X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22101

Well Details

Well ID: 37-115-22101
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Rush Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 152263
Farm/Lease Name: HOUSENICK J 4
License Status: Active
Spud Date: 2016-02-22
Permit Date: 2015-10-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.812872
Longitude: -76.075936

For data sources see[1][2][3]

Well History

Date Event
2015-10-28 New Permit Application
2016-02-22 Performed Spud Operation
2016-04-22 Drilling Completion
2016-08-10 Perforation
2016-09-13 Perforation
2016-09-13 Performed Stage 1 of Stimulation
2016-09-14 Perforation
2016-09-14 Performed Stage 2 of Stimulation
2016-09-14 Performed Stage 3 of Stimulation
2016-09-19 Perforation
2016-09-19 Performed Stage 4 of Stimulation
2016-09-20 Perforation
2016-09-20 Performed Stage 5 of Stimulation
2016-09-20 Performed Stage 6 of Stimulation
2016-09-21 Perforation
2016-09-21 Performed Stage 7 of Stimulation
2016-09-21 Performed Stage 8 of Stimulation
2016-09-22 Perforation
2016-09-22 Performed Stage 10 of Stimulation
2016-09-22 Performed Stage 9 of Stimulation
2016-09-23 Perforation
2016-09-23 Performed Stage 11 of Stimulation
2016-09-23 Performed Stage 12 of Stimulation
2016-09-24 Perforation
2016-09-24 Performed Stage 13 of Stimulation
2016-09-24 Performed Stage 14 of Stimulation
2016-09-25 Perforation
2016-09-25 Performed Stage 15 of Stimulation
2016-09-26 Perforation
2016-09-26 Performed Stage 16 of Stimulation
2016-09-26 Performed Stage 17 of Stimulation
2016-09-27 Perforation
2016-09-27 Performed Stage 18 of Stimulation
2016-09-27 Performed Stage 19 of Stimulation
2016-09-28 Perforation
2016-09-28 Performed Stage 20 of Stimulation
2016-09-29 Perforation
2016-09-29 Performed Stage 21 of Stimulation
2016-09-29 Performed Stage 22 of Stimulation
2016-09-30 Perforation
2016-09-30 Performed Stage 23 of Stimulation
2016-09-30 Performed Stage 24 of Stimulation
2016-10-01 Perforation
2016-10-01 Performed Stage 25 of Stimulation
2016-10-01 Performed Stage 26 of Stimulation
2016-10-02 Perforation
2016-10-02 Performed Stage 27 of Stimulation
2016-10-02 Performed Stage 28 of Stimulation
2016-10-03 Perforation
2016-10-03 Performed Stage 29 of Stimulation
2016-10-03 Performed Stage 30 of Stimulation
2016-10-04 Perforation
2016-10-04 Performed Stage 31 of Stimulation
2016-10-04 Performed Stage 32 of Stimulation
2016-10-05 Perforation
2016-10-05 Performed Stage 33 of Stimulation
2016-10-06 Perforation
2016-10-06 Performed Stage 34 of Stimulation
2016-10-06 Performed Stage 35 of Stimulation
2016-10-07 Perforation
2016-10-07 Performed Stage 36 of Stimulation
2016-10-07 Performed Stage 37 of Stimulation
2016-10-08 Perforation
2016-10-08 Performed Stage 38 of Stimulation
2016-10-08 Performed Stage 39 of Stimulation
2016-10-09 Perforation
2016-10-09 Performed Stage 40 of Stimulation
2016-10-10 Perforation
2016-10-10 Performed Stage 41 of Stimulation
2016-10-10 Performed Stage 42 of Stimulation
2016-10-11 Perforation
2016-10-11 Performed Stage 43 of Stimulation
2016-10-11 Performed Stage 44 of Stimulation
2016-10-12 Perforation
2016-10-12 Performed Stage 45 of Stimulation
2016-10-12 Performed Stage 46 of Stimulation
2016-10-13 Perforation
2016-10-13 Performed Stage 47 of Stimulation
2016-10-14 Perforation
2016-10-14 Performed Stage 48 of Stimulation
2016-10-14 Performed Stage 49 of Stimulation
2016-10-14 Performed Stage 50 of Stimulation
2017-01-23 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-12 2016-10-13 6,314 18,255,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Other Chemical(s) Listed Above See Trade Name(s) List ammonium chloride 12125-02-9 30 0.0276596 47470.3
Water 7732-18-5 7.5 0.00223942 3843.38
Prop-2-yn-1-ol 107-19-7 10 0.00008836 151.645
Petroleum distillate 64742-47-8 1 0.000921985 1582.34
Citric acid 77-92-9 30 0.000743391 1275.83
methanol 67-56-1 1 0.00018884 324.093
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000471718 809.579
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00460993 7911.71
Glutaral 111-30-8 26.7 0.00237192 4070.77
oleic acid diethanolamide 93-83-4 1 0.000921985 1582.34
Potassium iodide 7681-11-0 5 0.00004418 75.823
Copolymer of 2-propenamide 69418-26-4 5 0.00460993 7911.71
didecyldimethylammonium chloride 7173-51-5 8 0.000708022 1215.13
organic phosphonic acids salts Proprietary 5 0.000944198 1620.46
ethonal 64-17-5 2.8 0.000248741 426.897
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000123899 212.639
Citric acid 77-92-9 30 0.000743391 1275.83
Friction Reducer, KFR-20 Keane Friction Reducer ammonium chloride 12125-02-9 30 0.0276596 47470.3
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00460993 7911.71
Copolymer of 2-propenamide 69418-26-4 5 0.00460993 7911.71
Water 7732-18-5 30 0.0276596 47470.3
oleic acid diethanolamide 93-83-4 1 0.000921985 1582.34
Petroleum distillate 64742-47-8 1 0.000921985 1582.34
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.00447885 7686.75
Water 7732-18-5 7.5 0.00223942 3843.38
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 88.7634 152,339,000.0
Scale Inhibitor, KLSI-20 Keane Scale Inhibitor Water 7732-18-5 30 0.00566519 9722.79
organic phosphonic acids salts Proprietary 5 0.000944198 1620.46
methanol 67-56-1 1 0.00018884 324.093
Acid Inhibitor, KAI-11 Keane Acid Inhibitor Potassium iodide 7681-11-0 5 0.00004418 75.823
Prop-2-yn-1-ol 107-19-7 10 0.00008836 151.645
Propargyl alcohol derivative Proprietary 100 0.000883594 1516.45
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.0834 19,021,800.0
Biocide, MBC-516 Keane Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000471718 809.579
Proprietary Proprietary 56.7 0.00503877 8647.71
didecyldimethylammonium chloride 7173-51-5 8 0.000708022 1215.13
ethonal 64-17-5 2.8 0.000248741 426.897
Glutaral 111-30-8 26.7 0.00237192 4070.77

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-09-13 1 SAND, WHITE 674,678 7,382 8,032
2016-09-14 2 SAND, WHITE 674,678 7,692 5,511
2016-09-14 3 SAND, WHITE 674,678 7,627 7,063
2016-09-19 4 SAND, WHITE 674,678 7,530 5,528
2016-09-20 5 SAND, WHITE 674,678 8,261 6,401
2016-09-20 6 SAND, WHITE 674,678 7,464 6,732
2016-09-21 7 SAND, WHITE 674,678 7,748 6,026
2016-09-21 8 SAND, WHITE 674,678 7,908 7,198
2016-09-22 9 SAND, WHITE 674,678 7,849 7,179
2016-09-22 10 SAND, WHITE 674,678 8,326 6,583
2016-09-23 11 SAND, WHITE 674,678 7,657 6,652
2016-09-23 12 SAND, WHITE 674,678 7,471 7,225
2016-09-24 13 SAND, WHITE 674,678 7,290 7,035
2016-09-24 14 SAND, WHITE 674,678 7,331 7,277
2016-09-25 15 SAND, WHITE 674,678 7,401 5,968
2016-09-26 16 SAND, WHITE 674,678 7,721 7,168
2016-09-26 17 SAND, WHITE 674,678 7,493 6,351
2016-09-27 18 SAND, WHITE 674,678 7,326 6,545
2016-09-27 19 SAND, WHITE 674,678 7,224 6,394
2016-09-28 20 SAND, WHITE 674,678 7,463 6,768
2016-09-29 21 SAND, WHITE 674,678 7,404 6,600
2016-09-29 22 SAND, WHITE 674,678 7,363 6,200
2016-09-30 23 SAND, WHITE 674,678 8,147 6,946
2016-09-30 24 SAND, WHITE 674,678 7,330 6,778
2016-10-01 25 SAND, WHITE 674,678 7,115 6,167
2016-10-01 26 SAND, WHITE 674,678 6,765 5,477
2016-10-02 27 SAND, WHITE 674,678 7,210 6,805
2016-10-02 28 SAND, WHITE 674,678 6,889 7,005
2016-10-03 29 SAND, WHITE 674,678 7,072 6,673
2016-10-03 30 SAND, WHITE 674,678 7,159 7,385
2016-10-04 31 SAND, WHITE 674,678 6,829 6,552
2016-10-04 32 SAND, WHITE 674,678 7,135 7,067
2016-10-05 33 SAND, WHITE 674,678 6,799 6,087
2016-10-06 34 SAND, WHITE 674,678 6,922 6,771
2016-10-06 35 SAND, WHITE 674,678 6,740 6,570
2016-10-07 36 SAND, WHITE 674,678 6,739 6,555
2016-10-07 37 SAND, WHITE 674,678 6,756 6,707
2016-10-08 38 SAND, WHITE 674,678 6,746 6,533
2016-10-08 39 SAND, WHITE 674,678 6,681 6,493
2016-10-09 40 SAND, WHITE 674,678 6,490 5,864
2016-10-10 41 SAND, WHITE 674,678 6,960 6,191
2016-10-10 42 SAND, WHITE 674,678 6,670 5,854
2016-10-11 43 SAND, WHITE 674,678 6,055 5,299
2016-10-11 44 SAND, WHITE 674,678 5,830 4,838
2016-10-12 45 SAND, WHITE 674,678 5,914 5,679
2016-10-12 46 SAND, WHITE 674,678 6,057 6,491
2016-10-13 47 SAND, WHITE 674,678 6,294 6,314
2016-10-14 48 SAND, WHITE 674,678 6,263 6,128
2016-10-14 49 SAND, WHITE 674,678 6,215 6,446
2016-10-14 50 SAND, WHITE 674,678 5,549 5,644

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 CABOT OIL & GAS CORP 1,828,289.11 70 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 7,599,508.82 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 4,909,587.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 3,649,768.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CABOT OIL & GAS CORP Synthetic Liner Materials 34.74 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.13 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 37,940.09 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Drill Cuttings 1,224.74 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 5,020.21 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 CABOT OIL & GAS CORP Produced Fluid 727.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 CABOT OIL & GAS CORP Produced Fluid 4,837.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 1.90 Tons LANDFILL 301358
2017 CABOT OIL & GAS CORP Produced Fluid 1,042.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 6.20 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 4,501.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 31.16 Tons LANDFILL 100933
2018 CABOT OIL & GAS CORP Produced Fluid 468.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 383.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 4.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Produced Fluid 349.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2452463 Primary Facility 2016-02-23 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 12:50 p.m., United Drilling was on site; I met with company man Mark Talarico and Selman representative Brett Wambold. There were two rigs drilling the holes for the conductor pipe, one rig was drilling the 4H which was at 81' and the other one was drilling the 3H which was at 23'. Mark and Brett said they should be cementing the conductor pipes on the 1H, 3H and 4H on 2/26/16. I took a walk around the location and everything looked OK.

I left the site at 13:30 p.m.

2463566 Primary Facility 2016-03-08 Incident- Response to Accident or Event No Violations Noted Cabot removed an approximate 12-15 cubic yards of material at the time the Department arrived. They stated that the machine sat from the time of the release until the morning of 3/8/16, when they were able to fix and then move it. It was reported that the bulldozer’s hose clamp broke and the hose disconnected from the reservoir. The tank was described as having a 15.8 gallon capacity. Cabot Oil & Gas presumes that they lost almost the entire volume of the tank, which is how they estimated the 15 gallons. The Department observed the excavation and noted that it appeared as though there was some remaining product floating on the water in the excavation. Violations associated with this inspection have been attached to Site ID# 785492.
2476041 Primary Facility 2016-04-18 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 12:45 p.m., Precision Rig 548 was on site drilling the hole for the production casing. I met with company man Perk McDowell, Weatherford wire line was running a wire line in the vertical section of the well. I took a walk around the location and everything looked OK.

Depth at time of inspection was 5148'. Projected TD is 16450' I left the site at 2:00 p.m.

2520331 Primary Facility 2016-09-15 Drilling/Alteration No Violations Noted
2657068 Primary Facility 2017-11-06 Routine/Complete Inspection No Violations Noted While out inspecting the Rigsby pipeline, I did a quick inspection on the Housenick well site. The site and access road were solid and stable with no erosional issues noted. The vegetation was healthy and sufficient.

There were no issues noted

2725855 Primary Facility 2018-05-02 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Housenick well site. The wells associated with this site are as follows: 115-22096, 115-22100, 115-22101. The wells were properly labeled.

The access road and pad surfaces were solid and stable.

The cut and fill slopes were well vegetated and were stable. There were no erosional issues apparent.

There were no violations.

For data sources see[9]

References