37-129-28075

Well Details

Well ID: 37-129-28075
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Fairfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148271
Farm/Lease Name: ECKELS 8448H
License Status:
Spud Date: 2010-02-05
Permit Date: 2009-09-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.341356
Longitude: -79.145666

For data sources see[1][2][3]

Well History

Date Event
2009-09-23 New Permit Application
2010-02-04 Performed Spud Operation
2010-04-03 Drilling Completion
2010-04-28 Perforation
2013-10-31 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2010 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2011 XTO ENERGY INC 334,307.00 302 0.00 0 0.00 0
2012 XTO ENERGY INC 204,571.00 281 0.00 0 0.00 0
2013 XTO ENERGY INC 186,577.00 359 0.00 0 0.00 0
2014 XTO ENERGY INC 128,428.00 335 0.00 0 0.00 0
2015 XTO ENERGY INC 115,632.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 106,985.00 346 0.00 0 0.00 0
2017 XTO ENERGY INC 93,700.00 351 0.00 0 0.00 0
2018 XTO ENERGY INC 84,850.59 365 0.00 0 0.00 0
2019 XTO ENERGY INC 75,905.33 358 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 XTO ENERGY INC Fracing Fluid Waste 8,510.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 XTO ENERGY INC Drilling Fluid Waste 365.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 XTO ENERGY INC Produced Fluid 108.00 Bbl INJECTION DISPOSAL WELL 34-151-22783
2011 XTO ENERGY INC Produced Fluid 6,912.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2011 XTO ENERGY INC Produced Fluid 122.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC001
2011 XTO ENERGY INC Produced Fluid 1,312.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011 XTO ENERGY INC Produced Fluid 427.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-133-24189
2011 XTO ENERGY INC Produced Fluid 215.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-133-20114
2011 XTO ENERGY INC Produced Fluid 1,349.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 XTO ENERGY INC Produced Fluid 180.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 XTO ENERGY INC Produced Fluid 1,849.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 XTO ENERGY INC Produced Fluid 2,892.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2012 XTO ENERGY INC Produced Fluid 224.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 XTO ENERGY INC Produced Fluid 1,772.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid 212.00 Bbl INJECTION DISPOSAL WELL 114
2012 XTO ENERGY INC Produced Fluid 212.00 Bbl INJECTION DISPOSAL WELL 0114
2012 XTO ENERGY INC Produced Fluid 212.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012 XTO ENERGY INC Produced Fluid 6,240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 328.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 1,329.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2013 XTO ENERGY INC Produced Fluid 1,513.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 1,513.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid 96.00 Bbl INJECTION DISPOSAL WELL 34-155-23759
2014 XTO ENERGY INC Produced Fluid 299.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Produced Fluid 2,078.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 193.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 193.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2015 XTO ENERGY INC Produced Fluid 2,267.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XTO ENERGY INC Produced Fluid 1,184.07 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 132.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 879.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 360.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 123.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 1,444.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 176.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 1,665.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Waste Water Treatment Sludge 4.09 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2014-04
2019 XTO ENERGY INC Produced Fluid 603.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 796.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1863851 Primary Facility 2010-02-17 Routine/Complete Inspection No Violations Noted The Department conducted a routine spud inspection.
1868496 Primary Facility 2010-03-09 Routine/Complete Inspection No Violations Noted On March 9, 2010 I conducted an inspection for an OG 57 Request for waiver of distance requirement. The proposed frac pit will encroach within 50 feet of Hypocrite Creek. Construction of the frac pit has not yet begun. The well permit was issued 9/23/09. Drilling was taking place at the time of the inspection. The frac pit will be located on the opposite side of Hypocrite Creek Road from the drill pad. Proposed E & S plan should protect stream from adverse impact during frac pit construction if properly implemented & maintained
1874302 Primary Facility 2010-03-31 Drilling/Alteration No Violations Noted
1881440 Primary Facility 2010-04-26 Drilling/Alteration No Violations Noted UDI 209 GONE, SITE IS CLEAN
1887937 Primary Facility 2010-05-27 Complaint Inspection Violation(s) Noted THe operator had a spill of about 5 barrels worth of frac fluids that escaped from a frac tank because the valve was not shut properly.
1888045 Primary Facility 2010-05-24 Routine/Complete Inspection No Violations Noted The Department conducted a routine inspection.
1894895 Primary Facility 2010-06-23 Drilling/Alteration No Violations Noted MARCELLUS HORIZONAL WELL IS NOT PRODUCING.5000 PSI AT WELLHEAD,ANNULUS IS CLOSED.FRAC POND IS FENCED IN WITH JERSEY BARRIES TO PREVENT VEHICLES FROM DRIVING INTO POND.AN INTERTUBE IS FLOATING IN THE WATER FOR SAFETY PURPOSES.EXCAVATORS IS CLEANING OUT CULVERTS AND INSTALLING A 15 PERFORATED DRAIN WITH 2 INLETS AT THE REQUEST OF FAIRFIELD TWP.SITE LOOKS GOOD.
1903673 Primary Facility 2010-06-11 Compliance Evaluation Outstanding Violations - No Viols Req'd Performed a follow-up inspection as the result of a previously issued NOV for a fluid release.
1903698 Primary Facility 2010-07-21 Compliance Evaluation No Violations Noted Performed a follow-up inspection as the result of a previously issued NOV for a fluid release.
1903709 Primary Facility 2010-08-04 Routine/Complete Inspection No Violations Noted Well is drilled, but not equipped for production. Site ID sign and E&S plan located. Fresh water impoundment appears to be in sound condition. There is no evidence of erosion or sedimentation at this time.
1915333 Primary Facility 2010-09-23 Routine/Complete Inspection No Violations Noted Well is drilled, but not equipped for production. Crews are currently on-site preparing to begin work on the Eckels 8590H well. Site ID sign and E&S plan located. Fresh water impoundment appears to be in sound condition. There is no evidence of erosion or sedimentation at this time.
1948753 Primary Facility 2011-02-09 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2013996 Primary Facility 2011-10-24 Routine/Complete Inspection No Violations Noted XTO PAD, WELL HAS 2 PRODUCED FLUID TANKS AND HEATER UNITS.
2020776 Primary Facility 2011-11-07 Routine/Complete Inspection No Violations Noted XTO PAD, WELL HAS 2 PRODUCED FLUID TANKS AND HEATER UNITS.
2077453 Primary Facility 2012-05-31 Routine/Complete Inspection No Violations Noted XTO PAD, WELL HAS 2 PRODUCED FLUID TANKS AND HEATER UNITS.
2086756 Primary Facility 2012-07-27 Routine/Complete Inspection No Violations Noted Routine inspection. No issues noted.
2121188 Primary Facility 2012-12-05 Routine/Complete Inspection No Violations Noted location in good shape; containment in good shape around tank battery, seperator and heater; no e&s issues;
2363023 Primary Facility 2015-04-17 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. The impoundment located onsite had been effectively emptied of fluids. There was no observed accelerated erosion or sedimenation in relation to the site or access road.
2363030 Primary Facility 2015-04-21 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. The impoundment located onsite had been effectively emptied of fluids. Perimeter E&S controls had been implemented below the fill slope for the impundment area, likely in anticipation of imminent earthmoving activities related to site restoration. There was no observed accelerated erosion or sedimenation in relation to the site or access road.
2487722 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road.
2579386 Primary Facility 2017-03-24 Routine/Complete Inspection No Violations Noted system running. no issues
2681002 Primary Facility 2018-01-10 Routine/Partial Inspection No Violations Noted Routine partial inspection due to snow cover. Well head surrounded by cement barriers and security fence. Well appears to be in production.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1887937 588239 05/27/2010 2010-05-27 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table Administrative The valve on the frac tank was not sealed properly and this resulted in a release of about 5 barrels worth of frac fluids to the ground.
1887937 588240 05/27/2010 2010-05-27 301UNPMTIW - Industrial waste was discharged without permit. Environmental Health & Safety The open valve on the frac tank allowed a release of fluids that could be classified as industrial waste.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
588239 258422 NOV - Notice of Violation Comply/Closed 2010-07-21
588239 262367 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-09-20 2010-09-20 $6,750.00 $6,750.00
588240 258422 NOV - Notice of Violation Comply/Closed 2010-07-21
588240 262367 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-09-20 2010-09-20 $6,750.00 $6,750.00