X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-22340

Well Details

Well ID: 37-125-22340
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Carroll Township
Operator Name: PATRIOT EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: D SPESAK 3
License Status: PLUGGED & ABANDONED
Spud Date:
Permit Date: 2006-04-18
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.162167
Longitude: -79.938556

For data sources see[1][2][3]

Well History

Date Event
2006-04-18 New Permit Application
2006-09-15 Performed Spud Operation
2006-09-21 Drilling Completion
2007-03-30 NEWLY DRILLED
2015-07-09 Drilling Completion
2016-06-28 FULLY PLUGGED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 PATRIOT EXPLORATION CORP 1251.00 30 0.00 0 0.00 0
2007 PATRIOT EXPLORATION CORP 20165.00 365 0.00 0 0.00 0
2008 PATRIOT EXPLORATION CORP 9690.00 365 0.00 0 0.00 0
2009 PATRIOT EXPLORATION CORP 4901.00 365 0.00 0 0.00 0
2010 PATRIOT EXPLORATION CORP 1,119.00 365 0.00 0 0.00 0
2011 PATRIOT EXPLORATION CORP 908.00 365 0.00 0 0.00 0
2012 PATRIOT EXPLORATION CORP 843.00 365 0.00 0 0.00 0
2013 PATRIOT EXPLORATION CORP 653.00 365 0.00 0 0.00 0
2014 PATRIOT EXPLORATION CORP 525.00 365 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1598065 Primary Facility 2007-02-01 Routine/Complete Inspection No Violations Noted Well is established, pits closed, restored to grade at benches - this and two other field wells in open pasture area.
1610310 Primary Facility 2006-09-19 Drilling/Alteration No Violations Noted E&S OK.
1704985 Primary Facility 2008-04-11 Site Restoration No Violations Noted well in production tag ok, cover ok, access stable
2420043 Primary Facility 2015-07-09 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Rig finished spotting final cement plug and began pulling cement string.

For data sources see[6]

References