facility | 2010-02-17 | Drilling/Alteration | No Violations Noted | MARCELLUS HORIZONTAL |
1874304 | Primary Facility | 2010-03-31 | Drilling/Alteration | No Violations Noted | |
1888041 | Primary Facility | 2010-05-24 | Routine/Complete Inspection | No Violations Noted | Well is drilled and fraced. |
1893082 | Primary Facility | 2010-06-11 | Routine/Complete Inspection | No Violations Noted | The Department conducted a routine inspection. Ben Kissel from XTO notified me that they wanted to rework the infiltration ditch that had been implemented to control storm water run-off. The well has been completed. The Department and XTO met with an agreement on how the ditch should be constructed to hold water. This site is in compliance |
1894912 | Primary Facility | 2010-06-23 | Drilling/Alteration | No Violations Noted | MARCELLUS HORIZONTAL WELL HEAD PRESURE 5000 PSI. CREW ARE REBUILDING CULVERTS AND FENCES. WATER TRUCKS WERE EMPTYING FRAC TANKS WHILE I WAS ON LOCATION,SOME ODORS ASSOCIATED WITH FLOW BACK ARE STILL LINGERING BUT MOST OF FRAC TANKS ARE GONE NOW.SITE AND SURRONDING AREA IS CLEAN.A CAGE HAS BEEN BUILT AROUND THE WELLHEAD TO PROTECT THE WELL INTEGRITY FROM VANDILS. |
1906436 | Primary Facility | 2010-08-04 | Complaint Inspection | Violation(s) Noted | Received a complaint that Tub Mill Run was cloudy and had a red color. Also received a phone call from the operator stating that a Bentonite release had occurred while boring under the stream. |
1923062 | Primary Facility | 2010-09-14 | Compliance Evaluation | No Violations Noted | Inspection performed as a follow-up to a previously issued NOV, in which Bentonite was released into Tub Mill Run. |
1955027 | Primary Facility | 2011-03-02 | Routine/Complete Inspection | No Violations Noted | Site visit was in response to a gas odor complaint received on Tuesday 3-1-2011. |
1984142 | Primary Facility | 2011-06-20 | Complaint Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2010405 | Primary Facility | 2011-10-05 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2011044 | Primary Facility | 2011-10-05 | Complaint Inspection | No Violations Noted | Site visit was in response to complaint #283781. A conduit line was being installed along the outside of the pad. Concrete was being used in the installation. The concrete trucks washed there chutes on the front corner of the pad. This water did make its way into the ditch surrounding the site. However, no water left the site. Ben Kissel (XTO) was informed of the incident. The below grade line installation was complete, future installation will be above grade. |
2051606 | Primary Facility | 2012-03-19 | Routine/Complete Inspection | No Violations Noted | No issues noted. |
2073307 | Primary Facility | 2012-06-05 | Routine/Complete Inspection | No Violations Noted | Well is drilled, fraced and in line; Location is not reclaimed but is well stoned and in good shape with no E&S issues; |
2089585 | Primary Facility | 2012-08-07 | Routine/Complete Inspection | No Violations Noted | Routine inspection. No issues noted. |
2174068 | Primary Facility | 2013-06-11 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2213814 | Primary Facility | 2013-10-18 | Routine/Complete Inspection | No Violations Noted | This was a routine inspection. Early wet fall conditions were prevalent throughout the SWR. |
2294233 | Primary Facility | 2014-08-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The associated brine tank and well apparatus appear to be in sound condition. The Erosion and Sedimentation plan was onsite and appears to be properly implemented and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad area. The Department suggests the Operator continue to monitor the site after weekly and significant precipitation events to ensure site stability is maintained. |
2451639 | Primary Facility | 2016-02-22 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Two brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E&S issues in relation to site and/or access road. |
2504366 | Primary Facility | 2016-07-22 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2595085 | Primary Facility | 2017-05-18 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues. |
2676487 | Primary Facility | 2018-01-02 | Routine/Complete Inspection | No Violations Noted | System running no issues. Well tag present. Emergency contact sign present. |
2682699 | Primary Facility | 2018-01-16 | Routine/Partial Inspection | No Violations Noted | Routine partial inspection due to snow cover. Well appears to be in production. Well head surrounded by cement barriers and security fence. |
2688602 | Primary Facility | 2018-01-31 | Routine/Complete Inspection | No Violations Noted | System producing. Emergency contact present. Well tag present. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1906436 | 593265 | 08/04/2010 | 2010-08-04 | 401 CSL - Discharge of pollutional material to waters of Commonwealth. | Environmental Health & Safety | |
1906436 | 593266 | 08/04/2010 | 2010-08-04 | 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt | Environmental Health & Safety | |
1906436 | 593267 | 08/04/2010 | 2010-08-04 | 307CSL - Discharge of industrial waste to waters of Commonwealth without a permit. | Environmental Health & Safety | |
1906436 | 593268 | 08/04/2010 | 2010-08-04 | 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
593265 | 261230 | NOV - Notice of Violation | Comply/Closed | 2010-09-14 | |||
593265 | 269272 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-04-05 | 2011-04-05 | $5,500.00 | $5,500.00 |
593266 | 261230 | NOV - Notice of Violation | Comply/Closed | 2010-09-14 | |||
593266 | 269272 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-04-05 | 2011-04-05 | $5,500.00 | $5,500.00 |
593267 | 261230 | NOV - Notice of Violation | Comply/Closed | 2010-09-14 | |||
593267 | 269272 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-04-05 | 2011-04-05 | $5,500.00 | $5,500.00 |
593268 | 261230 | NOV - Notice of Violation | Comply/Closed | 2010-09-14 | |||
593268 | 269272 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-04-05 | 2011-04-05 | $5,500.00 | $5,500.00 |
For data sources see[7]