X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-121-45527

Well Details

Well ID: 37-121-45527
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: DEEP HOLLOW
License Status: Active
Spud Date: 2014-11-11
Permit Date: 2014-02-03
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.385444
Longitude: -79.775333

For data sources see[1][2][3]

Well History

Date Event
2014-02-03 New Permit Application
2014-11-11 Performed Spud Operation
2014-11-12 Drilling Completion
2016-06-21 Performed Stage 3 of Stimulation
2016-06-23 Performed Stage 1 of Stimulation
2016-06-23 Performed Stage 2 of Stimulation
2016-06-23 Performed Stage 4 of Stimulation
2016-06-23 Performed Stage 5 of Stimulation
2016-06-23 Performed Stage 6 of Stimulation
2016-08-02 NEWLY DRILLED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-06-23 1 SAND 20,034 2,500 3,815
2016-06-23 2 SAND 20,034 2,000 3,100
2016-06-21 3 SAND 20,034 1,500 850
2016-06-23 4 SAND 20,034 1,400 2,029
2016-06-23 5 SAND 20,034 1,300 750
2016-06-23 6 SAND 20,034 1,400 750

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CATALYST ENERGY INC 0.00 0 361.00 195 0 195
2015 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2016 CATALYST ENERGY INC 0.00 0 254.64 152 0.00 0
2017 CATALYST ENERGY INC 0.00 0 471.68 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 286.05 365 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CATALYST ENERGY INC Produced Fluid 1,112.79 Bbl CENT WASTE TRT FAC NPDES PA0101508
2014 CATALYST ENERGY INC Produced Fluid 1,112.79 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2015 CATALYST ENERGY INC Produced Fluid 96.67 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 CATALYST ENERGY INC Produced Fluid 96.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 16.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 16.67 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 16.67 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 5.50 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 21.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 35.20 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 11.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 11.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 45.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 1,221.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 56.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE 001-A
2019 CATALYST ENERGY INC Produced Fluid 181.67 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 312.33 Bbl INJECTION DISPOSAL WELL 34-155-24079

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2321411 Primary Facility 2014-11-12 Routine/Complete Inspection No Violations Noted
2364584 Primary Facility 2015-04-28 Administrative/File Review No Violations Noted
2366170 Primary Facility 2015-04-29 Routine/Complete Inspection No Violations Noted
2416180 Primary Facility 2015-10-13 Routine/Complete Inspection No Violations Noted
2422172 Primary Facility 2015-10-28 Site Restoration No Violations Noted
2495133 Primary Facility 2016-06-22 Drilling/Alteration No Violations Noted
2495844 Primary Facility 2016-06-23 Routine/Complete Inspection No Violations Noted
2625964 Primary Facility 2017-08-15 Site Restoration No Violations Noted Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is permanently stabilized. The site is considered restored.

For data sources see[8]

References