X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22517

Well Details

Well ID: 37-115-22517
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Bridgewater Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 149949
Farm/Lease Name: MEAD B 006
License Status:
Spud Date:
Permit Date: 2018-06-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.832644
Longitude: -75.814131

For data sources see[1][2][3]

Well History

Date Event
2018-06-21 New Permit Application
2018-10-28 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-20 2019-04-17 6,528 14,242,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Friction Reducer, KFR-16FW SOLVAY Friction Reducer Water 7732-18-5 30 0.0367034 52663.8
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00611724 8777.3
ammonium chloride 12125-02-9 30 0.0367034 52663.8
Petroleum distillate 64742-47-8 1 0.00122345 1755.46
Copolymer of 2-propenamide 69418-26-4 5 0.00611724 8777.3
oleic acid diethanolamide 93-83-4 1 0.00122345 1755.46
Other Chemical(s) Listed Above See Trade Name(s) List formic acid 64-18-6 10 0.000102942 147.707
didecyldimethylammonium chloride 7173-51-5 8 0.000676523 970.708
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.000102942 147.707
Ethoxylated alcohol 68131-39-5 10 0.000102942 147.707
isoproyl alcohol 67-63-0 5 0.00005147 73.853
Cinnamaldehyde 104-55-2 10 0.000102942 147.707
ethonal 64-17-5 2.8 0.000237675 341.027
Copolymer of 2-propenamide 69418-26-4 5 0.00611724 8777.3
oleic acid diethanolamide 93-83-4 1 0.00122345 1755.46
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00611724 8777.3
Citric acid 77-92-9 30 0.000871799 1250.9
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000450733 646.733
Glutaral 111-30-8 26.7 0.0022664 3251.93
Water 7732-18-5 85 0.285101 409077
organic phosphonic salts 15827-60-8 15 0.00243201 3489.57
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000205884 295.413
Petroleum distillate 64742-47-8 1 0.00122345 1755.46
ammonium chloride 12125-02-9 30 0.0367034 52663.8
Water CABOT Carrier/Base Fluid Water 7732-18-5 100 82.8309 118,850,000.0
Iron Control, KFEAC-20/30 KEANE Iron Control Acetic acid 64-19-7 5 0.0001453 208.483
Citric acid 77-92-9 30 0.000871799 1250.9
Hydrochloric Acid (15%) KEANE Acidizing Water 7732-18-5 85 0.285101 409077
Hydrochloric Acid 7647-01-0 15 0.050312 72190.1
Sand (Proppant) HI CRUSH Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 16.6827 23,937,100.0
Scale Inhibitor, KSI-19 KEANE Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00243201 3489.57
Water 7732-18-5 95 0.0154027 22100.6
Acid Inhibitor, KAI-12 KEANE Acid Inhibitor Ethoxylated alcohol 68131-39-5 10 0.000102942 147.707
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000205884 295.413
Ethylene glycol 107-21-1 40 0.000411769 590.826
isoproyl alcohol 67-63-0 5 0.00005147 73.853
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.000102942 147.707
formic acid 64-18-6 10 0.000102942 147.707
Cinnamaldehyde 104-55-2 10 0.000102942 147.707
Biocide, MBC-516 Brenntag Biocide Glutaral 111-30-8 26.7 0.0022664 3251.93
didecyldimethylammonium chloride 7173-51-5 8 0.000676523 970.708
ethonal 64-17-5 2.8 0.000237675 341.027
Water 7732-18-5 56.7 0.00481461 6908.23
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000450733 646.733

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 3,469,594.00 232 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 6.47 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 336.77 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 79.75 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 216.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Drill Cuttings 1,156.63 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.20 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 25.26 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 1,725.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 3.01 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 9,069.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2795958 Primary Facility 2018-10-29 Drilling/Alteration No Violations Noted At time of inspection.

On site for a new spud inspection. Met with Brett Wambold of Selman & Associates. United Drilling was on site to drill and run the conductor pipe in the 2H, 3H, 5H, 6H, 9H and 10H wells. The 2H was at TD of 108'. There was an auger rig on the 10H at a depth of 45'. Brett said all the conductors will be set at 108'. There are three existing wells on site, the 1H, 7H and 8H that are temporarily plugged. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2835619 Primary Facility 2019-02-05 Routine/Complete Inspection No Violations Noted I previously performed an inspection (inspection number 2790535) in response to a complaint (number 337613) called in, consisting of mud being pulled onto the road from the B. Mead pad. The weather at the time of inspection was in the upper 30s and the skies were overcast with breaks of sun.

The pad was undergoing a drilling operation at the time of inspection, so truck traffic was constantly heavy. There was ongoing sweeping occurring during the inspection, although the roadside was lightly muddy, not just from truck traffic but also from snowmelt. There was a coating of gravel on the access road. It appeared the operator was addressing the issue of debris carryout at the time of inspection.

There were no violations.

2842155 Primary Facility 2019-02-20 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Marlon Droddy. H&P 259 was on site and drilling the lateral section of the 6H well when I arrived on site. They were drilling with DOBM. There are three existing wells on site that are temporarily plugged and six new wells to be drilled. The 2H, 3H, 5H and 9H wells are drilled and completed to TD, the 10H is drilled to the depth of the intermediate casing. The proposed TD for the 6H well is 16,950'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[8]

References