X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-23362

Well Details

Well ID: 37-125-23362
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Robinson Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: DANIELS 1
License Status:
Spud Date:
Permit Date: 2008-10-31
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.409216
Longitude: -80.310248

For data sources see[1][2][3]

Well History

Date Event
2008-10-31 New Permit Application
2008-11-06 Performed Spud Operation
2008-11-11 Drilling Completion
2009-04-29 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2009 PENNECO OIL CO INC 7555.00 213 29.00 213 0.00 0
2010 PENNECO OIL CO INC 17,652.00 334 16.45 334 0.00 0
2011 PENNECO OIL CO INC 18,792.00 365 7.00 365 0.00 0
2012 PENNECO OIL CO INC 18,720.00 366 0.00 0 0.00 0
2013 PENNECO OIL CO INC 16,262.00 365 0.00 0 0.00 0
2014 PENNECO OIL CO INC 14,686.00 365 11.45 365 0.00 0
2015 PENNECO OIL CO INC 14,753.00 365 0.00 0 0.00 0
2016 PENNECO OIL CO INC 8,046.00 182 0.00 0 0.00 0
2017 PENNECO OIL CO INC 924.00 335 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 PENNECO OIL CO INC Drilling 400.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009 PENNECO OIL CO INC Brine 20.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2010 PENNECO OIL CO INC Produced Fluid 77.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PENNECO OIL CO INC Produced Fluid 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Produced Fluid 38.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012 PENNECO OIL CO INC Produced Fluid 77.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 PENNECO OIL CO INC Produced Fluid 86.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2013 PENNECO OIL CO INC Produced Fluid 86 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 60.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Produced Fluid 60 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 84.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2015 PENNECO OIL CO INC Produced Fluid 84 Bbl CENT WASTE TRT FAC NPDES PA0095443

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2598164 Primary Facility 2015-12-17 Routine/Complete Inspection No Violations Noted Visited site w/ representative of RETTEW as part of the Southern Beltway Project. Wellhead is intact and not leaking; tubinghead w/ 2 1/2" tubing. Well compressor operating, tank fluid level good. Location is flat and graveled just off access road. (Natural well completed 2008)
2598171 Primary Facility 2017-03-22 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Penneco removed all production equipment. Pad is ready for rig mob.
2598175 Primary Facility 2017-04-12 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Met w/ Yost personnel at site. Rig scheduled to mob in near future.
2598180 Primary Facility 2017-04-17 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Yost is blowing down the well to prepare for site preparation and rig mob.
2598189 Primary Facility 2017-04-18 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost mobilized rig, doghouse, w/ more to arrive. Had to use rig mats, due to spongy location.
2598192 Primary Facility 2017-04-24 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost in process of TIH w/ tubing to tag TOC of bottom hole plug that was set.
2598195 Primary Facility 2017-04-25 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost loaded hole, then rigged up TIMCO, who tagged TOC @1031 feet. Bond logs run on 7" casing seem to indicate poor bond, so Yost will attempt to pull casing after getting sub for 7" casing. (Were unable to pull casing, so will perf before cementing to surface.)
2598198 Primary Facility 2017-04-27 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost is rigged down after plugging well to surface.

For data sources see[7]

References