If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-125-01576 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.148972,"lon":-80.397917,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Washington | |
| Municipality: Blaine Township | |
| Operator Name: DALLAS ENERGY LLC | |
| Well Pad ID: | |
| Farm/Lease Name: L. CARSON | |
| License Status: Plugged and Abandoned | |
| Spud Date: | |
| Permit Date: | |
| Well Type: UNDETERMINED | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.148972 | |
| Longitude: -80.397917 |
| Date | Event |
|---|---|
| 1890-04-08 | Drilling Completion |
| 1987-04-17 | Old Well |
| 2017-07-18 | Begin Plugging |
| 2017-08-01 | Finished Plugging |
| 2019-05-03 | Fully Plugged |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 1993 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 1996 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 1997 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 1998 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 1999 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2000 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2001 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2002 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2003 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2005 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2006 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2007 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2008 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2010 | EAST RESOURCES MGMT LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2011 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2012 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2013 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2014 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2015 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2016 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2017 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2614894 | Primary Facility | 2017-06-13 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Visited site before ConServ moved rig on well. Well is along road to other wells, so well will be plugged after the other wells are plugged. |
| 2614896 | Primary Facility | 2017-07-12 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ rig is finished plugging on Nobel 13, but move has been delayed due to recent heavy rains. |
| 2616085 | Primary Facility | 2017-07-17 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ is rigged up and ready to begin plugging operations. |
| 2617538 | Primary Facility | 2017-07-19 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ tagged TD @ 2573' (Drillers record: 2581'). Tripping in hole w/ cement string at time of inspection. |
| 2618703 | Primary Facility | 2017-07-24 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ pulled on 4 1/4" casing to try to unseat packer. Unable to unseat after repeated tries, so cut first collar above packer @ ~1400'. Casing pulled free, so prepared to pull casing. |
| 2621292 | Primary Facility | 2017-07-27 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | No activity @ time of inspection. ConServ perforated 5 5/8" casing yesterday. They will run cement string later today. |
| 2621299 | Primary Facility | 2017-07-31 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ tagged TOC plug that was pumped yesterday @ 708', will spot next plug this afternoon. |
| 2621303 | Primary Facility | 2017-08-01 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ tagged TOC plug @ 150', will top off. |
| 2624369 | Primary Facility | 2017-08-04 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ plugged well to 5' below surface, SD. Rig is still on well, along w/ tanks, doghouse, etc. |
| 2624379 | Primary Facility | 2017-08-08 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ has some of equipment moved to Carson 5. Rig, doghouse & water tank still on site. |
| 2624382 | Primary Facility | 2017-08-09 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Rig has been move off location, water tank & doghouse remain. |
For data sources see[6]