X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22394

Well Details

Well ID: 37-115-22394
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jessup Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154612
Farm/Lease Name: MOORE, S. 6
License Status:
Spud Date:
Permit Date: 2017-10-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.787397
Longitude: -75.957814

For data sources see[1][2][3]

Well History

Date Event
2017-10-31 New Permit Application
2018-05-22 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-20 2018-09-24 6,531 29,275,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Inhibitor, KAI-12 Keane Acid Inhibitor formic acid 64-18-6 10 0.00007701 214.667
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000154011 429.334
isoproyl alcohol 67-63-0 5 0.00003850 107.333
Ethylene glycol 107-21-1 40 0.000308023 858.667
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007701 214.667
Ethoxylated alcohol 68131-39-5 10 0.00007701 214.667
Cinnamaldehyde 104-55-2 10 0.00007701 214.667
Friction Reducer, KFR-16FW Keane Friction Reducer Water 7732-18-5 60 0.0612051 170620
Ammonium Chloride 12125-02-9 1.5 0.00153013 4265.5
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0204017 56873.3
oleic acid diethanolamide 93-83-4 1.5 0.00153013 4265.5
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00102009 2843.67
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.998 33,446,400.0
Other Chemical(s) Listed Above See Trade Name(s) List formic acid 64-18-6 10 0.00007701 214.667
oleic acid diethanolamide 93-83-4 1.5 0.00153013 4265.5
Cinnamaldehyde 104-55-2 10 0.00007701 214.667
Ethoxylated alcohol 68131-39-5 10 0.00007701 214.667
Water 7732-18-5 7.5 0.0175766 48997.9
organic phosphonic salts 15827-60-8 15 0.00268273 7478.58
ethanal 64-17-5 2.8 0.000248012 691.377
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00102009 2843.67
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007701 214.667
isoproyl alcohol 67-63-0 5 0.00003850 107.333
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0204017 56873.3
didecyldimethylammonium chloride 7173-51-5 8 0.000705948 1967.95
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000154011 429.334
Glutaral 111-30-8 26.7 0.00236497 6592.77
Ammonium Chloride 12125-02-9 1.5 0.00153013 4265.5
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000470337 1311.15
Citric acid 77-92-9 30 0.000648489 1807.78
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000108082 301.296
Citric acid 77-92-9 30 0.000648489 1807.78
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.636 244,301,000.0
Biocide, MBC-516 Keane Biocide ethanal 64-17-5 2.8 0.000248012 691.377
didecyldimethylammonium chloride 7173-51-5 8 0.000705948 1967.95
Water 7732-18-5 56.7 0.00502401 14005.3
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000470337 1311.15
Glutaral 111-30-8 26.7 0.00236497 6592.77
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0169906 47364.3
organic phosphonic salts 15827-60-8 15 0.00268273 7478.58
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.0175766 48997.9
Hydrochloric Acid 7647-01-0 15 0.0351532 97995.8

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CABOT OIL & GAS CORP 1,830,336.00 75 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 6,175,202.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Produced Fluid 55.13 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 35.45 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 48,727.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Drill Cuttings 1,804.49 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.11 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil 0.05 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 0.05 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 168.41 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 2.43 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 2.10 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.14 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 259.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Soil Contaminated by Oil 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Produced Fluid 15,449.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 301333

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2733197 Primary Facility 2018-05-21 Preoperation Inspection No Violations Noted Casey Baldwin and I performed a preop inspection on the Moore S pad. The perimeter BMPs were all in place and operational, despite recent torrential rains. The pad was under construction at the time of inspection. The RCE was in place as was the entrance culvert. The tank pad was not constructed yet however the perimeter BMPs were all installed. I approve this preoperational inspection. The wells associated with this site are the 115-22392- 115-22393, 115-22394 and 115-22395.

There were no violations.

2734686 Primary Facility 2018-05-23 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Larry Cheatwood. United Drilling was on site to drill and run the conductor pipe for the 2H, 4H, 6H and 8H wells. The 2H was at TD at 103'. There was an auger rig on the 4H at a depth of 20'. The 6H was at a depth of 46'. There was an air rig on the 8H at a depth of 84'. The TD for all the wells will be 103'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2745691 Primary Facility 2018-06-26 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Nabors X36 rig was on site and drilling the lateral section of the well. There are four wells on site to be drilled, the surface and intermediate casings have been drilled and set on all four wells. They are drilling the hole for the production casing on the first well out of the four. The proposed TD for the well is 20493'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2771564 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company men Steve Barrett and Larry Fulmer. Keane was on site to frac the 2H, 4H, 6H and 8H wells. They were stimulating stage 32 out of 66 stages on the 8H and running a plug and perf in the 4H when I arrived on site. There were 23 stages completed out of 59 on the 2H. There were 29 stages completed out of 67 on the 4H. There were 32 stages completed out of 70 on the 6H. The water was being trucked to the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2805970 Primary Facility 2018-11-21 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put in production. The well tag was on the well and correct. There was water 7.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. The production fluid was going to a 500bbl tank on containment and the containment appeared to be in good condition. There were 16 empty 500bbl tanks that were used during the frac, 12 of those tanks were cleaned and not on containment and the other 4 tanks were on containment and the containment appeared to be in good condition.

For data sources see[8]

References