If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-44687 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.311703,"lon":-79.605514,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Rockland Township | |
Operator Name: BULL RUN RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: MASTERS LEASE | |
License Status: Plugged and Abandoned | |
Spud Date: 2011-01-17 | |
Permit Date: 2011-01-10 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.311703 | |
Longitude: -79.605514 |
Date | Event |
---|---|
2011-01-10 | New Permit Application |
2011-01-14 | Performed Spud Operation |
2011-01-21 | Drilling Completion |
2011-01-26 | Perforation |
2012-10-19 | NEWLY DRILLED |
2019-09-10 | Begin Plugging |
2019-12-31 | Finished Plugging |
2020-02-19 | Fully Plugged |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CATALYST ENERGY INC | 0.00 | 0 | 309.00 | 210 | 0.00 | 0 |
2012 | CATALYST ENERGY INC | 0.01 | 150 | 145.00 | 150 | 180 | 150 |
2014 | CATALYST ENERGY INC | 0.01 | 365 | 315.99 | 365 | 0.01 | 365 |
2015 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 15.00 | 30 | 0.00 | 0 |
2018 | BULL RUN RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CATALYST ENERGY INC | Produced Fluid | 305.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2012 | CATALYST ENERGY INC | Produced Fluid | 180.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 96.3 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2014 | CATALYST ENERGY INC | Produced Fluid | 96.30 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1943593 | Primary Facility | 2011-01-19 | Drilling/Alteration | No Violations Noted | |
1945456 | Primary Facility | 2011-01-26 | Routine/Complete Inspection | No Violations Noted | |
1946466 | Primary Facility | 2011-01-31 | Routine/Complete Inspection | No Violations Noted | |
1946826 | Primary Facility | 2011-01-31 | Routine/Complete Inspection | No Violations Noted | |
1952845 | Primary Facility | 2011-02-24 | Routine/Complete Inspection | No Violations Noted | |
1955857 | Primary Facility | 2011-03-08 | Routine/Complete Inspection | No Violations Noted | |
2023917 | Primary Facility | 2011-11-30 | Routine/Complete Inspection | No Violations Noted | |
2071561 | Primary Facility | 2012-05-30 | Administrative/File Review | No Violations Noted | |
2073053 | Primary Facility | 2012-05-31 | Routine/Complete Inspection | No Violations Noted | |
2403268 | Primary Facility | 2015-08-27 | Routine/Complete Inspection | No Violations Noted | |
2508165 | Primary Facility | 2016-08-02 | Routine/Complete Inspection | No Violations Noted | |
2651714 | Primary Facility | 2017-10-24 | Routine/Complete Inspection | No Violations Noted | Onsite for a follow-up to a small release that occurred. Plugs have been placed in the tank and the valves are closed. There are a few sorbents still in the tank battery that should be removed. It appears all the oil has been cleaned up. |
2695637 | Primary Facility | 2018-02-15 | Routine/Partial Inspection | No Violations Noted | Onsite for a follow up inspection of the previous release in the tank battery. There is a small amount of ice still located within the dike, but it appears all the oil and sorbents have been removed. |
2736968 | Primary Facility | 2018-06-04 | Routine/Partial Inspection | No Violations Noted | Transfer from Catalyst Energy to Bull Run Resources approved on 4/5/18. Well equipped for production with rods, tubing, and pump jack. No motor on jack at time of inspection. Annulus tied in for gas production. Label affixed to the well. |
For data sources see[7]