X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-21664

Well Details

Well ID: 37-117-21664
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Sullivan Township
Operator Name: SWEPI LP
Well Pad ID: 150372
Farm/Lease Name: BRADFORD 481 3H
License Status:
Spud Date:
Permit Date: 2013-10-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.806342
Longitude: -76.922014

For data sources see[1][2][3]

Well History

Date Event
2013-10-31 New Permit Application
2013-11-11 Performed Spud Operation
2014-03-03 Drilling Completion
2014-04-22 Perforation
2015-01-05 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-05-22 2014-06-03 6,228 4,503,150 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Customer & CWS Base Fluid & Mix Water Water 7732-18-5 100 86.0537 37,684,100.0
Sand (Proppant), DAP-902, DAP-925,
DWP-602, BioClear 2000, Hydrochloric Acid
CWS Propping Agent, Scale Inhibitor, Acid Corrosion Inhibitor, Friction Reducer, Biocide, Clean Perforations Apatite 64476-38-6 0.1 0.00753 3298.33
Polyoxyalkylenes Proprietary 30 0.00005000 21.04
Nonionic surfactant Proprietary 5 0.00369 1613.72
Biotite 1302-27-8 0.1 0.00753 3298.33
Paraffinic hydrocarbon solvent 64742-47-8 30 0.02211 9682.34
Fatty acids Proprietary 30 0.00005000 21.04
Methanol 67-56-1 60 0.0001 42.07
Organic acid salts Proprietary 40 0.00573 2510.01
Crystalline silica (Quartz) 14808-60-7 100 13.6462 5,975,830.0
Polyoxyalkylenes surfactant Proprietary 5 0.00369 1613.72
Goethite 1310-14-1 0.1 0.00891 3901.6
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.01305 5713.73
Illite 12173-60-3 1 0.01848 8091.09
Formaldehyde 50-00-0 0.1 0.00001000 0.07
1,2-Propanediol 57-55-6 10 0.00143 627.5
Olefin Proprietary 5 0.00001000 3.51
Hydrochloric acid 7647-01-0 37 0.14388 63008.1
Modified thiourea polymer 68527-49-1 30 0.00005000 21.04
Polyethylene glycol mixture 25322-68-3 70 0.01305 5713.73
Propargyl Alcohol 107-19-7 10 0.00002000 7.01
Calcite 471-34-1 1 0.01446 6334.31
Ilmenite 98072-94-7 0.1 0.00684 2996.7
Polyacrylamide polymer Proprietary 40 0.02948 12909.8
Sodium chloride 7647-14-5 1 0.00001000 0.7

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 SWEPI LP 0.00 0 0.00 0 0.00 0
2014 SWEPI LP 563,960.05 159 0.00 0 0.00 0
2015 SWEPI LP 866,773.31 361 0.00 0 0.00 0
2016 SWEPI LP 652,603.97 364 0.00 0 0.00 0
2017 SWEPI LP 558,254.74 363 0.00 0 0.00 0
2018 SWEPI LP 483,956.21 364 0.00 0 0.00 0
2019 SWEPI LP 416,534.49 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 SWEPI LP Drilling Fluid Waste 450.54 Bbl REUSE OTHER THAN ROAD SPREADING
2013 SWEPI LP Drilling Fluid Waste 185.71 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 SWEPI LP Drilling Fluid Waste 107.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 SWEPI LP Drill Cuttings 962.12 Tons LANDFILL 301358
2014 SWEPI LP Fracing Fluid Waste 64.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 SWEPI LP Produced Fluid 578.82 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 SWEPI LP Drilling Fluid Waste 454.66 Bbl REUSE OTHER THAN ROAD SPREADING
2014 SWEPI LP Fracing Fluid Waste 1,140.90 Bbl REUSE OTHER THAN ROAD SPREADING
2014 SWEPI LP Drilling Fluid Waste 46.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 SWEPI LP Produced Fluid 505.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC024
2014 SWEPI LP Produced Fluid 19,690.41 Bbl REUSE OTHER THAN ROAD SPREADING
2014 SWEPI LP Produced Fluid 3,154.79 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2014 SWEPI LP Drilling Fluid Waste 90.72 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 SWEPI LP Produced Fluid 214.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 SWEPI LP Drill Cuttings 282.34 Tons LANDFILL 301358
2015 SWEPI LP Produced Fluid 267.26 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 SWEPI LP Produced Fluid 80.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC011
2015 SWEPI LP Produced Fluid 2,048.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 SWEPI LP Fracing Fluid Waste 60.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 SWEPI LP Produced Fluid 1,943.40 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWEPI LP Synthetic Liner Materials 6.20 Tons LANDFILL 301358
2016 SWEPI LP Produced Fluid 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 SWEPI LP Produced Fluid 2,406.20 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWEPI LP Produced Fluid 20.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 SWEPI LP Produced Fluid 79.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 SWEPI LP Produced Fluid 303.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2017 SWEPI LP Waste Water Treatment Sludge 2.40 Tons STORAGE PENDING DISPOSAL OR REUSE PA-0678
2017 SWEPI LP Produced Fluid 726.20 Bbl REUSE (AT WELL PAD)
2018 SWEPI LP Produced Fluid 400.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2018 SWEPI LP Produced Fluid 789.93 Bbl REUSE (AT WELL PAD)
2018 SWEPI LP Produced Fluid 73.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 SWEPI LP Produced Fluid 20.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 SWEPI LP Produced Fluid 88.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 SWEPI LP Produced Fluid 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 SWEPI LP Produced Fluid 20.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 SWEPI LP Waste Water Treatment Sludge 0.75 Tons RESIDUAL WASTE TRANSFER FACILITY 2014-541
2019 SWEPI LP Produced Fluid 81.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 SWEPI LP Produced Fluid 381.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2227572 Primary Facility 2013-12-09 Routine/Complete Inspection No Violations Noted
2228415 Primary Facility 2013-12-11 Routine/Complete Inspection No Violations Noted
2240315 Primary Facility 2014-01-28 Incident- Response to Accident or Event No Violations Noted 34 barrel drilling mud release on January 26, 50 barrels on January 28
2262101 Primary Facility 2014-04-09 Drilling/Alteration No Violations Noted
2274425 Primary Facility 2014-05-28 Routine/Complete Inspection No Violations Noted
2296245 Primary Facility 2014-07-03 Follow-up Inspection No Violations Noted
2401294 Primary Facility 2015-08-24 Site Restoration No Violations Noted The Bradford 481 Well Site was inspected in response to a Notice of Termination received by the Department on July 27, 2015.
2442400 Primary Facility 2016-01-13 Routine/Complete Inspection No Violations Noted
2748485 Primary Facility 2018-07-03 Routine/Partial Inspection No Violations Noted SWEPI inspection log is in a mailbox near the production tanks, last inspected listed July 2, 2018.

I took electrical conductivity readings with an Oakton PCSTestr 35. A puddle on the pad gave a 0.67 mS/cm reading. JLP

2835230 Primary Facility 2019-02-04 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of SWEPI's Bradford 481 Well pad in Sullivan Twp, Tioga County on 2/4/2019 at 1130 hours. The weather was partly cloudy and 50 degrees. Some slopes still showed some snow cover. The act 9 sign was shown in photo #1 and the E&S Plan was in the mailbox by the sign. A SWEPI Inspector was onsite currently performing a site inspection.

Five wells, the 481 1H & 3H and the 603 2H 4H & 6H, are all currently in production. The site remains stabilized and well vegetated. All PCSM practices remain in place and functional. All fluids and puddles field measured were within normal conductivity ranges. Containment structures were well maintained and no leaks were observed.

No violations noted today, I departed the site at 1215.

For data sources see[8]

References