X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-28576

Well Details

Well ID: 37-125-28576
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Cecil Township
Operator Name: UNKNOWN OPR
Well Pad ID:
Farm/Lease Name:
License Status:
Spud Date:
Permit Date:
Well Type: UNDETERMINED
Unconventional Well: N
Configuration: Undetermined
Conservation: No
Latitude: 40.3608
Longitude: -80.2405

For data sources see[1][2][3]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2746202 Primary Facility 2018-06-06 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig not on site yet. Rig and equipment currently mobilizing to location.
2750729 Primary Facility 2018-06-19 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig hit obstruction in hole at ~100'. TIH with open ended drillpipe, with no results. Will TOOH and rig up box tap.
2750913 Primary Facility 2018-07-02 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig drilling out cavings/fill at 273' with 7 7/8" tricone bit. Drilling with gelled water.
2750949 Primary Facility 2018-07-05 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig drilling out red rock cavings/fill at 483'. Getting good returns.
2754101 Primary Facility 2018-07-09 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig fishing at 712' with box tap after hitting resistance earlier today.
2754443 Primary Facility 2018-07-10 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig milling/cleaning out hole at 825'.
2755079 Primary Facility 2018-07-12 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig milling/cleaning out hole at 1118' with 3 3/4" mill. Very slow progress; ~20 minutes/foot.
2755364 Primary Facility 2018-07-16 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig cleaning out hole with 6 1/8" tricone bit. Got to ~1081' and hit pipe. (Got to 1118' with 3 1/2" mill) Will put on another mill.
2757369 Primary Facility 2018-07-23 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig tagged top of bottom-hole cement plug at 1083'. Remaining casings in hole have been perforated. Next plug will be pumped later today.
2757402 Primary Facility 2018-07-24 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig tagged top of cement plug at 840'. Waiting on cement truck to pump next plug.
2757643 Primary Facility 2018-07-26 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig plugged well to surface. Last plug dropped ~5 feet below GL. Rigging down.

For data sources see[4]

References