If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45718 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.380575,"lon":-79.775939,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cranberry Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: DEEP HOLLOW | |
License Status: Active | |
Spud Date: 2015-01-22 | |
Permit Date: 2014-09-11 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.380575 | |
Longitude: -79.775939 |
Date | Event |
---|---|
2014-09-11 | New Permit Application |
2015-01-22 | Performed Spud Operation |
2015-01-23 | Drilling Completion |
2016-08-16 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 254.64 | 152 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 471.68 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 286.05 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | Produced Fluid | 96.67 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 96.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 5.50 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 21.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 35.20 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 312.33 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 45.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 1,221.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 56.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
2019 | CATALYST ENERGY INC | Produced Fluid | 181.67 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2326770 | Primary Facility | 2014-12-03 | Routine/Complete Inspection | No Violations Noted | |
2337995 | Primary Facility | 2015-01-22 | Routine/Complete Inspection | No Violations Noted | |
2338008 | Primary Facility | 2015-01-22 | Administrative/File Review | No Violations Noted | |
2344953 | Primary Facility | 2015-02-19 | Administrative/File Review | No Violations Noted | |
2416358 | Primary Facility | 2015-10-13 | Routine/Complete Inspection | No Violations Noted | |
2422167 | Primary Facility | 2015-10-28 | Site Restoration | No Violations Noted | |
2498805 | Primary Facility | 2016-07-06 | Drilling/Alteration | No Violations Noted | |
2499906 | Primary Facility | 2016-07-06 | Routine/Complete Inspection | No Violations Noted | |
2503747 | Primary Facility | 2016-07-25 | Administrative/File Review | No Violations Noted | |
2778579 | Primary Facility | 2018-09-21 | Site Restoration | No Violations Noted | Onsite for a well site restoration inspection. The well is producing, labeled, and the annulus is vented. Site is permanently stabilized, there are no E&S issues. The site is considered restored. |
For data sources see[7]