If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-45926 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.381611,"lon":-79.778653,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: DEEP HOLLOW | |
| License Status: Active | |
| Spud Date: 2015-08-17 | |
| Permit Date: 2015-02-09 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.381611 | |
| Longitude: -79.778653 |
| Date | Event |
|---|---|
| 2015-02-09 | New Permit Application |
| 2015-08-17 | Performed Spud Operation |
| 2015-08-19 | Drilling Completion |
| 2016-07-24 | Perforation |
| 2016-07-25 | Performed Stage 1 of Stimulation |
| 2016-07-25 | Performed Stage 2 of Stimulation |
| 2016-07-25 | Performed Stage 3 of Stimulation |
| 2016-07-25 | Performed Stage 4 of Stimulation |
| 2016-07-25 | Performed Stage 5 of Stimulation |
| 2016-07-25 | Performed Stage 6 of Stimulation |
| 2016-08-15 | Newly Drilled |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2016-07-25 | 1 | Sand | 0 | 1,200 | 2,500 |
| 2016-07-25 | 2 | Sand | 0 | 1,450 | 4,000 |
| 2016-07-25 | 3 | Sand | 0 | 2,000 | 4,100 |
| 2016-07-25 | 4 | Sand | 0 | 1,800 | 2,400 |
| 2016-07-25 | 5 | Sand | 0 | 2,100 | 2,500 |
| 2016-07-25 | 6 | Sand | 0 | 2,500 | 3,200 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2015 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2016 | CATALYST ENERGY INC | 0.00 | 0 | 254.64 | 152 | 0.00 | 0 |
| 2017 | CATALYST ENERGY INC | 0.00 | 0 | 471.68 | 365 | 0.00 | 0 |
| 2018 | CATALYST ENERGY INC | 0.00 | 0 | 286.05 | 365 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 5.50 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 21.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 35.20 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 45.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 1,221.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 312.33 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 56.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 181.67 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2399096 | Primary Facility | 2015-08-13 | Routine/Complete Inspection | No Violations Noted | |
| 2400236 | Primary Facility | 2015-08-19 | Drilling/Alteration | No Violations Noted | |
| 2401058 | Primary Facility | 2015-08-19 | Routine/Complete Inspection | No Violations Noted | |
| 2401072 | Primary Facility | 2015-08-20 | Routine/Complete Inspection | No Violations Noted | |
| 2412811 | Primary Facility | 2015-10-05 | Administrative/File Review | No Violations Noted | |
| 2416226 | Primary Facility | 2015-10-13 | Routine/Complete Inspection | No Violations Noted | |
| 2506008 | Primary Facility | 2016-07-26 | Routine/Complete Inspection | No Violations Noted | |
| 2507412 | Primary Facility | 2016-08-04 | Administrative/File Review | No Violations Noted | |
| 2568501 | Primary Facility | 2017-03-07 | Site Restoration | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The well site is stable with greater than 70% vegetative cover. The access road has been graded and is in better shape. |
| 2644357 | Primary Facility | 2017-10-03 | Site Restoration | No Violations Noted | Onsite for a well site restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater thank 70% vegetative cover and is stable. There are no E&S issues. The site is considered restored. |
For data sources see[8]