X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-28177

Well Details

Well ID: 37-125-28177
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: West Bethlehem Township
Operator Name: EQT PROD CO
Well Pad ID: 150743
Farm/Lease Name: KOCI 592406
License Status:
Spud Date:
Permit Date: 2017-02-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.999133
Longitude: -80.106561

For data sources see[1][2][3]

Well History

Date Event
2017-02-27 New Permit Application
2017-03-17 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-07-23 2017-07-30 7,737 8,950,150 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Methanol 67-56-1 30 0.0065573 5626.37
Oxyalkylated Alcohol A Proprietary 5 0.0041989 3602.79
Alcohols, C7-9-iso, C8-rich 68526-83-0 5 0.00001683 14.437
Isoproyl Alcohol 67-63-0 5 0.00001683 14.437
Alcohols, C7-9-iso, C8-rich 68526-83-0 5 0.00001683 14.437
Methanol 67-56-1 30 0.0065573 5626.37
Fatty Imidazoline 61790-69-0 5 0.00001683 14.437
Oxyalkylated Alcohol A Proprietary 5 0.0041989 3602.79
Prop-2-yn-1-ol 107-19-7 5 0.00001683 14.437
Prop-2-yn-1-ol 107-19-7 5 0.00001683 14.437
Ethylbenzene 100-41-4 1 0.00000337 2.887
Hydrochloric Acid 7647-01-0 15 0.0332895 28563.5
Xylene 1330-20-7 5 0.00001683 14.437
Alkyl Alcohol Proprietary 10 0.00839781 7205.58
Alkyl Alcohol Proprietary 10 0.00839781 7205.58
Hydrotreated Light Distillate 64742-47-8 30 0.0251934 21616.7
Isoproyl Alcohol 67-63-0 5 0.00001683 14.437
Sodium Hydroxide 1310-73-2 5 0.000469387 402.749
Ethylbenzene 100-41-4 1 0.00000337 2.887
Methanol 67-56-1 90 0.000302872 259.874
Methanol 67-56-1 90 0.000302872 259.874
Fatty Imidazoline 61790-69-0 5 0.00001683 14.437
Xylene 1330-20-7 5 0.00001683 14.437
Silica Substrate 14808-60-7 100 12.6156 10,824,600.0
Sodium Hypochlorite 7681-52-9 16 0.00150204 1288.8
Hydrochloric Acid (15%) Keane Acidizing Listed Below
Sand (Proppant) Keane Proppant Listed Below
KAI-12 Keane Acid Inhibitor Water 7732-18-5 89.7 0.00842081 7225.32
Other Chemical(s) Listed Above See Trade Name(s) List Listed Below
KSI-19 Keane Scale Inhibitor Listed Below
FFR-760 Nalco Friction Reducer Listed Below
Water Keane Carrier/Base Fluid Water 7732-18-5 100 87.0469 74,689,000.0
BrOX Dirk Thomas Industrial Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 EQT PROD CO 925,117.00 119 0.00 0 0.00 0
2018 EQT PROD CO 1,587,470.00 364 0.00 0 0.00 0
2019 EQT PROD CO 777,103.00 281 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 EQT PROD CO Synthetic Liner Materials 33.52 Tons LANDFILL 100419
2017 EQT PROD CO Produced Fluid 96.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Other Oil & Gas Wastes 1,540.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Other Oil & Gas Wastes 90.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 96.17 Bbl RESIDUAL WASTE PROCESSING FACILITY
2017 EQT PROD CO Produced Fluid 2,239.61 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Drilling Fluid Waste 1,560.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 21.31 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 EQT PROD CO Drill Cuttings 1,359.39 Tons LANDFILL 100419
2017 EQT PROD CO Produced Fluid 58.36 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 EQT PROD CO Produced Fluid 660.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 328.13 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 54.77 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Other Oil & Gas Wastes 202.69 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 140.24 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 EQT PROD CO Produced Fluid 22.92 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Produced Fluid 1,285.60 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 8.46 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 EQT PROD CO Produced Fluid 516.80 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 EQT PROD CO Other Oil & Gas Wastes 16.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 26.15 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 EQT PROD CO Produced Fluid 34.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 12.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Other Oil & Gas Wastes 100.16 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2575042 Primary Facility 2017-03-22 Drilling/Alteration No Violations Noted Cellar Tech auger rig

Drilled a 30” wellbore and set 26” conductor casing at 40 ft. on 3/17/17.

2576013 Primary Facility 2017-03-22 Drilling/Alteration No Violations Noted Fountain Quail Energy Services Rig #6

Moved onto this well on 3/19/17 and resumed drilling at 53 ft. KB on 3/20/17. The 18 5/8” casing was set at 641 ft. on 3/21/17 and cemented to surface with 51 bbls returned. Currently at 885 ft. and TIH with tri-cone bit.

2579291 Primary Facility 2017-03-29 Drilling/Alteration No Violations Noted Fountain Quail Energy Services Rig #6

The 13 3/8” casing was set at 940 ft. on 3/23/17 and grouted to surface above a basket. Coal was found from 897 ft. to 905 ft. A basket was set at 869 ft. The 9 5/8” casing was set at 3493 ft. on 3/26/17 and cemented to surface with 50 bbls returned. A Casing Annulus Packer was set in the 9 5/8” casing string from 1795 ft. to 1805 ft. Currently at 3670 ft. and drilling ahead.

2582194 Primary Facility 2017-04-10 Drilling/Alteration No Violations Noted Fountain Quail Energy Services Rig #6

KOP was at 3540 ft. TD was at 5661 ft. MD on 3/30/17.

2590281 Primary Facility 2017-05-03 Drilling/Alteration No Violations Noted Savanna Drilling Rig #803

Moved onto this well on 4/13/17 and resumed drilling at 5614 ft. MD. EOB on the curve was at 9330 ft. MD (7725 ft. TVD). TD was at 17,350 ft. MD (7732 ft. TVD) on 4/29/17. The 5 ½” casing was set at 17,350 ft. The estimated TOC is at 6800 ft.

2720503 Primary Facility 2018-04-18 Routine/Complete Inspection No Violations Noted This well has been completed and is currently producing. Reclamation of the pad is underway. The pad and equipment appear to be well maintained.
2735965 Primary Facility 2018-05-18 Routine/Complete Inspection No Violations Noted On Friday, May 18, 2018, I conducted a routine-complete inspection of the Koci Well Site located in West Bethlehem Township, Washington County.

Gas well 592406 and the associated infrastructure appeared to be in good condition and functioning properly. The well was tagged with identification.

No violations were identified during the inspection.

2815273 Primary Facility 2018-12-12 Routine/Complete Inspection No Violations Noted On Wednesday December 12, 2018 I conducted a routine-complete inspection at the Koci Well Site located in West Bethlehem Township, Greene County.

The gas well and the associated infrastructure appeared to be in good condition and functioning properly. The gas well was tagged with identification.

No violations were identified during the inspection.

For data sources see[8]

References