If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-47675 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.889589,"lon":-79.334386,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Brokenstraw Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: PITT LEASE 2936 | |
License Status: | |
Spud Date: 2015-02-09 | |
Permit Date: 2014-08-12 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.889589 | |
Longitude: -79.334386 |
Date | Event |
---|---|
2014-08-12 | New Permit Application |
2015-02-09 | Performed Spud Operation |
2015-02-11 | Drilling Completion |
2015-07-17 | Perforation |
2015-07-17 | Performed Stage 1 of Stimulation |
2015-07-17 | Performed Stage 2 of Stimulation |
2015-07-17 | Performed Stage 3 of Stimulation |
2015-07-17 | Performed Stage 4 of Stimulation |
2015-07-17 | Performed Stage 5 of Stimulation |
2015-07-17 | Performed Stage 6 of Stimulation |
2015-07-17 | Performed Stage 7 of Stimulation |
2018-02-06 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-07-17 | 1 | Sand | 9,200 | 1,500 | 200 |
2015-07-17 | 2 | Sand | 9,200 | 1,500 | 1,400 |
2015-07-17 | 3 | Sand | 9,200 | 1,800 | 4,000 |
2015-07-17 | 4 | Sand | 9,200 | 2,100 | 4,000 |
2015-07-17 | 5 | Sand | 9,200 | 2,800 | 4,000 |
2015-07-17 | 6 | Sand | 9,200 | 2,800 | 4,000 |
2015-07-17 | 7 | Sand | 9,200 | 4,000 | 4,000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 104.26 | 152 | 102.92 | 152 | 2.45 | 152 |
2017 | CATALYST ENERGY INC | 138.00 | 365 | 189.81 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 10.00 | 365 | 51.84 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | CATALYST ENERGY INC | Produced Fluid | 19.17 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 53.33 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 344.84 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2017 | CATALYST ENERGY INC | Produced Fluid | 18.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | CATALYST ENERGY INC | Produced Fluid | 18.25 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 67.06 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 42.46 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 9.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 18.33 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2343284 | Primary Facility | 2015-02-10 | Routine/Complete Inspection | No Violations Noted | Conventional oil well in the process of being drilled. The operator was in the process of drilling top hole at the time of inspection. The crew was expecting to run surface casing today. Cuttings were being directed into a lined pit. The location was frozen and snow covered. No violations noted at this time |
2343607 | Primary Facility | 2015-02-12 | Routine/Complete Inspection | No Violations Noted | |
2395969 | Primary Facility | 2015-08-07 | Administrative/File Review | No Violations Noted | |
2495294 | Primary Facility | 2016-06-21 | Site Restoration | No Violations Noted | Conventional oil well completed and appears operational. The pit has been properly closed and there is adaquate vegetative cover. The site has been adaquately restored. No violations noted at this time.
Inspection ID# |
For data sources see[8]