X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22286

Well Details

Well ID: 37-115-22286
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jessup Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154188
Farm/Lease Name: TSOUROUS, A. 1
License Status:
Spud Date:
Permit Date: 2017-05-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.781783
Longitude: -75.934364

For data sources see[1][2][3]

Well History

Date Event
2017-05-01 New Permit Application
2017-07-28 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-17 2018-01-03 6,831 19,765,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Inhibitor, KAI-12 Keane Acid Inhibitor Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007903 148.898
formic acid 64-18-6 10 0.00007903 148.898
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000158054 297.796
Ethylene glycol 107-21-1 40 0.000316109 595.592
Cinnamaldehyde 104-55-2 10 0.00007903 148.898
isoproyl alcohol 67-63-0 5 0.00003951 74.449
Ethoxylated alcohol 68131-39-5 10 0.00007903 148.898
Biocide, MBC-516 Keane Biocide didecyldimethylammonium chloride 7173-51-5 8 0.00072684 1369.47
Water 7732-18-5 56.7 0.00517269 9746.07
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000484256 912.405
ethonal 64-17-5 2.8 0.000255352 481.118
Glutaral 111-30-8 26.7 0.00243496 4587.8
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.0020063 3780.15
Hydrochloric Acid 7647-01-0 15 0.0040126 7560.3
Friction Reducer, KFR-20 Keane Friction Reducer Water 7732-18-5 30 0.0301441 56795.6
Copolymer of 2-propenamide 69418-26-4 5 0.00502401 9465.93
oleic acid diethanolamide 93-83-4 1 0.0010048 1893.19
ammonium chloride 12125-02-9 30 0.0301441 56795.6
Petroleum distillate 64742-47-8 1 0.0010048 1893.19
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00502401 9465.93
Scale Inhibitor, KSI-19 Keane Scale Inhibitor Methanol 67-56-1 30 0.00548019 10325.4
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.299 23,173,000.0
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.5434 164,944,000.0
Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 30 0.000667021 1256.76
Acetic acid 64-19-7 5 0.00011117 209.46
Other Chemical(s) Listed Above See Trade Name(s) List Ethoxylated alcohol 68131-39-5 10 0.00007903 148.898
isoproyl alcohol 67-63-0 5 0.00003951 74.449
Citric acid 77-92-9 30 0.000667021 1256.76
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00502401 9465.93
oleic acid diethanolamide 93-83-4 1 0.0010048 1893.19
Glutaral 111-30-8 26.7 0.00243496 4587.8
ammonium chloride 12125-02-9 30 0.0301441 56795.6
formic acid 64-18-6 10 0.00007903 148.898
Petroleum distillate 64742-47-8 1 0.0010048 1893.19
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007903 148.898
ethonal 64-17-5 2.8 0.000255352 481.118
Water 7732-18-5 7.5 0.0020063 3780.15
Cinnamaldehyde 104-55-2 10 0.00007903 148.898
Copolymer of 2-propenamide 69418-26-4 5 0.00502401 9465.93
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000484256 912.405
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000158054 297.796
didecyldimethylammonium chloride 7173-51-5 8 0.00072684 1369.47

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 5,234,988.00 260 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 3,653,826.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 9.90 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Drill Cuttings 1,300.42 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 27.22 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 417.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 CABOT OIL & GAS CORP Produced Fluid 3.33 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 13,645.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 125.08 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 15.71 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 4,309.93 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.05 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Produced Fluid 4,801.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 0.27 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 63.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.38 Tons LANDFILL 101247

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2621148 Primary Facility 2017-07-31 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 11:35a.m. for a new spud inspection.

I met with Brett Wambold of Selman & Associates. United Drilling was on site to drill the holes and run the conductor pipe on the 1H, 2H, 3H, 4H, 6H, and 8H wells. The 3H, 4H and 8H were drilled to TD at 94'. There was a rig on the 1H and the 6H, the rig on the 1H was running 26 pipe to 25' and the rig on the 6H was at TD of 94' and started pulling drill pipe. The 2H was at a depth of 70'. All the conductor pipe will be run to 94' and cemented in. I took a walk around the location and there were no obvious concerns noticed. I left the site at 12:20p.m.

2626637 Primary Facility 2017-08-17 Preoperation Inspection No Violations Noted I performed a preoperational inspection for the Tsourous A well pad. The well pad had all perimeter E and S controls in place and was well under construction at the time of inspection. The site had received torrential rain the previous day but no BMPs were adversely affected. The site was stable and there was some preliminary growth on sections that have already been completed. The contractor, GDS, was actively working on the pad surface at the time of inspection. All topsoil piles were stable and mulched and/or seeded if not being actively worked on. The RCE was stable and solid and was not choked up with mud and debris. No sediment appeared to be leaving the site.

I therefore recommend approval of this preoperational inspection.. There were no violations noted at the time of inspection.

2638354 Primary Facility 2017-09-21 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Perk McDowell. Nabors X36 was drilling the hole for the production casing, they were still in the vertical section of the well. The surface and intermediate casings were cemented by Schlumberger with CemCrete cement. Proposed depth for the well is 15,300'. I took a walk around the location and there were no obvious concerns noticed. There were no violation noted.

2699010 Primary Facility 2018-02-27 Routine/Complete Inspection No Violations Noted At time of inspection.

I met with company men Steve Barrett and Ken Wilson. Keane was on site to frac the 1H, 2H, 3H, 4H, 6H, and 8H wells. They were just starting stage 22 out of 65 stages on the 2H when I arrived. The 1H and 3H were both completed with 48 stages. There were 21 stages completed out of 69 stages on the 4H. There were 22 stages completed out of 67 stages on the 6H. The 8H wasn't started yet but will have 32 stages when completed. I took a walk around the location there were no obvious concerns noticed. There were no violations noted.

2719960 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Tsourous well site on April 13, 2018 (Photo 1). The site had its last E&S inspection on April 13,2018 (Photo 16). The site had sediment being tracked from the site as well as running from the access road onto Lutz road. Lutz Road and Youngs Road were very muddy from truck traffic to the site and had a considerable amount of sediment pushed off the side (Photos 2, 18). This was in contrast to Lutz road beyond the access road to the well pad where the sediment was not nearly such a preponderance of sediment (Photo 17). The access road leading to the site was beset with problems. The entrance showed evidence of sediment leaving the site (Photo 2). The first culvert up the access road was occluded with sediment on both ends (Photo 4 and 5). There was also an unprotected topsoil pile near the entrance area (Photo 3). The slopes of the access road had sediment running off and accumulating around and beyond the filter sock BMPs (Photos 6,7,8,9,10). The sediment ran arou
2733234 Primary Facility 2018-05-21 Follow-up Inspection No Violations Noted I performed a follow up inspection of the Tsourous well site. The wells associated with this site are as follows: 115-22297, 115-22298, 115-22286, 115-22288, 115-22299, 115-22287. The areas of concern noted in the previous inspection have been addressed and repaired. There did not appear to be any additional erosional issues at the time of inspection. There were no violations noted.
2738295 Primary Facility 2018-06-06 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put in production. The well tag was on the well and correct. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. Fluid is going in a 500bbl flow back tank that is on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2765239 Primary Facility 2018-08-02 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:10. The weather conditions are cloudy skies, and breezy with light rain falling, with temperatures in the low to mid 70's as I arrived. Shortly after I arrived, light rain evolved into a moderate, steady rainfall. There was no activity or personnel at the site. All permitted wells listed on the Site ID sign are in production. I observed trash and debris scattered in some areas of the well pad and tank pad surface. The trash was most likely deposited on the ground surface of the site during completions operations, which have concluded in a relatively recent time frame. I departed from the site at 12:53.
2809096 Primary Facility 2018-11-29 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Tsourous well site. The well site is extensive and has a separate tank pad. The access road is quite long and steep but was plowed. The last E&S inspection was November 27, 2018.
    The weather was overcast and there was light snowfall the previous evening.  The  temperature was about 34 degrees.
    The road (Lutz Road) leading to the site was snowy and slushy.  There didn't appear to be any runoff along the roadside.
     The tank pad surface was snow covered and stable.  The infiltration basin, fill slope and topsoil pile all had good vegetation visible through the snow on them.  There didn't appear to be any erosional problems at the tank pad area.
    The well pad was expansive but had good growth on all slopes, visible through the snowcover.  The pad surface was mostly hard and partially plowed, with a few slushy areas.  The infiltration basin was mostly empty and appeared stable and growth was visible around it.  
    The wells were properly labeled and the
2835863 Primary Facility 2019-02-05 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was empty and there was no gas detected. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 1/2/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[8]

References