X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-21693

Well Details

Well ID: 37-117-21693
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Blossburg Borough
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 150863
Farm/Lease Name: DCNR 595 19H 50286
License Status:
Spud Date:
Permit Date: 2014-03-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.690583
Longitude: -77.0874

For data sources see[1][2][3]

Well History

Date Event
2014-03-05 New Permit Application
2014-04-03 Performed Spud Operation
2014-06-26 Drilling Completion
2014-09-28 Perforation
2015-02-04 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-09-28 2014-09-30 7,921 5,282,590 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Proppant 80/100 Oklahoma Trican Proppant Silica 14808-60-7 100 0.880853 0
FEAC 20 Trican Iron Control Acetic acid 64-19-7 50 0.00039352 0
Citric acid 77-92-9 30 0.00023611 0
Proppant 30/50 Ottawa Trican Proppant Crystalline silica (quartz) 14808-60-7 100 5.5529 0
AL-7NR Trican Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00001113 0
Water Seneca Resources Carrier/Base Fluid Water 7732-18-5 100 87.3469 0
MBC 516 Trican Biocide Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.00082957 0
Ethanol 64-17-5 2.8 0.00027985 0
N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00054971 0
Glutaraldehyde 111-30-8 27 0.00269859 0
Proppant 40/70 Ottawa Trican Proppant Crystalline silica (quartz) 14808-60-7 100 6.14129 0
7.5% HydroChloric Acid Trican Acid Hydrochloric Acid HCl 7647-01-0 7.5 0.0387871 0
Sl-7 Trican Scale Inhibitor Ethylene glycol 107-21-1 30 0.00852667 0
FR-15 Trican Friction Reducer Proprietary Amide Proprietary 2.5 0.00234138 0
Distillates (petroleum), Hydrotreated Light 64742-47-8 25 0.0234138 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2015 SENECA RESOURCES CO LLC 527,502.16 157 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 933,825.20 366 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 667,531.60 361 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 529,312.67 357 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 426,888.48 344 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 SENECA RESOURCES CO LLC Produced Fluid 3,159.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 SENECA RESOURCES CO LLC Produced Fluid 99.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 SENECA RESOURCES CO LLC Drill Cuttings 974.50 Tons RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR097R017
2014 SENECA RESOURCES CO LLC Drill Cuttings 19.15 Tons LANDFILL 301358
2015 SENECA RESOURCES CO LLC Produced Fluid 6,387.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SENECA RESOURCES CO LLC Basic Sediment 136.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 SENECA RESOURCES CO LLC Servicing Fluid 36.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 SENECA RESOURCES CO LLC Produced Fluid 867.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2015 SENECA RESOURCES CO LLC Produced Fluid 3,793.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SENECA RESOURCES CO LLC Produced Fluid 400.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 SENECA RESOURCES CO LLC Produced Fluid 4,923.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 8.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Produced Fluid 520.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SENECA RESOURCES CO LLC Produced Fluid 124.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2017 SENECA RESOURCES CO LLC Produced Fluid 1,402.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 1,620.82 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 54.28 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 701.42 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 928.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 193.57 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 SENECA RESOURCES CO LLC Produced Fluid 272.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 18.57 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 SENECA RESOURCES CO LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 72.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 29.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 382.15 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2255356 Primary Facility 2014-03-18 Routine/Complete Inspection No Violations Noted Pre-Op Inspection. 5 drilling permits at this site in State Forest.
2263345 Primary Facility 2014-04-16 Drilling/Alteration No Violations Noted
2319514 Primary Facility 2014-11-06 Routine/Complete Inspection No Violations Noted
2340794 Primary Facility 2015-02-03 Routine/Complete Inspection No Violations Noted Hydraulically Fractured 18H last week. Installing 2/38" production tubing into the 7 Marcellus gas wells on site.
2371865 Primary Facility 2015-05-15 Routine/Complete Inspection No Violations Noted
2396503 Primary Facility 2015-08-04 Routine/Complete Inspection No Violations Noted
2494029 Primary Facility 2016-06-10 Routine/Partial Inspection No Violations Noted 6 Marcellus Shale wells producing natural gas from this ~3.6 pad
2820544 Primary Facility 2018-12-27 Site Restoration No Violations Noted NOT denied. Slopes around the pad are temporarily stabilized with hydroseed. Filter sock (photo 2) is considered a temporary E & S control and hydro seed (photo 1) a temporary stabilization; ESCGP termination requires "permanent stabilization", and removal of temporary E & S controls.

I took electrical conductivity readings from pooled water on site with an Oakton PCSTestr 35. A puddle near the production tanks returned 0.39 mS/cm. Air temp: 37F JLP

For data sources see[8]

References