37-125-27929

Well Details

Well ID: 37-125-27929
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: East Finley Township
Operator Name: EQT PROD CO
Well Pad ID: 153510
Farm/Lease Name: JT FARM 593018
License Status:
Spud Date:
Permit Date: 2017-01-25
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.067369
Longitude: -80.396675

For data sources see[1][2][3]

Well History

Date Event
2017-01-25 New Permit Application
2017-06-23 Performed Spud Operation
2017-11-29 MOD
2018-10-29 MOD

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 EQT PROD CO 0.00 0 0.00 0 0.00 0
2019 EQT PROD CO 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 EQT PROD CO Drill Cuttings 222.73 Tons LANDFILL 100663
2017 EQT PROD CO Drill Cuttings 465.34 Tons LANDFILL 100172
2017 EQT PROD CO Other Oil & Gas Wastes 120.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 450.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Drilling Fluid Waste 7,180.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Drilling Fluid Waste 700.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Other Oil & Gas Wastes 45.59 Tons LANDFILL 100172
2019 EQT PROD CO Other Oil & Gas Wastes 113.00 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 82.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 7.02 Tons LANDFILL 100419
2019 EQT PROD CO Drilling Fluid Waste 45.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 EQT PROD CO Drilling Fluid Waste 120.00 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Synthetic Liner Materials 33.17 Tons LANDFILL 100419
2019 EQT PROD CO Drill Cuttings 1,631.28 Tons LANDFILL 100172
2019 EQT PROD CO Drill Cuttings 22.19 Tons LANDFILL 100419

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2586328 Primary Facility 2017-04-17 Routine/Complete Inspection No Violations Noted On 4/17/2017, the Department performed an inspection of the EQT JT Farm well pad site. The site is located in East Finley Twp., Washington Co. The inspection was performed as a routine inspection during construction of the site.

The Act 9 site ID sign was in place and legible.

The access road to the well pad has been constructed. The operator has completed construction of the southeast section of the well pad and fill slope. During the inspection the operator was in process of constructing the toe key for the northwest well pad fill slope.

All perimeter E&S BMPs have been installed for the access road and well pad which are functional. The trees have been cleared for the entire site and the operator was in process of installing E&S BMPs for the AST pad and freshwater impoundment.

5 wells have been permitted to be drilled on site.

2608256 Primary Facility 2017-06-26 Drilling/Alteration No Violations Noted Operator reports 30" hole drilled to 40' with 26" conductor grouted to surface through 1" tubing. Site inspection shows no apparent viloation. NOVIO
2610391 Primary Facility 2017-07-03 Drilling/Alteration No Violations Noted Operator reports 18 5/8" csg set to 530' with cement circulated to surface. Site inspection shows no apparent viloation. NOVIO
2615067 Primary Facility 2017-06-01 Preoperation Inspection No Violations Noted On June 1, 2017, the Department performed an inspection of the EQT JT Farm well pad site. The site is located in East Finley Twp., Washington Co. The inspection was performed as a pre-operational inspection during construction of the site before the commencement of drilling.

The Act 9 site ID sign was in place and legible.

The access road to the well pad has been constructed. The operator has completed construction of the well pad and fill slope. During the inspection the operator was in process of stoning the pad in preparation of drilling on site. The operator has started construction of the freshwater impoundment for the site.

All perimeter E&S BMPs have been installed for the site and are functional.

5 wells have been permitted to be drilled on site.

2618243 Primary Facility 2017-07-08 Routine/Complete Inspection No Violations Noted Operator reports 9 5/8" csg set to 3043' with 37 Bbls cement returns. NOVIO
2680091 Primary Facility 2018-01-03 Routine/Complete Inspection No Violations Noted On January 3, 2018, the Department performed an inspection of the EQT JT Farm well pad site. The site is located in East Finley Twp., Washington Co. The inspection was a routine inspection before resumption of drilling activity on the site.

The site was covered with snow at time of inspection. The access road and well pad are in good condition. The operator has begun filing the freshwater impoundment on site. PCSM structures have not been installed, and all E&S BMPs have been installed and are functional.

The operator has permitted 12 wells on site and has drilled the vertical section for five of these wells. The operator plans to revisit the site spud the remaining seven permitted wells for the site and complete drilling operations to TD for all 12 permitted wells for the site.

5 Spud wells with vertical section of well drilled. JT Farm 593014 JT Farm 593015 JT Farm 593016 JT Farm 593017 JT Farm 593018

7 permitted but not drilled wells. JT Farm 593019 JT Farm 593020 JT Farm 593021 JT Farm 593022

2833311 Primary Facility 2019-01-10 Routine/Complete Inspection No Violations Noted On January 10, 2019, the Department performed an inspection of the EQT JT Farm well pad site. The site is located in East Finley Twp., Washington Co. The inspection was related to a request by the operator for a minor modification to the ESCGP2 permit.

The operator has requested a minor modification to the ESCGP2 permit to construct a fresh water pipeline, and gathering pipeline within the well pad LOD to connect to the Equitrans NIPI-S002 pipeline site. The minor modification was reviewed and approved by the Department in the field. The modified ESCGP2, E&S plans were redlined by the Department and left in the mailbox on site as the official plans for the site.

The well pad and access road where in good condition.

The operator plans to return to the site in the near future to complete drilling operations for the 12 permitted wells on the site. 5 wells have the vertical sections for those wells completed and are on inactive status at this current time.

For data sources see[7]

References