Well Details

Well ID: 37-115-22158
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Gibson Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 153474
Farm/Lease Name: JEFFERS FARMS 59
License Status:
Spud Date: 2016-12-12
Permit Date: 2016-02-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.787367
Longitude: -75.651706

For data sources see[1][2][3]

Well History

Date Event
Deviated
2016-02-02 New Permit Application
2016-12-04 Performed Spud Operation
2017-02-10 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-07 2017-09-28 7,132 18,976,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Cabot Carrier/Base Fluid Water 7732-18-5 100 88.7402 158,359,000.0
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.1096 19,825,500.0
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.00448034 7995.3
Water 7732-18-5 7.5 0.00224017 3997.65
Biocide, MBC-516 Keane Biocide Glutaral 111-30-8 26.7 0.0023952 4274.3
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000476349 850.058
didecyldimethylammonium chloride 7173-51-5 8 0.000714972 1275.89
ethonal 64-17-5 2.8 0.000251182 448.242
Water 7732-18-5 56.7 0.00508823 9080.09
Friction Reducer, KFR-20 Keane Friction Reducer Petroleum distillate 64742-47-8 1 0.000895084 1597.3
Water 7732-18-5 30 0.0268525 47919.1
ammonium chloride 12125-02-9 30 0.0268525 47919.1
Copolymer of 2-propenamide 69418-26-4 5 0.00447542 7986.52
oleic acid diethanolamide 93-83-4 1 0.000895084 1597.3
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00447542 7986.52
Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 30 0.000744778 1329.08
Acetic acid 64-19-7 5 0.00012413 221.513
Other Chemical(s) Listed Above See Trade Name(s) List dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000176474 314.922
oleic acid diethanolamide 93-83-4 1 0.000895084 1597.3
Copolymer of 2-propenamide 69418-26-4 5 0.00447542 7986.52
organic phosphonic salts 15827-60-8 15 0.0027671 4937.97
Glutaral 111-30-8 26.7 0.0023952 4274.3
ethonal 64-17-5 2.8 0.000251182 448.242
Petroleum distillate 64742-47-8 1 0.000895084 1597.3
formic acid 64-18-6 10 0.00008824 157.461
isoproyl alcohol 67-63-0 5 0.00004412 78.731
Ethoxylated alcohol 68131-39-5 10 0.00008824 157.461
Water 7732-18-5 7.5 0.00224017 3997.65
Citric acid 77-92-9 30 0.000744778 1329.08
Cinnamaldehyde 104-55-2 10 0.00008824 157.461
ammonium chloride 12125-02-9 30 0.0268525 47919.1
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000476349 850.058
didecyldimethylammonium chloride 7173-51-5 8 0.000714972 1275.89
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00008824 157.461
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00447542 7986.52
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Ethylene glycol 107-21-1 40 0.000352947 629.844
Ethoxylated alcohol 68131-39-5 10 0.00008824 157.461
Cinnamaldehyde 104-55-2 10 0.00008824 157.461
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00008824 157.461
formic acid 64-18-6 10 0.00008824 157.461
isoproyl alcohol 67-63-0 5 0.00004412 78.731
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000176474 314.922
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.017525 31273.8
organic phosphonic salts 15827-60-8 15 0.0027671 4937.97

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 1,359,368.67 74 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 4,699,006.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 2,324,436.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CABOT OIL & GAS CORP Synthetic Liner Materials 3.16 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Drill Cuttings 98.71 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 4.42 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 26.85 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Servicing Fluid 13.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.12 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 39.76 Tons REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Produced Fluid 1,964.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 19,149.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 5.20 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 12,868.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Soil Contaminated by Oil 4.42 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Drill Cuttings 1,242.23 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 4,433.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 0.18 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 3,359.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 2.18 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 2,162.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 368.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 2,347.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2524906 Primary Facility 2016-09-15 Routine/Complete Inspection No Violations Noted On 9/15/16, the Department conducted an inspection of the Jeffers Farms Pad 5 located in Gibson Township, Susquehanna County in response to Cabot’s self-reporting of a small spill of approximately 20 to 30 gallons of hydraulic fluid to the tank pad surface caused when a hydraulic line on a dump truck failed. Upon arriving at the site, a Resource Environmental Technician was on-site overseeing the remediation of the spill. The technician told me that they were revising their estimate of the spill down to 5 gallons based on the fact that when the hose was repaired on the dump truck, only 5 gallons of hydraulic fluid was added to the trucks hydraulic fluid reservoir. A review of what had been already excavated and what needed to be excavated suggests the 5 gallon estimate to be accurate. The Resource technician stated that they planned on using a PID to confirm their visual assessment of a successful remediation. A quick review of the overall pad found that all E&S controls to be in place and installed to
2529056 Primary Facility 2016-10-06 Preoperation Inspection No Violations Noted On 10/6/16, the Department was on site at the COG Jeffers Farms P5 Well Pad to conduct a Preoperational Inspection. The wells associated with this pad are the Jeffers Farms 50H, 51H, 52H, 53H, 55H, 57H, 59H, 61H, and the 63H. During the inspection, a cross culvert with an associated level spreader was identified near the entrance, but was not listed in the original site drawings. The culvert has been redlined onto the site plans as indicated in Photograph 1. The road to the well pads is a Township road (Jeffery Road T-507). The existing cross culvert (shown on Drawing ESCPC-02) was a 15” CMP that was removed and replaced with a 15” HDPE pipe during resurfacing of the road as required by the Township. The approval for the installation of the pipe was not requested as it already existed on the Township road and was required by the Township to be reinstalled. 2 large top soil stock piles have been added to the site drawings, 1 is between the well pad and the tank pad, while the 2nd one is just off of the w
2544332 Primary Facility 2016-12-12 Routine/Complete Inspection No Violations Noted On 12/12/16, the Department conducted an inspection of the Jeffers Farms Pad 5 located in Gibson Township, Susquehanna County in response to Cabot’s self-reporting of a small spill of approximately 10 gallons of compressor oil to the well pad surface caused when a valve on the compressor of one of the spudder rigs on-site was left open. When the compressor was fired up, the crew noted the release and shut down immediately. Upon arriving at the site, I met with Steve Watson, Cabot Senior EH&S Specialist. A Resource Environmental Technician was on-site overseeing the remediation of the spill. The Resource technician was utilizing a PID to evaluate and confirm remediation success. Approximately 20 yards of pad material has been removed thus far, with readings suggesting remediation is almost complete. During this inspection, another small spill occurred on the pad surface. A skid steer blew a hydraulic line near the well heads. Approximately 20 gallons of hydraulic fluid was released to the ground. Mr.
2544909 Primary Facility 2016-12-14 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 8:25a.m. for a new spud inspection, I met with company man James Cheek. United Drilling was on site to drill the holes and run the conductor pipe. The 51H and 57H were drilled to TD at 116' and the conductor pipe was being run in the hole. The 59H is drilled to TD at 116', they will pull the 26" pipe out of the hole and clean the hole of anything that fell in and then run the conductor pipe. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 8:50a.m.

2552330 Primary Facility 2017-01-11 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 14:30p.m., I met with company man Joel Frank, Precision Rig 548 was on site and skidding the rig over to the 61H well. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 15:25p.m.

2559671 Primary Facility 2017-02-07 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 9:35a.m., I met with company man Marcus Cormier, Precision Rig 548 was on site drilling the lateral section of the well for the production casing. I took a walk around the location and there were no obvious concerns noticed.

Depth at time of inspection was 7159'. Projected TD for the well is 14662'. I left the site at 10:30a.m.

2576731 Primary Facility 2017-03-29 Routine/Complete Inspection No Violations Noted Inspection conducted with Mike Pirner on 3/9/17 of the COG Jeffers Farms P5 Pad located in Gibson Township, Susquehanna County. Todays inspection is Cabots first communication to the Department that they would like to modify the access road in such a manor as would satisfy various entities ability to access properties adjacent to the Well site. This first field survey conducted by the Department did not reveal any obvious reason not to move forward with submitting proposed changes to the Department for review. Drilling rig actively drilling during inspection. No violations observed.
2616364 Primary Facility 2017-07-18 Routine/Complete Inspection No Violations Noted Resource environmental was on site overseeing the clean up. Field screening has been completed with all indications cleanup complete. 2 roll off containers of material have been placed in 2 covered roll off containers. 25 to 30 cubic yards of material has been collected. Overall conditions suggest the 30 gallon figure to be accurate. The Department concurred with Resource that the spill had been adequately cleaned up. No other violations were noted.
2635154 Primary Facility 2017-09-12 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company men Larry Fulmer and Ken Wilson. Keane was on site to frac the 50H, 51H, 52H, 53H, 55H, 57H, 59H, 61H, and 63H wells. They were on stage 6 out of 67 stages on the 52H well. There was 14 stages completed out of 63 on the 50H well. There was 3 stages completed out of 28 stages on the 51H well. There was 26 stages completed out of 28 stages on the 53H well. There was 26 stages completed out of 27 stages on the 55H well. There was 45 stages completed out of 48 stages on the 57H well. There was 45 stages completed out of 52 stages on the 59H well. The 61H well was completed with 55 stages and the 63H well was completed with53 stages. The water is being hauled in to the tank farm and pumped to the frac site. I took a walk around the location and tank farm and there were no obvious concerns noticed. There was no violation noted.

2669835 Primary Facility 2017-12-11 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put into production. The well tag was on the well and correct. The (20x13), (13x9) and (9x5) annulus vent pipes were connected together and venting to the same tank. There was a 500bbl flow back tank on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2773246 Primary Facility 2018-09-11 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 5.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2839813 Primary Facility 2019-02-13 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. As the photo's show, the site is snow covered. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted.

For data sources see[8]