X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-121-45914

Well Details

Well ID: 37-121-45914
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: BELDON 4941
License Status:
Spud Date:
Permit Date: 2015-01-20
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.372881
Longitude: -79.785542

For data sources see[1][2][3]

Well History

Date Event
2015-01-20 New Permit Application
2015-05-14 Performed Spud Operation
2015-05-20 Drilling Completion
2015-07-21 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CATALYST ENERGY INC 0.00 0 13.51 50 0.00 0
2016 CATALYST ENERGY INC 0.00 0 328.25 122 0.00 0
2017 CATALYST ENERGY INC 0.00 0 356.06 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 493.46 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CATALYST ENERGY INC Produced Fluid 133.4 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 CATALYST ENERGY INC Produced Fluid 133.40 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 2,745.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 12.22 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 2,745.00 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 36.67 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 22.00 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 22.00 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017 CATALYST ENERGY INC Produced Fluid 2,126.12 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 129.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 11.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 2,273.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 917.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 CATALYST ENERGY INC Produced Fluid 1,791.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 22.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 258.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 CATALYST ENERGY INC Produced Fluid 33.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE 001-A

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2351345 Primary Facility 2015-03-10 Routine/Complete Inspection No Violations Noted
2357914 Primary Facility 2015-04-01 Routine/Complete Inspection No Violations Noted
2370181 Primary Facility 2015-05-14 Routine/Complete Inspection No Violations Noted
2370287 Primary Facility 2015-05-15 Drilling/Alteration No Violations Noted
2372239 Primary Facility 2015-05-19 Routine/Complete Inspection No Violations Noted
2373347 Primary Facility 2015-05-27 Routine/Partial Inspection No Violations Noted
2374746 Primary Facility 2015-06-01 Routine/Partial Inspection No Violations Noted
2376569 Primary Facility 2015-06-08 Administrative/File Review No Violations Noted
2378520 Primary Facility 2015-06-11 Routine/Complete Inspection No Violations Noted
2381883 Primary Facility 2015-06-25 Administrative/File Review No Violations Noted
2386602 Primary Facility 2015-07-07 Routine/Complete Inspection No Violations Noted
2432178 Primary Facility 2015-12-07 Routine/Complete Inspection No Violations Noted
2608148 Primary Facility 2017-06-22 Routine/Partial Inspection No Violations Noted
2618886 Primary Facility 2017-07-19 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70 % vegetative cover and is stable. There are no E&S issues.
2701407 Primary Facility 2018-03-01 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable. There are no E&S issues.
2799395 Primary Facility 2018-11-06 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues.

For data sources see[7]

References