37-125-24213

Well Details

Well ID: 37-125-24213
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Amwell Township
Operator Name: RICE DRILLING B LLC
Well Pad ID:
Farm/Lease Name: HULK 3H
License Status:
Spud Date:
Permit Date: 2010-07-13
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.088264
Longitude: -80.185953

For data sources see[1][2][3]

Well History

Date Event
2010-07-13 New Permit Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2011 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1915534 Primary Facility 2010-09-08 Complaint Inspection No Violations Noted
1933389 Primary Facility 2010-09-21 Routine/Complete Inspection No Violations Noted
1995789 Primary Facility 2011-05-18 Routine/Partial Inspection Outstanding Violations - No Viols Req'd On May 18, 2011, I stopped at the progress at Rice¿s Hulk site. Very little work was done on site, again because of the wet weather. I noticed the pipeline area was cleared but work had not yet started. I also noticed the water in the freshwater impoundment was nearly above the 2-foot freeboard allowed.
1995814 Primary Facility 2011-06-09 Routine/Partial Inspection Outstanding Violations - No Viols Req'd On June 9, 2011, I stopped to check on the progress of the 10 Mile Creek to Hulk section of pipeline.
1995834 Primary Facility 2011-06-30 Routine/Partial Inspection Outstanding Violations - No Viols Req'd On June 30, 2011 I stopped at the Hulk pad to gauge progress. The original stream crossing was repaired but the sediment fence near the 10 Mile Creek withdrawal area was still down.
1995886 Primary Facility 2011-07-29 Routine/Partial Inspection Outstanding Violations - No Viols Req'd Inspected the site with Water Quality specialist Supervisor, Vince Yantko. Some progress on original problems but others need addressed. There appears to be no E&S plan for the Hulk fresh water impoundment to Hulk pad part of the pipeline. We talked with Dave Miller and Well Tech personnel.
1995939 Primary Facility 2011-08-03 Routine/Partial Inspection Outstanding Violations - No Viols Req'd I looked for the Hulk Impoundment to Hulk Wellpad plans at both the Captain Planet Crossing and at the 10 Mile Creek Crossing and could find none. My calls to Mr. Miller make me think that they do not exist. This is an additional violation.
2002680 Primary Facility 2011-08-17 Routine/Partial Inspection Outstanding Violations - No Viols Req'd Checked crossings. Not operating at inspection.
2002694 Primary Facility 2011-08-25 Routine/Partial Inspection Outstanding Violations - No Viols Req'd Checked crossings. Still problems
2002702 Primary Facility 2011-08-31 Routine/Partial Inspection Outstanding Violations - No Viols Req'd I checked the area with DEP Biologist, Bill McCune. Bill confirmed that stream crossings had occurred and that a wetland was encroached. The drilling company (East Coast Underground) was on-site trying to pull a plastic pipe through the hole they drilled.
2002712 Primary Facility 2011-09-14 Routine/Partial Inspection Outstanding Violations - No Viols Req'd Violation for 5 stream crossings and 1 wetland
2033140 Primary Facility 2011-12-13 Routine/Complete Inspection Outstanding Violations - No Viols Req'd E&S problems outstanding.
2033302 Primary Facility 2012-01-11 Routine/Complete Inspection No Violations Noted On January 11, 2012, I stopped at the Hulk pad to check on the progress Rice made toward addressing the problems I discovered on December 13, 2011.
2364073 Primary Facility 2015-01-14 Routine/Complete Inspection No Violations Noted Inspection performed to check the progress on the landslide along the slope downgradient of the SE corner of the pad. Three french drains have been installed and all re-work has been performed back to grade. Vegetation has been re-established in some areas however some areas may need to be re-seeded. All proper records were on-site; well tags and signage in place. No violations noted.

For data sources see[6]