If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45077 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.315297,"lon":-79.62745,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Rockland Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: MASTERS WEST 2977 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-12-14 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.315297 | |
Longitude: -79.627450 |
Date | Event |
---|---|
2012-12-14 | New Permit Application |
2013-05-02 | Performed Spud Operation |
2013-05-03 | Drilling Completion |
2014-12-22 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CATALYST ENERGY INC | 0.00 | 0 | 100.31 | 365 | 0 | 365 |
2015 | CATALYST ENERGY INC | 0.00 | 0 | 52.97 | 30 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 35.96 | 61 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 33.00 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 39.49 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | Produced Fluid | 120.83 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 120.83 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 119.17 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 119.17 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 18.33 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 3.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | CATALYST ENERGY INC | Produced Fluid | 239.17 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 63.50 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2144579 | Primary Facility | 2013-02-28 | Routine/Complete Inspection | No Violations Noted | |
2163617 | Primary Facility | 2013-05-01 | Routine/Partial Inspection | No Violations Noted | |
2172483 | Primary Facility | 2013-06-06 | Administrative/File Review | No Violations Noted | |
2174479 | Primary Facility | 2013-06-12 | Administrative/File Review | No Violations Noted | |
2175439 | Primary Facility | 2013-06-12 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
2175447 | Primary Facility | 2013-06-13 | Routine/Complete Inspection | No Violations Noted | |
2178323 | Primary Facility | 2013-06-20 | Routine/Complete Inspection | No Violations Noted | |
2200607 | Primary Facility | 2013-08-29 | Site Restoration | No Violations Noted | |
2204172 | Primary Facility | 2013-09-10 | Site Restoration | No Violations Noted | |
2547069 | Primary Facility | 2016-12-22 | Routine/Complete Inspection | No Violations Noted | |
2623632 | Primary Facility | 2017-08-08 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The tank battery appears to be in good shape housing two 210 bbl. tanks and a subsurface 140 bbl. brine tank. There is equipment on the lease that is not being used for production (culvert, flow line, pieces of exhaust from a generator). General cleanup of left over parts should be completed on the lease. |
2818983 | Primary Facility | 2018-12-19 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well appears to have recently produced, is labeled, and the annulus is vented. Site is stable with greater than 70% vegetative cover. There are no E&S issues. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2175439 | 670562 | 06/12/2013 | 2013-06-12 | 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment. | Administrative |
For data sources see[7]