X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22004

Well Details

Well ID: 37-115-22004
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Gibson Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 152558
Farm/Lease Name: BOLCATO G 6
License Status: Active
Spud Date: 2015-07-07
Permit Date: 2015-05-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.769081
Longitude: -75.608314

For data sources see[1][2][3]

Well History

Date Event
2015-05-14 New Permit Application
2015-07-07 Performed Spud Operation
2015-08-05 New Permit Application
2015-08-18 Drilling Completion
2016-08-01 Perforation
2016-09-01 Perforation
2016-09-01 Performed Stage 1 of Stimulation
2016-09-02 Performed Stage 2 of Stimulation
2016-09-03 Perforation
2016-09-03 Performed Stage 3 of Stimulation
2016-09-04 Perforation
2016-09-04 Performed Stage 4 of Stimulation
2016-09-05 Perforation
2016-09-05 Performed Stage 5 of Stimulation
2016-09-06 Perforation
2016-09-06 Performed Stage 6 of Stimulation
2016-09-07 Perforation
2016-09-07 Performed Stage 7 of Stimulation
2016-09-08 Perforation
2016-09-08 Performed Stage 8 of Stimulation
2016-09-09 Perforation
2016-09-09 Performed Stage 9 of Stimulation
2016-09-10 Perforation
2016-09-10 Performed Stage 10 of Stimulation
2016-09-11 Perforation
2016-09-11 Performed Stage 11 of Stimulation
2016-09-12 Perforation
2016-09-12 Performed Stage 12 of Stimulation
2016-09-13 Perforation
2016-09-13 Performed Stage 13 of Stimulation
2016-09-14 Perforation
2016-09-14 Performed Stage 14 of Stimulation
2016-09-15 Perforation
2016-09-15 Performed Stage 15 of Stimulation
2016-09-16 Perforation
2016-09-16 Performed Stage 16 of Stimulation
2016-09-17 Performed Stage 17 of Stimulation
2016-09-18 Perforation
2016-09-18 Performed Stage 18 of Stimulation
2016-09-19 Perforation
2016-09-19 Performed Stage 19 of Stimulation
2016-09-20 Perforation
2016-09-20 Performed Stage 20 of Stimulation
2016-09-21 Perforation
2016-09-21 Performed Stage 21 of Stimulation
2016-09-22 Perforation
2016-09-22 Performed Stage 22 of Stimulation
2016-09-23 Perforation
2016-09-23 Performed Stage 23 of Stimulation
2016-09-24 Perforation
2016-09-24 Performed Stage 24 of Stimulation
2016-09-25 Performed Stage 25 of Stimulation
2016-09-26 Perforation
2016-09-27 Perforation
2016-09-27 Performed Stage 26 of Stimulation
2016-09-28 Perforation
2016-09-28 Performed Stage 27 of Stimulation
2016-09-29 Perforation
2016-09-29 Performed Stage 28 of Stimulation
2016-09-30 Perforation
2016-09-30 Performed Stage 29 of Stimulation
2016-10-01 Perforation
2016-10-01 Performed Stage 30 of Stimulation
2016-10-03 Perforation
2016-10-03 Performed Stage 31 of Stimulation
2016-10-04 Performed Stage 32 of Stimulation
2016-10-05 Perforation
2016-10-05 Performed Stage 33 of Stimulation
2016-10-06 Perforation
2016-10-06 Performed Stage 34 of Stimulation
2016-10-07 Perforation
2016-10-07 Performed Stage 35 of Stimulation
2016-10-08 Perforation
2016-10-08 Performed Stage 36 of Stimulation
2016-10-08 Performed Stage 37 of Stimulation
2016-10-09 Perforation
2016-10-09 Performed Stage 38 of Stimulation
2016-10-10 Perforation
2016-10-10 Performed Stage 39 of Stimulation
2016-10-11 Perforation
2016-10-11 Performed Stage 40 of Stimulation
2016-10-12 Perforation
2016-10-12 Performed Stage 41 of Stimulation
2016-10-13 Perforation
2016-10-13 Performed Stage 42 of Stimulation
2016-10-14 Perforation
2016-10-14 Performed Stage 43 of Stimulation
2016-10-14 Performed Stage 44 of Stimulation
2016-10-15 Perforation
2016-10-15 Performed Stage 45 of Stimulation
2016-10-15 Performed Stage 46 of Stimulation
2017-01-25 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-08-31 2016-10-14 7,157 19,729,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sodium Chloride 7647-14-5 5 0.00478 8995.29
Ethylene Glycol 107-21-1 45 0.0065915 12404.2
Sorbitan Monooleate 1338-43-8 0.5 0.0004628 870.961
Didecyl Dimethyl Ammonium Chloride 7173-51-5 10 0.0021877 4116.88
Ammonium Chloride 12125-02-9 3 0.0027769 5225.77
Polyoxyalkylenes 68951-67-7 30 0.000111 208.8
Calcium Chloride 10043-52-4 5 0.0005191 976.819
Methanol 67-56-1 100 0.0003698 696
Potassium Chloride 7447-40-7 1 0.0001038 195.364
Modified carboxylic acid salt Trade Secret 17 0.0008159 1535.43
Crystalline Silica (Quartz) 14808-60-7 100 12.2017 22,961,700.0
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.0018513 3483.84
Phosphonate Salt Trade Secret 2 0.00009600 180.639
Oleamide DEA 93-83-4 2 0.0018513 3483.84
Ethanol 64-17-5 5 0.0010938 2058.44
Modified Thiourea Polymer 68527-49-1 7 0.00002590 48.72
Hydrochloric Acid 7647-01-0 15 0.0350884 66031
Polyoxythylene Sorbitan Monooleate 9005-65-6 0.5 0.0004628 870.961
Olefin 64743-02-8 5 0.00001850 34.8
Propargyl Alcohol 107-19-7 5 0.00001850 34.8
Poly (acrylamide-co-acrylic acid) partial sodium salt 62649-23-4 30 0.0277694 52257.7
Quaternary Ammonium Compound 68424-85-1 5 0.0010938 2058.44
Citric Acid 77-92-9 60 0.0009647 1815.37
Glutaraldehyde 111-30-8 30 0.006563 12350.6
Sodium Bisulfite 7631-90-5 1 0.00004800 90.3196
Formaldehyde 50-00-0 1 0.00000370 6.96
Hydrotreated Light Distillate 64742-47-8 30 0.0277694 52257.7
Fatty Acids 61790-12-3 10 0.00003700 69.6
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt 71050-62-9 20 0.0020763 3907.28
Water Operator Carrier Water 7732-18-5 100 87.4157 164,503,000.0
Sand, White, 100 mesh Baker Hughes Proppant MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.505898 951859
Scaletrol 720, 330 gl tote Baker Hughes Scale Inhibitor MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.0103832 19536.4
CI-14 Baker Hughes Corrosion Inhibitor MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.0003699 696
Alpha 1427, 55 gl drum Baker Hughes Biocide MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.0218805 41168.8
Scaletrol 5279 Baker Hughes Scale Inhibitor MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.0048003 9031.96
Sand, White, 40/70 Baker Hughes Proppant MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 11.6979 22,009,900.0
Ferrotrol 300L (Totes) Baker Hughes Iron Control MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.0016081 3025.62
FRW-18 Baker Hughes Friction Reducer MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.09258 174192
HCl, 10.1 - 15% Baker Hughes Acidizing MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.233938 440160
Other Chemical(s) Baker Hughes See Trade Name(s) List Water 7732-18-5 85 0.257075 483776

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-09-01 1 SAND, WHITE 2,532 10,726 6,798
2016-09-02 2 SAND, WHITE 2,532 9,596 6,907
2016-09-03 3 SAND, WHITE 2,532 9,163 6,198
2016-09-04 4 SAND, WHITE 2,532 9,362 6,736
2016-09-05 5 SAND, WHITE 2,532 9,246 8,002
2016-09-06 6 SAND, WHITE 2,532 9,419 7,836
2016-09-07 7 SAND, WHITE 2,532 9,744 6,594
2016-09-08 8 SAND, WHITE 2,532 9,298 6,786
2016-09-09 9 SAND, WHITE 2,532 9,257 7,154
2016-09-10 10 SAND, WHITE 2,532 9,292 7,839
2016-09-11 11 SAND, WHITE 2,532 9,552 7,621
2016-09-12 12 SAND, WHITE 2,532 9,181 7,099
2016-09-13 13 SAND, WHITE 2,532 9,333 8,085
2016-09-14 14 SAND, WHITE 2,532 8,959 7,532
2016-09-15 15 SAND, WHITE 2,532 8,819 7,466
2016-09-16 16 SAND, WHITE 2,532 8,949 7,084
2016-09-17 17 SAND, WHITE 2,532 9,120 6,598
2016-09-18 18 SAND, WHITE 2,532 9,181 6,649
2016-09-19 19 SAND, WHITE 2,532 9,160 6,727
2016-09-20 20 SAND, WHITE 2,532 8,961 6,626
2016-09-21 21 SAND, WHITE 2,532 9,072 6,328
2016-09-22 22 SAND, WHITE 2,532 8,888 6,937
2016-09-23 23 SAND, WHITE 2,532 9,117 6,937
2016-09-24 24 SAND, WHITE 2,532 8,785 7,019
2016-09-25 25 SAND, WHITE 2,532 8,626 7,131
2016-09-27 26 SAND, WHITE 2,532 8,475 6,797
2016-09-28 27 SAND, WHITE 2,532 10,354 7,941
2016-09-29 28 SAND, WHITE 2,532 8,155 5,907
2016-09-30 29 SAND, WHITE 2,532 8,323 6,970
2016-10-01 30 SAND, WHITE 2,532 8,683 7,654
2016-10-03 31 SAND, WHITE 2,532 8,279 6,961
2016-10-04 32 SAND, WHITE 2,532 8,335 7,122
2016-10-05 33 SAND, WHITE 2,532 8,233 6,720
2016-10-06 34 SAND, WHITE 2,532 8,039 6,622
2016-10-07 35 SAND, WHITE 2,532 8,058 7,040
2016-10-08 36 SAND, WHITE 2,532 8,275 7,528
2016-10-08 37 SAND, WHITE 2,532 8,554 6,293
2016-10-09 38 SAND, WHITE 2,532 8,007 6,271
2016-10-10 39 SAND, WHITE 2,532 7,967 6,140
2016-10-11 40 SAND, WHITE 2,532 8,067 7,049
2016-10-12 41 SAND, WHITE 2,532 7,812 6,262
2016-10-13 42 SAND, WHITE 2,532 7,552 6,781
2016-10-14 43 SAND, WHITE 2,532 7,491 6,708
2016-10-14 44 SAND, WHITE 2,532 7,150 7,664
2016-10-15 45 SAND, WHITE 2,532 7,031 6,989
2016-10-15 46 SAND, WHITE 2,532 6,582 5,196

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 1,462,372.13 56 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 6,208,471.56 350 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 3,150,752.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,986,290.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CABOT OIL & GAS CORP Drilling Fluid Waste 22.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 CABOT OIL & GAS CORP Drill Cuttings 1,576.99 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 11,383.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 3,433.94 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016 CABOT OIL & GAS CORP Other Oil & Gas Wastes 59.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Soil Contaminated by Oil 15.17 Tons LANDFILL THR029
2016 CABOT OIL & GAS CORP Synthetic Liner Materials 17.08 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 22.69 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CABOT OIL & GAS CORP Other Oil & Gas Wastes 408.80 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 15.17 Tons LANDFILL THR029
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 13,587.56 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016 CABOT OIL & GAS CORP Produced Fluid 3,918.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.10 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Produced Fluid 2,274.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Other Oil & Gas Wastes 41.00 Bbl REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Produced Fluid 11,574.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017 CABOT OIL & GAS CORP Soil Contaminated by Oil 0.04 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 0.04 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 2.46 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 2.46 Tons REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Other Oil & Gas Wastes 2.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017 CABOT OIL & GAS CORP Produced Fluid 5,680.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 46.36 Tons LANDFILL THR029
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 33.69 Tons LANDFILL 100933
2018 CABOT OIL & GAS CORP Produced Fluid 4,087.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 656.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 1,548.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 506.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 3,550.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2389959 Primary Facility 2015-07-01 Preoperation Inspection No Violations Noted On 7/1/15, the Department conducted a Preoperational inspection of the Cabot Bolcato G Pad located in Gibson Township, Susquehanna County. The well pad is approximately 95% complete with all E&S BMP’s installed per plan. No construction has been done on the tank pad. The tank pad is not going to be built. The plan for water delivery to this location is to pipe water from the nearby Aldrich Pad. All filter sock controls have been installed for the tank pad. Crews actively repairing minor damage that recent heavy rains have caused. No violations noted. The well permits that have been issued for the pad are: Bolcato G. 3H(115-22015), 5H(115-22016), 6H(115-22004), 8H(115-22005), and the 10H(115-22006).
2390895 Primary Facility 2015-07-20 Drilling/Alteration No Violations Noted
2403183 Primary Facility 2015-08-31 Routine/Complete Inspection No Violations Noted
2404901 Primary Facility 2015-09-04 Routine/Complete Inspection No Violations Noted
2480580 Primary Facility 2016-05-03 Routine/Complete Inspection No Violations Noted
2518339 Primary Facility 2016-09-12 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:15p.m., Baker Hughes was the frack company on site to frack the wells. I met with company man Mike Vollmer. They just completed stage 13 and were running the plug and perforations on the 10H. I took a walk around the location and everything looked OK.

They have completed 0 out of 27 stages on the 2H, 13 out of 38 stages on the 5H, 13 out of 46 stages on the 6H, 12 out of 43 stages on the 8H, and 13 out of 39 stages on the 10H. All the water was being hauled in and pumped into tanks near the site entrance and then pumped through a poly line to a larger set of tanks on the other side of the site. All the tanks were on containment and the containment was in good condition. I left the site at 14:10p.m.

2538773 Primary Facility 2016-10-18 Routine/Complete Inspection No Violations Noted I arrived at the site at 11 AM. I initially met with Paul Hovan, Environmental Consultant of Tioga Environmental Consulting LLC. Williams was in preparation to install natural gas pipeline from this pad to the nearby Gibson pipeline according to Mr. Hovan. After talking to Mr. Hovan, I met with Heath Benton, site company completions consultant of Cabot, Mark Miller, consultant of Cabot and Johnny Crawford, Workover Superintendent of Cabot in the company man trailer. Mr. Denton stated the following. "There are (2) Cudd Energy services coil tubing units in the process of drilling out frac plugs on the 2H and 10H wells. They started last Thursday. The frac job was done on Friday. There will be (26) plugs drilled out on the 2H and (26) on the 10H well. Freshwater, recycled water left over from the frac, gel and friction reducer is used in the wells to drill the plugs out. Fluid flows out of the wells, goes through plug catchers, and then to gas buster tanks and then settles in frac tanks. The frac plugs
2539224 Primary Facility 2016-11-16 Incident- Response to Accident or Event No Violations Noted The Department, Briana Cunningham, DEP O&G WQS and I arrived at the site at 11:30 AM to conduct an investigation of the spill incident.

The Department, Briana Cunningham, DEP O&G WQS and I arrived at the site at 11:30 AM to conduct an investigation of the spill incident. We initially met with Kevin Hagadorn, lead flow hand of Erick Flowback Services Incorporated, the Cabot subcontractor in the process of conducting flowback operations on the Bolcato wells. Mr. Hagadorn stated that flowback of the wells is nearly complete and we are cleaning out sand from the wells. Natural gas is sent directly to sales according to Mr. Hagadorn and there is another crew on-site setting the wells up for production. The Department informed Mr. Hagadorn that they had mobilized to the site in order to investigate the spill incident. Mr. Hagadorn contacted Mr. Watson to inform him that the Department was at the site in preparation to assess the spill incident. Upon completion of our conversation with Mr. Hagadorn, the Depar

2552312 Primary Facility 2017-01-11 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:55p.m., the well was recently completed and is in production. The well tag was on the well and correct. The cellar had ice at the bottom, the (20x13) vent pipe was open and venting into a small plastic tank, the (13x9) vent pipe was open and venting into a small plastic tank, the (9x5) vent pipe was open and venting into a small plastic tank. There was 811psi on the production casing. The well was producing through a separator and the production fluid was going into a 500bbl flow back tank that was on containment and the containment appeared to be in good condition. There were three 500bbl tanks at the far corner of the site on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 13:35p.m.

2639541 Primary Facility 2017-09-25 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. It was producing through a sand separator. All the annulus vent lines were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2657161 Primary Facility 2017-11-02 Routine/Complete Inspection No Violations Noted This inspection was conducted as a routine complete inspection. Well site is stable. Any silt sock still present appears as if it could be removed. No violations noted.
2745595 Primary Facility 2018-06-26 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 7.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was a crew on the site putting down stone and rolling the pad. There was also remedial work done on the slopes. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2844245 Primary Facility 2019-02-25 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water and ice 6' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 2/5/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]

References