If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45503 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.316328,"lon":-79.630178,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Rockland Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: FRY LEASE 2991 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-12-24 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.316328 | |
Longitude: -79.630178 |
Date | Event |
---|---|
2013-12-24 | New Permit Application |
2014-11-10 | Performed Spud Operation |
2014-11-12 | Drilling Completion |
2015-08-05 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | 0.00 | 0 | 297.60 | 180 | 0 | 180 |
2015 | CATALYST ENERGY INC | 0.00 | 0 | 440.07 | 213 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 61.26 | 61 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 151.55 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 122.98 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | Produced Fluid | 739.79 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2014 | CATALYST ENERGY INC | Produced Fluid | 739.79 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 847 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 847.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 341.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 88.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 341 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 22.00 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 22.00 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 472.20 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 420.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 66.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 22.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2019 | CATALYST ENERGY INC | Produced Fluid | 47.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2320234 | Primary Facility | 2014-11-12 | Administrative/File Review | No Violations Noted | |
2321412 | Primary Facility | 2014-11-12 | Routine/Complete Inspection | No Violations Noted | |
2332919 | Primary Facility | 2014-12-30 | Routine/Complete Inspection | No Violations Noted | |
2346667 | Primary Facility | 2015-02-25 | Administrative/File Review | No Violations Noted | |
2364186 | Primary Facility | 2015-04-23 | Routine/Complete Inspection | No Violations Noted | |
2386100 | Primary Facility | 2015-07-09 | Drilling/Alteration | No Violations Noted | |
2390992 | Primary Facility | 2015-07-21 | Administrative/File Review | No Violations Noted | |
2399081 | Primary Facility | 2015-08-12 | Routine/Complete Inspection | No Violations Noted | |
2426728 | Primary Facility | 2015-11-18 | Site Restoration | No Violations Noted | |
2492055 | Primary Facility | 2016-06-07 | Routine/Complete Inspection | No Violations Noted | |
2528591 | Primary Facility | 2016-10-12 | Routine/Complete Inspection | No Violations Noted | |
2659835 | Primary Facility | 2017-11-14 | Routine/Partial Inspection | No Violations Noted | Inspection shows well tied in for production with rods, tubing, and pump jack with electric motor. Annulus tied into poly tank. Label affixed to the pump jack. |
For data sources see[7]