X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27664

Well Details

Well ID: 37-125-27664
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Somerset Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152510
Farm/Lease Name: RUMPELSTILTSKIN
License Status: Active
Spud Date: 2015-05-11
Permit Date: 2015-05-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.081978
Longitude: -80.043789

For data sources see[1][2][3]

Well History

Date Event
2015-05-05 New Permit Application
2015-05-07 Performed Spud Operation
2015-05-26 Drilling Completion
2015-07-10 Deviated
2015-07-10 Newly Drilled
2015-09-16 Drilling Completion
2015-12-31 Perforation
2016-01-01 Perforation
2016-01-01 Performed Stage 1 of Stimulation
2016-01-01 Performed Stage 2 of Stimulation
2016-01-01 Performed Stage 3 of Stimulation
2016-01-01 Performed Stage 4 of Stimulation
2016-01-02 Perforation
2016-01-02 Performed Stage 5 of Stimulation
2016-01-02 Performed Stage 6 of Stimulation
2016-01-02 Performed Stage 7 of Stimulation
2016-01-03 Perforation
2016-01-03 Performed Stage 10 of Stimulation
2016-01-03 Performed Stage 11 of Stimulation
2016-01-03 Performed Stage 8 of Stimulation
2016-01-03 Performed Stage 9 of Stimulation
2016-01-04 Perforation
2016-01-04 Performed Stage 12 of Stimulation
2016-01-04 Performed Stage 13 of Stimulation
2016-01-05 Perforation
2016-01-05 Performed Stage 14 of Stimulation
2016-01-05 Performed Stage 15 of Stimulation
2016-01-06 Perforation
2016-01-06 Performed Stage 16 of Stimulation
2016-01-06 Performed Stage 17 of Stimulation
2016-01-06 Performed Stage 18 of Stimulation
2016-01-06 Performed Stage 19 of Stimulation
2016-01-07 Perforation
2016-01-07 Performed Stage 20 of Stimulation
2016-01-07 Performed Stage 21 of Stimulation
2016-01-07 Performed Stage 22 of Stimulation
2016-01-07 Performed Stage 23 of Stimulation
2016-01-08 Perforation
2016-01-08 Performed Stage 24 of Stimulation
2016-01-08 Performed Stage 25 of Stimulation
2016-01-08 Performed Stage 26 of Stimulation
2016-01-08 Performed Stage 27 of Stimulation
2016-01-09 Perforation
2016-01-09 Performed Stage 28 of Stimulation
2016-01-09 Performed Stage 29 of Stimulation
2016-01-09 Performed Stage 30 of Stimulation
2016-01-09 Performed Stage 31 of Stimulation
2016-01-10 Perforation
2016-01-10 Performed Stage 32 of Stimulation
2016-01-10 Performed Stage 33 of Stimulation
2016-01-10 Performed Stage 34 of Stimulation
2016-01-10 Performed Stage 35 of Stimulation
2016-01-10 Performed Stage 36 of Stimulation
2016-01-11 Perforation
2016-01-11 Performed Stage 37 of Stimulation
2016-01-11 Performed Stage 38 of Stimulation
2016-01-11 Performed Stage 39 of Stimulation
2016-01-12 Perforation
2016-01-12 Performed Stage 40 of Stimulation
2016-01-12 Performed Stage 41 of Stimulation
2016-01-12 Performed Stage 42 of Stimulation
2016-01-12 Performed Stage 43 of Stimulation
2016-01-13 Perforation
2016-01-13 Performed Stage 44 of Stimulation
2016-01-13 Performed Stage 45 of Stimulation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-01-01 2016-01-13 7,878 14,554,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WIC-641L WFT Iron Control Citric acid 77-92-9 60 0.0019269 2657.32
40/70 Premium WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 2.31419 3,191,420.0
WAI-251LC WFT Inhibitor 1-Octanol 111-87-5 5 0.00002752 37.949
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00005504 75.898
Ethylene Glycol 111-76-2 40 0.000220143 303.591
1-Decanol 112-30-1 5 0.00002752 37.949
2-Butoxyethanol 111-76-2 10 0.00005504 75.898
Triethylphosphate 78-40-0 5 0.00002752 37.949
Ethoxylated Nonylphenol 68412-54-4 5 0.00002752 37.949
Isopropyl Alcohol 67-63-0 5 0.00002752 37.949
N,N-Dimethylformamide 68-12-2 20 0.000110071 151.796
15% HCL WFT Acid Hydrochloric Acid 7647-01-0 15 0.0408795 56375.5
Water Rice Energy Carrier / Base Fluid Carrier / Base Fluid - Water 7732-18-5 100 88.0698 121,454,000.0
WSI-648L WFT Inhibitor Methanol 67-56-1 3 0.00168149 2318.88
Ammonium Chloride 12125-02-9 20 0.0112099 15459.2
Ammonia 7664-41-7 25 0.0140124 19324
Phosphonic Acid Proprietary 50 0.0280248 38648
Other Chemicals Cinnamaldehyde 104-55-2 0 0 0
Alcohol Ethoxylate Surfactants Proprietary 0 0 0
Cationic Polyacrylamide copolymer Proprietary 0 0 0
Acetaldehyde 75-07-0 0 0 0
Ethylene Oxide 75-21-8 0 0 0
Dioxane 123-91-1 0 0 0
100 Mesh WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 9.20686 12,696,900.0
WFR-66LC WFT Friction Reducers Sodium Chloride 7647-14-5 20 0.0105597 14562.6
Petroleum distillates, hydrotreated light 64742-47-8 40 0.0211195 29125.1
Bio- WFT Bactericide Polyethylene Glycol 25322-68-3 65 0.0106564 14695.8
Sodium Bromide 7647-15-6 1.5 0.000245916 339.134
Dibromoacetonitrile 3252-43-5 0.5 0.00008197 113.045
2,2-dibromo-3-nitriloproppionamide 10222-01-2 5 0.00081972 1130.45
Aqucar DB 5 WFT Biocide Dibromoacetonitrile 3252-43-5 0.5 0.00003829 52.807
Polyethylene glycol 25322-68-3 75 0.0057438 7921.07
Sodium Bromide 7647-15-6 1.5 0.000114876 158.421
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5 0.00038292 528.072

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-01-01 1 Silica Sand 12,560,310 9,048 9,474
2016-01-01 2 Silica Sand 12,560,310 9,194 9,352
2016-01-01 3 Silica Sand 12,560,310 9,113 9,351
2016-01-01 4 Silica Sand 12,560,310 9,233 9,391
2016-01-02 5 Silica Sand 12,560,310 9,230 9,380
2016-01-02 6 Silica Sand 12,560,310 9,167 9,356
2016-01-02 7 Silica Sand 12,560,310 9,221 9,337
2016-01-03 8 Silica Sand 12,560,310 9,193 9,366
2016-01-03 9 Silica Sand 12,560,310 9,196 9,381
2016-01-03 10 Silica Sand 12,560,310 9,097 9,313
2016-01-03 11 Silica Sand 12,560,310 8,849 9,403
2016-01-04 12 Silica Sand 12,560,310 9,034 9,351
2016-01-04 13 Silica Sand 12,560,310 9,200 9,398
2016-01-05 14 Silica Sand 12,560,310 9,533 9,348
2016-01-05 15 Silica Sand 12,560,310 8,902 9,363
2016-01-06 16 Silica Sand 12,560,310 9,132 9,416
2016-01-06 17 Silica Sand 12,560,310 9,106 9,394
2016-01-06 18 Silica Sand 12,560,310 9,170 9,384
2016-01-06 19 Silica Sand 12,560,310 9,212 9,437
2016-01-07 20 Silica Sand 12,560,310 9,194 9,387
2016-01-07 21 Silica Sand 12,560,310 8,957 9,352
2016-01-07 22 Silica Sand 12,560,310 8,584 9,373
2016-01-07 23 Silica Sand 12,560,310 9,165 9,359
2016-01-08 24 Silica Sand 12,560,310 9,246 9,395
2016-01-08 25 Silica Sand 12,560,310 9,170 9,348
2016-01-08 26 Silica Sand 12,560,310 8,668 9,381
2016-01-08 27 Silica Sand 12,560,310 9,039 9,427
2016-01-09 28 Silica Sand 12,560,310 8,923 9,373
2016-01-09 29 Silica Sand 12,560,310 8,851 9,319
2016-01-09 30 Silica Sand 12,560,310 9,019 9,319
2016-01-09 31 Silica Sand 12,560,310 9,080 9,363
2016-01-10 32 Silica Sand 12,560,310 8,968 9,366
2016-01-10 33 Silica Sand 12,560,310 8,992 9,366
2016-01-10 34 Silica Sand 12,560,310 8,524 9,330
2016-01-10 35 Silica Sand 12,560,310 8,870 9,373
2016-01-10 36 Silica Sand 12,560,310 9,035 9,391
2016-01-11 37 Silica Sand 12,560,310 8,742 9,384
2016-01-11 38 Silica Sand 12,560,310 8,539 9,008
2016-01-11 39 Silica Sand 12,560,310 8,049 8,658
2016-01-12 40 Silica Sand 12,560,310 8,517 9,166
2016-01-12 41 Silica Sand 12,560,310 8,224 9,233
2016-01-12 42 Silica Sand 12,560,310 8,713 9,165
2016-01-12 43 Silica Sand 12,560,310 8,674 9,315
2016-01-13 44 Silica Sand 12,560,310 8,259 9,058
2016-01-13 45 Silica Sand 12,560,310 8,227 9,022

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2016 RICE DRILLING B LLC 2,470,485.14 312 0.00 0 0.00 0
2017 RICE DRILLING B LLC 1,442,551.91 365 0.00 0 0.00 0
2018 RICE DRILLING B LLC 904,191.00 362 0.00 0 0.00 0
2019 RICE DRILLING B LLC 1,000,887.00 356 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RICE DRILLING B LLC Drilling Fluid Waste 43.75 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Drilling Fluid Waste 1,569.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Drill Cuttings 688.13 Tons LANDFILL 06-08438
2015 RICE DRILLING B LLC Produced Fluid 2,143.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Drill Cuttings 196.77 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015 RICE DRILLING B LLC Drill Cuttings 233.23 Tons LANDFILL 100663
2015 RICE DRILLING B LLC Produced Fluid 1,094.50 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Drill Cuttings 141.41 Tons LANDFILL 100172
2016 RICE DRILLING B LLC Fracturing Fluid Waste 16.11 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 46.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 288.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 3,496.83 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Fracturing Fluid Waste 27,050.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Produced Fluid 742.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 433.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Fracturing Fluid Waste 432.38 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Filter Socks 0.04 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2016 RICE DRILLING B LLC Synthetic Liner Materials 14.30 Tons LANDFILL 100663
2016 RICE DRILLING B LLC Fracturing Fluid Waste 479.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Fracturing Fluid Waste 61.39 Tons LANDFILL 100592
2016 RICE DRILLING B LLC Waste Water Treatment Sludge 7.38 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 22.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 834.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 25,250.40 Bbl REUSE OTHER THAN ROAD SPREADING
2017 RICE DRILLING B LLC Produced Fluid 27.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 75.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 84.83 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 2,249.23 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 1,670.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Filter Socks 0.13 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Waste Water Treatment Sludge 3.94 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2018 RICE DRILLING B LLC Produced Fluid 745.27 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 13.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 133.77 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 108.50 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 257.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 51.04 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Produced Fluid 41.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 305.00 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 1,019.21 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 79.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2368670 Primary Facility 2015-05-11 Drilling/Alteration No Violations Noted Butch’s Rat Hole Services auger rig
2368671 Primary Facility 2015-05-11 Drilling/Alteration No Violations Noted Well Services Group Rig #3
2369234 Primary Facility 2015-05-13 Drilling/Alteration No Violations Noted Well Services Group Rig #3
2372472 Primary Facility 2015-05-22 Drilling/Alteration No Violations Noted Well Services Group Rig #3
2376299 Primary Facility 2015-06-04 Drilling/Alteration No Violations Noted Well Services Group Rig #3
2378981 Primary Facility 2015-06-15 Routine/Complete Inspection No Violations Noted Violations linked to the site inspection #2378967
2407581 Primary Facility 2015-09-15 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #349
2409793 Primary Facility 2015-09-24 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #349
2528999 Primary Facility 2016-09-07 Complaint Inspection No Violations Noted On 9/7/2016, I performed a complaint inspection at the Rumpelstiltskin site in response to complaint ID 322302 accompanied by Rice Representative Jonathon Davis and made the following observations:

•Per the Mr. Davis the PCSM construction on the site was temporarily obstructed by larger than estimated amounts of earth needing excavated and hitting bedrock in unexpected areas. Per Mr. Davis a major modification to the permit was being pursued to remediate the situation. •Multiple large areas of the site were unstabilized at the time of inspection; perimeter controls were all in place and appeared functional at the time of inspection. •Necessary site plans and permits were present in the mail box at time of inspection.

2530631 Primary Facility 2016-09-08 Complaint Inspection No Violations Noted On 9/8/16, I performed a complaint inspection associated with the Rumpelstiltskin site in response to complaint ID 322302 and made the following observations:

•I met with Moody’s Water Service at the complainant’s home to collect water samples for 946 analyses. As the complainant was already on supplied water with the well disconnected Moody’s equipment was used to collect and split samples. •Water samples were taken directly from the well after flushing for 10 minutes. •The complainant’s well is located within 1000 feet of the nearest well on site; the wells on the site have initial production reported for February or March of 2016.

2530979 Primary Facility 2016-10-18 Administrative/File Review No Violations Noted On 10/18/16, I performed an administrative inspection associated with the Rumpelstiltskin site in response to complaint ID 322302 and made the following observations:

•WQS Supervisor John Carson and I reviewed the laboratory results for the samples taken 9/8/16 as well as other situational information and found that, due to changes in water quality from predrill samples and the status of the site being within presumption both in time and distance, an impact to the complainant’s water supply is presumed. •It is noted that the operator had already provided an alternative water supply at the time of the 9/8/16 inspection at the request of the complainant.

2746799 Primary Facility 2018-06-28 Routine/Complete Inspection No Violations Noted This well has been completed and is producing. Wells and site appear to be well maintained.
2759639 Primary Facility 2018-07-31 Routine/Partial Inspection No Violations Noted On 7/31/18 a routine partial inspection of the Rumpelstiltskin site was conducted in response to an operator request. The following was observed:

>>EQT Representative Jason Tyler requested a meeting to review plans to remove multiple sections of site CFS at landowner request to allow livestock access. Site vegetation suggests that CFS should be removed independent of landowner request.

>>Site appeared in generally good condition with no noted issues.

2761059 Primary Facility 2018-03-30 Incident- Response to Accident or Event In Compliance with Policy On 3/30/18 an incident inspection was conducted of the Rumpelstiltskin Well Pad in response to a spill reported on 3/28/18 (CTS ID: 333271). The following was observed:

>>The operator reported a spill of less than 20 gallons of glycol.

>>Site inspection found that cleanup had been completed with no indication of residual impact or contamination.

>>Four wells were noted in operation at the time of inspection.

>>Site BMPs showed signs of recent maintenance and fresh stabilization. BMPs were functional but close to capacity.

2856904 Primary Facility 2019-03-21 Routine/Complete Inspection No Violations Noted Act 9 site identification sign installed. Well drilled and equipped for production. Well tag present. Well apparatus,brine tanks and gas production unit appears to be in sound condition.

For data sources see[9]

References