Well ID: 37-125-27902 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36125,"lon":-80.232722,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Cecil Township | |
Operator Name: UNKNOWN OPR | |
Well Pad ID: | |
Farm/Lease Name: | |
License Status: | |
Spud Date: | |
Permit Date: | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Undetermined | |
Conservation: No | |
Latitude: 40.361250 | |
Longitude: -80.232722 |
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2488804 | Primary Facility | 2016-05-27 | Routine/Partial Inspection | No Adverse Event or Action Reported | Site is being logged in preparation for beltway construction. Loggers dropped treetops onto wellsite, but wellhead is not damaged. The bend in the wellhead was there prior to logging. Well was intermittently venting gas in small amounts at time of inspection. |
2498171 | Primary Facility | 2016-06-14 | Routine/Partial Inspection | No Adverse Event or Action Reported | Visited site to see if any additional logging had taken place around the well since the 5/27/16 visit: none noted. |
2520216 | Primary Facility | 2016-09-19 | Routine/Partial Inspection | No Adverse Event or Action Reported | Wellhead and surrounding treetop debris has been highlighted with ribbons and wellhead painted fluorescent orange to mark presence of wellhead for future work in area. Wellhead is intact and venting in cycles of undetermined time. Well vented gas strongly while at site, then faded to nearly nothing. This has been the same venting pattern as in earlier visits. |
2598205 | Primary Facility | 2015-12-10 | Routine/Complete Inspection | No Viols - Permanently Shut Down | Visited site w/ RETTEW representative as part of the Southern Beltway Project. Well is along benched area on wooded slope ~ 50 feet below roadway. Wellhead is 6 1/4" casing, w/ bent 5" casing on a casing clamp, tubing and rods (?). Tubing head side port w/ tubing, tee & elbow open to atmosphere and intemittently venting a noticeable amount of gas. Dual 6" casings, open 18"-24" are located ~10 feet from wellhead (flagged stake, left background in photo) may have been base of pumpjack. Additional 6" casing, 3 feet high, ~15 feet from wellhead (right background in photo) may have been associated w/ pumpjack (?).
No gas venting from this casing or dual casings. Visited site w/ Brandon Novogradac (RETTEW) as part of the Southern Beltway Project. Well is along benched area on wooded slope ~ 50 feet below roadway. Wellhead is 6 1/4" casing, w/ bent 5" casing on a casing clamp, tubing and rods (?). Tubing head side port w/ tubing, tee & elobow open to atmosphere and intemittently venting a noticeable amount of gas. Dual 6" casings, open 18"-24" are located ~10 feet from wellhead (flagged stake, left background in photo) may have been base of pumpjack (center background in photo). Additional 6" casing, 3 feet high, ~15 feet from wellhead (right background in photo) may have been associated w/ pumpjack (?). No gas venting from this casing or dual casings. |
2598208 | Primary Facility | 2017-03-21 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Fay has equipment on site, preparing to building pad for rig mob. |
2598213 | Primary Facility | 2017-03-22 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Fay has dozer working to build pad at the site. |
2598218 | Primary Facility | 2017-03-27 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Yost has rig & doghouse on sit, mast is not up yet. |
2598219 | Primary Facility | 2017-03-28 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost has first joint of tubing pulled, but having issues breaking connection with the power tongs, so will resort to cutting. Tubing and rods (wooden) are both pulling. |
2598220 | Primary Facility | 2017-03-29 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost pulling wooden rods and tubing. |
2598223 | Primary Facility | 2017-03-30 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost pulled all tubing and rods, including the pump, TIMCO logged hole, tagged btm @ 2293 feet. Bottom of 5" casing @ 1445 feet. |
2598224 | Primary Facility | 2017-04-05 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | After cutting the 5" casing @ 1400 feet and 1350 feet and then cut again @ 397 feet, attempting unsuccessfully to pull after each cut, the casing was perforated every 50 feet from1300 feet to 450 feet the prior day. The casing was cut @ 352 feet and pulled free. Prior to inspection the next cement plug was set to ~ 400 feet. During inspection, Yost successfully started pulling 5" casing. |
2598226 | Primary Facility | 2017-04-06 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | After Yost pulled 352 feet of 5" casing, TIMCO ran ccl on the 6 5/8" casing, then perfed every 50 feet (perfed at 170' & 130' to avoid mine @~150'. |
For data sources see[4]