If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-22201 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.083302,"lon":-79.948432,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: West Pike Run Township | |
Operator Name: PATRIOT EXPLORATION CORP | |
Well Pad ID: | |
Farm/Lease Name: WEINZEN 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2005-02-18 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.083302 | |
Longitude: -79.948432 |
Date | Event |
---|---|
2005-02-18 | New Permit Application |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2005 | PATRIOT EXPLORATION CORP | 5,034.00 | 120 | 0.00 | 0 | 0.00 | 0 |
2006 | PATRIOT EXPLORATION CORP | 12,386.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2007 | PATRIOT EXPLORATION CORP | 13,405.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | PATRIOT EXPLORATION CORP | 19,327.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2009 | PATRIOT EXPLORATION CORP | 10,110.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PATRIOT EXPLORATION CORP | 7,397.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PATRIOT EXPLORATION CORP | 5,201.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | PATRIOT EXPLORATION CORP | 4,083.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | PATRIOT EXPLORATION CORP | 5,892.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PATRIOT EXPLORATION CORP | 5,242.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PATRIOT EXPLORATION CORP | 6,226.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PATRIOT EXPLORATION CORP | 1,121.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | PATRIOT EXPLORATION CORP | 1,931.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | PATRIOT EXPLORATION CORP | 3,507.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PATRIOT EXPLORATION CORP | Produced Fluid | 60.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1450061 | Primary Facility | 2005-05-21 | Routine/Complete Inspection | No Violations Noted | ID/plan at gate, cattle knocked down silt fence, are wandering on bench also around the rig. Sump lined cuttings within, no animals in sump, freeboard ok, topsoil stockpiled. |
For data sources see[7]