X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-121-45948

Well Details

Well ID: 37-121-45948
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: DEEP HOLLOW
License Status: Active
Spud Date: 2015-08-03
Permit Date: 2015-03-06
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.378519
Longitude: -79.775606

For data sources see[1][2][3]

Well History

Date Event
2015-03-06 New Permit Application
2015-08-03 Performed Spud Operation
2015-08-05 Drilling Completion
2016-07-18 Performed Stage 1 of Stimulation
2016-07-18 Performed Stage 2 of Stimulation
2016-07-18 Performed Stage 3 of Stimulation
2016-07-18 Performed Stage 4 of Stimulation
2016-07-18 Performed Stage 5 of Stimulation
2016-07-18 Performed Stage 6 of Stimulation
2016-07-18 Performed Stage 8 of Stimulation
2016-08-23 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-07-18 1 sand 31,962 1,150 2,570
2016-07-18 2 sand 31,962 1,800 1,200
2016-07-18 3 sand 31,962 1,900 1,400
2016-07-18 4 sand 31,962 2,200 3,600
2016-07-18 5 sand 31,962 2,200 3,500
2016-07-18 6 sand 31,962 2,400 4,600
7 skipped 31,962 0 0
2016-07-18 8 sand 31,962 2,200 1,300

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2016 CATALYST ENERGY INC 0.00 0 254.64 152 0.00 0
2017 CATALYST ENERGY INC 0.00 0 471.68 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 286.05 365 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CATALYST ENERGY INC Produced Fluid 16.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 16.67 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 16.67 Bbl ROAD SPREADING
2018 CATALYST ENERGY INC Produced Fluid 35.20 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 11.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 11.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 45.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 1,221.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 312.33 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 CATALYST ENERGY INC Produced Fluid 56.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE 001-A
2019 CATALYST ENERGY INC Produced Fluid 181.67 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2394927 Primary Facility 2015-08-03 Drilling/Alteration No Violations Noted
2395398 Primary Facility 2015-08-05 Drilling/Alteration No Violations Noted
2396510 Primary Facility 2015-08-05 Routine/Complete Inspection No Violations Noted
2412819 Primary Facility 2015-10-06 Administrative/File Review No Violations Noted
2416249 Primary Facility 2015-10-13 Routine/Complete Inspection No Violations Noted
2501316 Primary Facility 2016-07-15 Drilling/Alteration No Violations Noted
2501604 Primary Facility 2016-07-14 Routine/Complete Inspection No Violations Noted
2504211 Primary Facility 2016-07-26 Administrative/File Review No Violations Noted
2537886 Primary Facility 2016-11-17 Routine/Complete Inspection No Violations Noted
2778589 Primary Facility 2018-09-21 Site Restoration No Violations Noted Onsite for a well site restoration inspection. The well is producing, labeled, and the annulus is vented. Site is permanently stabilized, there are no E&S issues. The site is considered restored.

For data sources see[8]

References