37-115-22077

Well Details

Well ID: 37-115-22077
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Gibson Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 152997
Farm/Lease Name: ROMEIKA J 1
License Status:
Spud Date:
Permit Date: 2015-10-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.797544
Longitude: -75.623247

For data sources see[1][2][3]

Well History

Date Event
2015-10-01 New Permit Application
2016-09-25 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-26 2017-08-01 7,293 18,829,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000125246 221.463
Citric acid 77-92-9 30 0.000751474 1328.78
Other Chemical(s) Listed Above See Trade Name(s) List dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00017806 314.851
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00008903 157.426
Citric acid 77-92-9 30 0.000751474 1328.78
didecyldimethylammonium chloride 7173-51-5 8 0.000716033 1266.11
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000477056 843.544
Cinnamaldehyde 104-55-2 10 0.00008903 157.426
ammonium chloride 12125-02-9 30 0.0259639 45910.2
Petroleum distillate 64742-47-8 1 0.000865464 1530.34
isoproyl alcohol 67-63-0 5 0.00004452 78.713
formic acid 64-18-6 10 0.00008903 157.426
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00432732 7651.7
oleic acid diethanolamide 93-83-4 1 0.000865464 1530.34
Copolymer of 2-propenamide 69418-26-4 5 0.00432732 7651.7
Glutaral 111-30-8 26.7 0.00239876 4241.55
ethonal 64-17-5 2.8 0.000251555 444.807
Water 7732-18-5 7.5 0.00226031 3996.75
Ethoxylated alcohol 68131-39-5 10 0.00008903 157.426
organic phosphonic salts 15827-60-8 15 0.00271158 4794.7
Friction Reducer, KFR-20 Keane Friction Reducer oleic acid diethanolamide 93-83-4 1 0.000865464 1530.34
Petroleum distillate 64742-47-8 1 0.000865464 1530.34
ammonium chloride 12125-02-9 30 0.0259639 45910.2
Copolymer of 2-propenamide 69418-26-4 5 0.00432732 7651.7
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00432732 7651.7
Water 7732-18-5 30 0.0259639 45910.2
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 88.8647 157,133,000.0
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.00452062 7993.5
Water 7732-18-5 7.5 0.00226031 3996.75
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00271158 4794.7
Water 7732-18-5 95 0.0171734 30366.5
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 10.9882 19,429,700.0
Acid Inhibitor, KAI-12 Keane Acid Inhibitor dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00017806 314.851
Cinnamaldehyde 104-55-2 10 0.00008903 157.426
Ethylene glycol 107-21-1 40 0.00035612 629.702
isoproyl alcohol 67-63-0 5 0.00004452 78.713
Ethoxylated alcohol 68131-39-5 10 0.00008903 157.426
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00008903 157.426
formic acid 64-18-6 10 0.00008903 157.426
Biocide, MBC-516 Keane Biocide ethonal 64-17-5 2.8 0.000251555 444.807
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000477056 843.544
didecyldimethylammonium chloride 7173-51-5 8 0.000716033 1266.11
Glutaral 111-30-8 26.7 0.00239876 4241.55
Water 7732-18-5 56.7 0.00509578 9010.52

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 2,195,113.35 139 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 4,074,151.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 2,403,535.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CABOT OIL & GAS CORP Synthetic Liner Materials 1.29 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 20.57 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.09 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 78.97 Tons REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Produced Fluid 5,720.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 19,247.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 7.64 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 4,336.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Drill Cuttings 1,549.11 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 340.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 0.43 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 2.61 Tons LANDFILL 100933
2018 CABOT OIL & GAS CORP Produced Fluid 3,922.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 0.28 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 0.05 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil 0.05 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil 2.61 Tons LANDFILL 100933
2018 CABOT OIL & GAS CORP Produced Fluid 2,341.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 425.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 2,418.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.06 Tons LANDFILL 101247

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2493833 Primary Facility 2016-06-08 Preoperation Inspection No Violations Noted On 6/8/16, the Department was on site at the COG Romeika, J. Pad 1 to conduct a Preoperational Inspection. The well permits that have been issued for this site are the Romeika 1H (115-22077), 2H (115-22078), 4H (115-22089), 6H (115-22090), and the 8H (115-22091). All perimeter BMP’s in place. Good temporary vegetative cover exists. E & S inspections up-to-date. No well drilling has occurred on the pad. Overall, the site looks good. No violations noted.
2524690 Primary Facility 2016-09-28 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 13:00p.m. for a new spud inspection, I met with company man James Cheek, United Drilling was on site to drill the holes and run the conductor pipe. The 1H was drilled to TD at 149' and the conductor pipe was run in the hole. There was a rig on the 2H and the 6H, the 2H was at 116' and the 6H was at 22', they will be drilled and the conductor pipe set at 149'. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 13:40p.m.

2565656 Primary Facility 2017-02-27 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 9:15a.m.

I met with company man Tony Ketterling. Nabors Rig X36 was on site and drilling the lateral section of the well. They lost circulation at 5597' and were running a pill to try and get circulation back. I took a walk around the location and there were no obvious concerns noticed. Depth at time of inspection was 5597' Projected TD for the well is 14,765' I left the site at 11:15a.m.

2617074 Primary Facility 2017-07-18 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:45p.m.

I met with company men Larry Fulmer and Mike Vollmer. Keanes was on site to stimulate the 1H, 2H, 4H, 6H, and 8H wells. They were shut down to have a brace repaired on the frac missile. The 1H had 33 stages out of 51 completed. The 2H had 30 stages out of 41 completed. The 4H had 25 stages out of 48 completed. The 6H had 32 stages out of 65 completed. The 8H had 33 stages out of 69 completed. I took a walk around the location and there were no obvious concerns noticed. I left the site at 13:35p.m.

2643704 Primary Facility 2017-10-04 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently stimulated and put into production. The well tag is on the well and correct. All the annulus vent pipes are connected together and going to the same tank. The production fluid is going into a 500bbl flow back tank that is on containment and the containment appears to be in good condition. The 500bbl frac tanks are still on site and on containment. They are empty and the man holes are open. The containment appears to be in good condition. There were no obvious concerns noticed. There were no violations noted.

2682175 Primary Facility 2018-01-08 Routine/Complete Inspection No Violations Noted Today's inspection is being conducted as a routine inspection. All 5 wells, the 1H, 2H, 4H, 6H, and the 8H appear to be in production. Site appears to be stable. No spills detected. No violations noted.
2692632 Primary Facility 2018-02-08 Routine/Complete Inspection No Violations Noted Inspection conducted as a routine inspection. No E&S violations noted. No violations noted.
2723021 Primary Facility 2018-04-11 Incident- Response to Accident or Event No Violations Noted Gene Rickard, DEP O&G WQS and I arrived at the site at 11:14 in response to a reported spill of (5-7) gallons of production fluid to the pad surface. As we arrived there was no activity or personnel at the site. The weather conditions are mostly cloudy, cold and breezy with temperatures in the 30's. All wells on the pad are in production. We observed a Diaz container covered with a liner made of plastic material and a (55) gallon capacity drum labeled "Romeika 4/11/18 Brine Gravel GDS" on the pad surface near the production fluid and storm water tanks containment structure. In addition to observing the containers, we were able to determine that the location of the area on the pad surface remediated due to the spill was near the production fluid and storm water tanks containment structure. I conducted specific conductance (conductivity) screening of damp pad surface pad material just outside of the perimeter of the excavation of the impacted area near yellow sand bags, near the center of the excavation, storm
2726595 Primary Facility 2018-04-12 Follow-up Inspection No Violations Noted I arrived at the site at 12:57. Rain was falling with temperatures around 50 degrees Fahrenheit. Steve Catalfamo, Professional Geologist and Senior Environmental Health and Safety Specialist of Cabot Oil and Gas accompanied me during the inspection. The intent of the follow up inspection was to conduct field soil specific conductance (conductivity) screening in the general area on the pad surface where the production fluid spill occurred on 4/9/18. During an inspection at the site on 4/11/18, I recorded (3.02) millisiemens/cm conductivity in damp soil just outside the section of the pad surface remediated as a result of the spill. It had appeared as if the spill had not been adequately remediated. Conductivity was in the range of (0.5 -1.0) millisiemens/cm on 4/12/18 in the location where I recorded (3.02) milllisiemens/cm. The impacted area was backfilled with clean fill yesterday according to Mr. Catalfamo. Conductivity readings on my meter where less than (100) microsiemens/cm in the area backfilled. See
2739142 Primary Facility 2018-06-04 Administrative/File Review No Violations Noted This administration inspection report has been created to document a spill of an estimated (5-7) gallons of production fluid to the pad surface which occurred on 4/9/18 as documented in the Department's 4/11/18 and 4/12/18 inspection reports, Inspection ID #'s 2721248 and 2725656. Cabot submitted a Remediation Summary Report prepared by Resource Environmental of Montrose, PA to the Department on 5-23-18. The report contains a description of the incident, summary of remediation and characterization activities, waste disposal information, a site location map, a site map displaying the perimeter of the excavation, final soil conductivity screenings on 4/10/18, additional soil conductivity screenings on 4/13/18 and disposal documents of gravel impacted with produced fluids transported to Waste Recovery Solutions in Myerstown, PA.

The Description of the incident states the following information." At approximately 20:30 hours on April 9, 2018, a GasSearch Drilling Services Corporation (GDS) residual waste vacu

2749797 Primary Facility 2018-07-09 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 6.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2851340 Primary Facility 2019-03-11 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water and ice 6' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 3/4/19. There was an empty 500bbl tank on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[8]