If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-46148 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.381433,"lon":-79.771678,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: DEEP HOLLOW LOT 82 | |
| License Status: Active | |
| Spud Date: 2017-06-29 | |
| Permit Date: 2017-03-09 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.381433 | |
| Longitude: -79.771678 |
| Date | Event |
|---|---|
| 2017-03-09 | New Permit Application |
| 2017-06-29 | Performed Spud Operation |
| 2017-06-30 | Drilling Completion |
| 2017-08-07 | Performed Stage 1 of Stimulation |
| 2017-08-07 | Performed Stage 2 of Stimulation |
| 2017-08-07 | Performed Stage 3 of Stimulation |
| 2017-08-07 | Performed Stage 4 of Stimulation |
| 2017-08-07 | Performed Stage 5 of Stimulation |
| 2017-08-07 | Performed Stage 6 of Stimulation |
| 2019-06-03 | Newly Drilled |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2017-08-07 | 1 | Sand | 26,964 | 1,250 | 1,600 |
| 2017-08-07 | 2 | Sand | 26,964 | 1,400 | 2,600 |
| 2017-08-07 | 3 | Sand | 26,964 | 2,000 | 2,900 |
| 2017-08-07 | 4 | Sand | 26,964 | 2,000 | 3,300 |
| 2017-08-07 | 5 | Sand | 26,964 | 2,000 | 3,600 |
| 2017-08-07 | 6 | Sand | 26,964 | 1,900 | 4,000 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2017 | CATALYST ENERGY INC | 0.00 | 0 | 451.24 | 150 | 0.00 | 0 |
| 2018 | CATALYST ENERGY INC | 0.00 | 0 | 42.52 | 365 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2017 | CATALYST ENERGY INC | Produced Fluid | 31.43 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 9.29 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 140.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 1,768.95 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 274.29 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 52.86 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 523.57 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 167.86 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 1,017.38 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 15.71 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 62.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 1,102.86 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 358.57 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 31.43 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 198.57 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 94.29 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 125.71 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2600087 | Primary Facility | 2017-05-31 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The site has been graded and the lease is being pipelined. The drill pit has been dug for the well and is full of water. It appears the pit will not be suitable for encapsulation. |
| 2600089 | Primary Facility | 2017-05-31 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The site has been graded and the lease is being pipelined. The drill pit has been dug for the well and is full of water. It appears the pit will not be suitable for encapsulation. |
| 2603576 | Primary Facility | 2017-06-12 | Routine/Partial Inspection | No Violations Noted | |
| 2609254 | Primary Facility | 2017-06-29 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite, currently drilling the well. The pit is lined with greater than two feet of freeboard. The operator has a dusting approval. The site is stable, there are no E&S issues. |
| 2612018 | Primary Facility | 2017-07-03 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is drilled and the pit has been encapsulated. Currently the site is being graded. The access road is soft and rutted but sediment is not leaving the road way. Steps should be taken to stabilize the access road. |
| 2612056 | Primary Facility | 2017-06-30 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is drilled, rig is still on location. There is oil located in the pit that will need removed prior to encapsulation. The site is stable, there are no E&S issues. |
| 2613482 | Primary Facility | 2017-06-30 | Drilling/Alteration | No Violations Noted | |
| 2617963 | Primary Facility | 2017-07-24 | Administrative/File Review | No Violations Noted | |
| 2623617 | Primary Facility | 2017-08-07 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is completed, rods and tubing are installed. Flow back is in containment on location. The site is stable, there are no E&S issues. |
| 2701392 | Primary Facility | 2018-03-01 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is stable. There are no E&S issues. |
| 2815812 | Primary Facility | 2018-12-13 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues. |
For data sources see[8]