If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-45210 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.369158,"lon":-79.635042,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: HAZEL RICE 3081 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2013-03-12 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.369158 | |
| Longitude: -79.635042 |
| Date | Event |
|---|---|
| 2013-03-12 | New Permit Application |
| 2013-04-22 | Performed Spud Operation |
| 2013-04-23 | Drilling Completion |
| 2014-12-22 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2014 | CATALYST ENERGY INC | 0.00 | 0 | 220.50 | 365 | 0 | 365 |
| 2015 | CATALYST ENERGY INC | 0.00 | 0 | 8.65 | 61 | 0.00 | 0 |
| 2016 | CATALYST ENERGY INC | 0.00 | 0 | 15.48 | 61 | 0.00 | 0 |
| 2017 | CATALYST ENERGY INC | 0.00 | 0 | 93.15 | 365 | 0.00 | 0 |
| 2018 | CATALYST ENERGY INC | 0.00 | 0 | 64.80 | 365 | 0.00 | 0 |
| 2019 | CATALYST ENERGY INC | 0.00 | 0 | 11.33 | 365 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2014 | CATALYST ENERGY INC | Produced Fluid | 676.25 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2014 | CATALYST ENERGY INC | Produced Fluid | 676.25 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 49.58 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 49.58 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 183.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 183.33 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 9.17 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 351.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 18.33 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 332.92 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 12.50 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2151577 | Primary Facility | 2013-03-27 | Routine/Complete Inspection | No Violations Noted | |
| 2154144 | Primary Facility | 2013-04-03 | Routine/Complete Inspection | No Violations Noted | |
| 2160296 | Primary Facility | 2013-04-22 | Routine/Complete Inspection | No Violations Noted | |
| 2160733 | Primary Facility | 2013-04-23 | Drilling/Alteration | No Violations Noted | |
| 2161824 | Primary Facility | 2013-04-24 | Routine/Complete Inspection | No Violations Noted | |
| 2185031 | Primary Facility | 2013-07-18 | Routine/Complete Inspection | No Violations Noted | |
| 2185364 | Primary Facility | 2013-07-23 | Administrative/File Review | No Violations Noted | |
| 2228868 | Primary Facility | 2013-12-12 | Routine/Complete Inspection | No Violations Noted | |
| 2289744 | Primary Facility | 2014-07-23 | Site Restoration | No Violations Noted | |
| 2315552 | Primary Facility | 2014-10-21 | Site Restoration | No Violations Noted | |
| 2608688 | Primary Facility | 2017-06-29 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is plumbed to the stock tanks. The site has greater than 70% vegetative cover and is stable. There is excessive fluid leaking from the stuffing box and impacting soil around the well. The tank battery appears to be in good shape housing two 210 bbl. stock tanks and a subsurface 140 bbl. brine tank. |
| 2666515 | Primary Facility | 2017-11-30 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well appears to have recently produced, is labeled, and the annulus is vented. The fluid that had leaked in the previous inspection report has been cleaned up. It no longer appears fluid is leaking. There are no E&S issues. |
For data sources see[7]