X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-121-45553

Well Details

Well ID: 37-121-45553
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Allegheny Township
Operator Name: 5M OIL LLC
Well Pad ID:
Farm/Lease Name: TIGHTPINCH 3254
License Status:
Spud Date:
Permit Date: 2014-01-16
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.553517
Longitude: -79.564883

For data sources see[1][2][3]

Well History

Date Event
2014-01-16 New Permit Application
2014-06-18 Performed Spud Operation
2014-06-19 Drilling Completion
2014-12-29 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CATALYST ENERGY INC 0.00 0 479.04 120 0 120
2015 CATALYST ENERGY INC 0.00 0 15.66 30 0.00 0
2016 CATALYST ENERGY INC 0.00 0 34.06 152 0.00 0
2017 CATALYST ENERGY INC 0.00 0 55.94 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CATALYST ENERGY INC Produced Fluid 1,382.26 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2014 CATALYST ENERGY INC Produced Fluid 1,382.26 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 CATALYST ENERGY INC Produced Fluid 14.60 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2015 CATALYST ENERGY INC Produced Fluid 14.6 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 395.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 33.00 Bbl ROAD SPREADING
2016 CATALYST ENERGY INC Produced Fluid 395 Bbl CENT WASTE TRT FAC NPDES PA0101508
2017 CATALYST ENERGY INC Produced Fluid 325.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2384635 Primary Facility 2015-07-02 Site Restoration No Violations Noted
2763683 Primary Facility 2018-08-15 Routine/Partial Inspection No Violations Noted Inspection shows well equipped for production with rods, tbg, and pump jack with an electric motor. Annulus tied in for gas production. Site restoration complete.

For data sources see[7]

References