X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22472

Well Details

Well ID: 37-115-22472
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lathrop Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 144968
Farm/Lease Name: CARPENETTI R 006
License Status:
Spud Date:
Permit Date: 2018-03-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.662828
Longitude: -75.819872

For data sources see[1][2][3]

Well History

Date Event
2018-03-23 New Permit Application
2018-05-18 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-16 2019-04-03 7,551 13,770,700 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Biocide, MBC-516 Keane Biocide Glutaral 111-30-8 26.7 0.00241543 3160.69
ethanal 64-17-5 2.8 0.000253303 331.458
didecyldimethylammonium chloride 7173-51-5 8 0.00072101 943.473
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000480372 628.587
Water 7732-18-5 56.7 0.0051312 6714.4
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.8203 114,917,000.0
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Cinnamaldehyde 104-55-2 10 0.00007902 103.395
formic acid 64-18-6 10 0.00007902 103.395
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007902 103.395
isoproyl alcohol 67-63-0 5 0.00003951 51.697
Ethylene glycol 107-21-1 40 0.00031606 413.578
Ethoxylated alcohol 68131-39-5 10 0.00007902 103.395
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00015803 206.789
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 85 0.205998 269557
Hydrochloric Acid 7647-01-0 15 0.0363526 47569
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.8049 15,447,200.0
Other Chemical(s) Listed Above See Trade Name(s) List Citric acid 77-92-9 30 0.000670116 876.876
isoproyl alcohol 67-63-0 5 0.00003951 51.697
Cinnamaldehyde 104-55-2 10 0.00007902 103.395
Ammonium Chloride 12125-02-9 1.5 0.00155213 2031.02
didecyldimethylammonium chloride 7173-51-5 8 0.00072101 943.473
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000480372 628.587
Ethoxylated alcohol 68131-39-5 10 0.00007902 103.395
organic phosphonic salts 15827-60-8 15 0.00007734 101.204
Water 7732-18-5 85 0.205998 269557
Glutaral 111-30-8 26.7 0.00241543 3160.69
formic acid 64-18-6 10 0.00007902 103.395
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00015803 206.789
organic phosphonic salts 15827-60-8 15 0.00246994 3232.02
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007902 103.395
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00103475 1354.02
Methanol 67-56-1 20 0.00329325 4309.36
ethanal 64-17-5 2.8 0.000253303 331.458
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.020695 27080.3
oleic acid diethanolamide 93-83-4 1.5 0.00155213 2031.02
Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 30 0.000670116 876.876
Acetic acid 64-19-7 5 0.000111686 146.146
Friction Reducer, KFR-16FW Keane Friction Reducer Ammonium Chloride 12125-02-9 1.5 0.00155213 2031.02
Water 7732-18-5 60 0.0620851 81241
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.020695 27080.3
oleic acid diethanolamide 93-83-4 1.5 0.00155213 2031.02
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00103475 1354.02
Scale Inhibitor, KSI-19 Keane Scale Inhibitor Methanol 67-56-1 20 0.00329325 4309.36
Water 7732-18-5 65 0.0107031 14005.4
organic phosphonic salts 15827-60-8 15 0.00246994 3232.02
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00007734 101.204
Water 7732-18-5 85 0.000438266 573.489

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 2,316,499.00 248 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 3.09 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 1,286.65 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 71.16 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.14 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 32.84 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 979.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 3.08 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 2,510.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.06 Tons RESIDUAL WASTE TRANSFER FACILITY 101714

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2732854 Primary Facility 2018-05-18 Preoperation Inspection No Violations Noted The Department (Casy Baldwin and I) was on site to conduct a Preoperational Inspection in accordance with 3258(a.1). Upon arrival the Department reviewed the E&S Inspection Log which indicated that the most recent inspection was conducted on 5/17/18. The Department met with Mike Murnin (Construction Foreman-Cabot ) and Larry Cheatwood (Company Man-Cabot). This site was previously permitted under ESCGP ESX12-115-0191. The previous ESCGP was Terminated in May of 2016 and was re-permitted under the new ESCGP2 to enlarge the pad and drill an additional 9 wells. At the time of the inspection they were placing shot rock on the site. On the eastern side of the access road where it meets the pad they redlined a ditch on the fill and will grade it back and allow stormwater to travel to the previously existing access road roadside ditch.

For data sources see[8]

References