If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-27952 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.3039,"lon":-79.216755,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Ligonier Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148947 | |
Farm/Lease Name: NELSON 8392H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-06-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.3039 | |
Longitude: -79.216755 |
Date | Event |
---|---|
2009-06-11 | New Permit Application |
2009-11-17 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 136,723.00 | 262 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 120,361.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 91,918.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 77,029.00 | 340 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 65,699.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 52,357.00 | 281 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 62,778.00 | 332 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 54,124.11 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 47,078.13 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | XTO ENERGY INC | Fracing Fluid Waste | 2,403.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | XTO ENERGY INC | Drilling Fluid Waste | 1,010.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 1,880.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 6,874.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2011 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-151-22783 |
2011 | XTO ENERGY INC | Produced Fluid | 6,368.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Produced Fluid | 1,542.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2011 | XTO ENERGY INC | Produced Fluid | 552.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-24189 |
2011 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-20114 |
2011 | XTO ENERGY INC | Produced Fluid | 218.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XTO ENERGY INC | Produced Fluid | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | XTO ENERGY INC | Produced Fluid | 1,194.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XTO ENERGY INC | Produced Fluid | 1,093.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid | 1,235.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 519.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 214.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 214.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 214.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 5,549.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 316.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 1,882.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 761.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 1,882.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 208.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 94.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 848.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 197.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 197.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 1,152.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 746.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 320.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 88.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 761.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 157.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 926.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 117.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 490.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 200.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1847547 | Primary Facility | 2009-11-19 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS UDI 209 IS WAITING ON TOTCO TO FIX THE AUTO DRILLER. SITE IS CLEAN, E&S IN PLACE |
1853667 | Primary Facility | 2009-12-08 | Drilling/Alteration | No Violations Noted | UDI 209 Shanked a hammer bit. Please notify the inspector of any downhole defects. Fences around the pit are fallen down and/or missing leaving the pit unprotected from unauthorized acts of third parties (78:56a3) |
1853670 | Primary Facility | 2009-12-30 | Drilling/Alteration | No Violations Noted | UDI 209 laying down drill pipe. Rig will be moving to new location on Monday. Efforts to keep mud off the ground with liners have proven to be effective so far. |
1881434 | Primary Facility | 2010-04-22 | Drilling/Alteration | No Violations Noted | UDI 209 GONE, WELL NOT PRODUCING YET, SITE CLEAN |
1939316 | Primary Facility | 2010-12-01 | Routine/Complete Inspection | No Violations Noted | NABORS RIG M16 DRILLING ON NELSON PAD FOR XTO, THIS IS AN EXISTING WELL ON THE PAD. |
1955581 | Primary Facility | 2011-03-02 | Routine/Complete Inspection | No Violations Noted | Wells were drilled. Site was being prepped for frac¿ing. |
1955592 | Primary Facility | 2011-03-04 | Routine/Complete Inspection | No Violations Noted | Wells were drilled. Site was being prepped for frac¿ing. |
1964120 | Primary Facility | 2011-04-01 | Routine/Complete Inspection | No Violations Noted | Well has been Fraced ; Operator was running 2" tubing with a snubbing unit ; All Pitts were well below the 2ft free board limit |
1965726 | Primary Facility | 2011-04-07 | Routine/Complete Inspection | Violation(s) Noted | The inspection was done after frac¿ing and flaring of well. |
1980571 | Primary Facility | 2011-06-09 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | Site visit was in coordination with Ben Kissel (XTO ¿not present), Tom Burnett (XTO) and Rick Bonazza (Resource Management Services, Inc.) to discus clean up efforts for 4-7-11 discharge incident. |
1986717 | Primary Facility | 2011-07-07 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Site visit was in coordination with Ben Kissel (XTO ¿not present), Tom Burnett (XTO) and Rick Bonazza (Resource Management Services, Inc.) and J.D. Dean (XTO) to conduct sampling for 4-7-11 discharge incident. Sampling grid was laid out and coordinates were taken. A small back hoe was used to dig 2¿ deep holes at each marked spot. Each pit had a representative sample taken from the excavation. The sampling and analysis was documented in a letter submitted to the DEP by Mr. Bonazza on behalf of XTO. |
2038803 | Primary Facility | 2012-02-01 | Routine/Complete Inspection | No Violations Noted | |
2066084 | Primary Facility | 2012-04-26 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2068670 | Primary Facility | 2012-05-17 | Routine/Complete Inspection | No Violations Noted | 3 tanks onsite. E&S ok. Id sign in place. |
2094446 | Primary Facility | 2012-08-24 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2103396 | Primary Facility | 2012-09-27 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2150399 | Primary Facility | 2013-03-22 | Compliance Evaluation | No Violations Noted | Routine inspection. Both impoundments were reclaimed since the last inspection. |
2206380 | Primary Facility | 2013-09-23 | Routine/Complete Inspection | No Violations Noted | On 9/23/13 this 3 producing Marcellus wells pad inspection was conducted. |
2208534 | Primary Facility | 2013-09-25 | Routine/Complete Inspection | No Violations Noted | 3 wells onsite equipped for production. Tags, tanks, e&s ok. |
2254017 | Primary Facility | 2014-03-17 | Routine/Complete Inspection | No Violations Noted | On 3/17/14 this Three well pad was inspected. The site has Three producing Marcellus wells. |
2680936 | Primary Facility | 2018-01-10 | Routine/Partial Inspection | No Violations Noted | Routine partial inspection due to snow cover. Multi well Marsellus site. Well appears to be in production. Well head surrounded by cement barriers and security fence. Water truck on site during inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1965726 | 612453 | 03/28/2011 | 2011-03-28 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
612453 | 271166 | NOV - Notice of Violation | Comply/Closed | 2013-03-22 |
For data sources see[7]