If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45860 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.606858,"lon":-79.554561,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Allegheny Township | |
Operator Name: PENNFIELD ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: SCHAFFNER 1718 | |
License Status: Plugged and Abandoned | |
Spud Date: 2015-02-25 | |
Permit Date: 2014-11-20 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.606858 | |
Longitude: -79.554561 |
Date | Event |
---|---|
2014-11-20 | New Permit Application |
2015-02-25 | Performed Spud Operation |
2015-02-27 | Drilling Completion |
2015-09-25 | Perforation |
2015-09-28 | Performed Stage 1 of Stimulation |
2015-09-28 | Performed Stage 2 of Stimulation |
2015-09-28 | Performed Stage 3 of Stimulation |
2015-09-28 | Performed Stage 4 of Stimulation |
2015-09-28 | Performed Stage 5 of Stimulation |
2015-09-28 | Performed Stage 6 of Stimulation |
2015-09-28 | Performed Stage 7 of Stimulation |
2015-09-28 | Performed Stage 8 of Stimulation |
2015-11-12 | Newly Drilled |
2018-03-06 | Begin Plugging |
2018-03-06 | Finished Plugging |
2019-04-08 | Fully Plugged |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-09-28 | 1 | 0 | 0 | 0 | |
2015-09-28 | 2 | Sand | 0 | 1,143 | 2,620 |
2015-09-28 | 3 | Sand | 0 | 1,496 | 1,212 |
2015-09-28 | 4 | Sand | 0 | 1,835 | 1,385 |
2015-09-28 | 5 | Sand | 0 | 1,603 | 2,228 |
2015-09-28 | 6 | Sand | 0 | 1,630 | 2,056 |
2015-09-28 | 7 | Sand | 0 | 1,980 | 2,360 |
2015-09-28 | 8 | Sand | 0 | 480 | 2,460 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | TRIMONT ENERGY LLC | 0.00 | 0 | 198.44 | 93 | 0.00 | 0 |
2016 | TRIMONT ENERGY LLC | 0.00 | 0 | 161.00 | 213 | 0.00 | 0 |
2017 | PENNFIELD ENERGY LLC | 0.00 | 0 | 1.00 | 1 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | TRIMONT ENERGY LLC | Produced Fluid | 493.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | TRIMONT ENERGY LLC | Fracing Fluid Waste | 717.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2015 | TRIMONT ENERGY LLC | Fracing Fluid Waste | 717 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | TRIMONT ENERGY LLC | Drill Cuttings | 2 Tons | ON SITE ENCAPSULATION | |
2015 | TRIMONT ENERGY LLC | Drilling Fluid Waste | 120.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2015 | TRIMONT ENERGY LLC | Produced Fluid | 985 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | TRIMONT ENERGY LLC | Drilling Fluid Waste | 120 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | TRIMONT ENERGY LLC | Produced Fluid | 985.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | TRIMONT ENERGY LLC | Produced Fluid | 273.53 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | TRIMONT ENERGY LLC | Produced Fluid | 273.53 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | TRIMONT ENERGY LLC | Produced Fluid | 40.00 Bbl | ROAD SPREADING | |
2017 | PENNFIELD ENERGY LLC | Produced Fluid | 1.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2346806 | Primary Facility | 2015-02-25 | Drilling/Alteration | No Violations Noted | |
2351329 | Primary Facility | 2015-03-03 | Routine/Complete Inspection | No Violations Noted | |
2359857 | Primary Facility | 2015-04-10 | Administrative/File Review | No Violations Noted | |
2412251 | Primary Facility | 2015-09-30 | Routine/Complete Inspection | No Violations Noted | |
2514055 | Primary Facility | 2016-08-23 | Site Restoration | No Violations Noted | |
2694036 | Primary Facility | 2018-02-13 | Routine/Partial Inspection | No Violations Noted | Operator filed NOI (2/12/18) to plug and will notify OGI of scheduled time. On site to verify coordinates. Inspection shows well equipped with rods, tubing , & pump jack. Label affixed to the pump jack. |
2701983 | Primary Facility | 2018-03-06 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspection shows plugging contractor (Howards) on site with the cement string run in the well. Waiting on cement truck to arrive. Tank on site to contain fluids. |
2702470 | Primary Facility | 2018-03-07 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Previous report on 3/6/18 showed the plugging contractor preparing to set cement plugs. Inspection shows monument has been buried below the surface. No pit on site, fluids were contained in a steel tank. Pump jack remains on site. |
2729439 | Primary Facility | 2018-05-09 | Administrative/File Review | No Violations Noted | Certificate of Plugging received April 19, 2018. Certificate did not have all the required signatures required under 78.124. Emailed Matt Duckett concerning the signature. Received the required signatures on Certificate of Plugging on May 2, 2018. Operator supplied logs in meeting with Matt Duckett, Doug Welsh, and myself to verify where the cement plugs were set. |
For data sources see[8]